iso4217:BGNiso4217:BGNxbrli:shares635400E1RWKJXPSBCV072024-01-012024-12-31635400E1RWKJXPSBCV072023-01-012023-12-31635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:IssuedCapitalMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:OtherReservesMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:ReserveOfCashFlowHedgesMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:RevaluationSurplusMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:RetainedEarningsMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:EquityAttributableToOwnersOfParentMember635400E1RWKJXPSBCV072024-01-012024-12-31ifrs-full:NoncontrollingInterestsMember635400E1RWKJXPSBCV072024-01-012024-12-31635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:IssuedCapitalMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:OtherReservesMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:ReserveOfCashFlowHedgesMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:RevaluationSurplusMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:RetainedEarningsMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:EquityAttributableToOwnersOfParentMember635400E1RWKJXPSBCV072023-01-012023-12-31ifrs-full:NoncontrollingInterestsMember635400E1RWKJXPSBCV072023-01-012023-12-31635400E1RWKJXPSBCV072024-12-31635400E1RWKJXPSBCV072023-12-31635400E1RWKJXPSBCV072023-12-31ifrs-full:IssuedCapitalMember635400E1RWKJXPSBCV072023-12-31ifrs-full:OtherReservesMember635400E1RWKJXPSBCV072023-12-31ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember635400E1RWKJXPSBCV072023-12-31ifrs-full:ReserveOfCashFlowHedgesMember635400E1RWKJXPSBCV072023-12-31ifrs-full:RevaluationSurplusMember635400E1RWKJXPSBCV072023-12-31ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember635400E1RWKJXPSBCV072023-12-31ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember635400E1RWKJXPSBCV072023-12-31ifrs-full:RetainedEarningsMember635400E1RWKJXPSBCV072023-12-31ifrs-full:EquityAttributableToOwnersOfParentMember635400E1RWKJXPSBCV072023-12-31ifrs-full:NoncontrollingInterestsMember635400E1RWKJXPSBCV072023-12-31635400E1RWKJXPSBCV072022-12-31ifrs-full:IssuedCapitalMember635400E1RWKJXPSBCV072022-12-31ifrs-full:OtherReservesMember635400E1RWKJXPSBCV072022-12-31ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember635400E1RWKJXPSBCV072022-12-31ifrs-full:ReserveOfCashFlowHedgesMember635400E1RWKJXPSBCV072022-12-31ifrs-full:RevaluationSurplusMember635400E1RWKJXPSBCV072022-12-31ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember635400E1RWKJXPSBCV072022-12-31ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember635400E1RWKJXPSBCV072022-12-31ifrs-full:RetainedEarningsMember635400E1RWKJXPSBCV072022-12-31ifrs-full:EquityAttributableToOwnersOfParentMember635400E1RWKJXPSBCV072022-12-31ifrs-full:NoncontrollingInterestsMember635400E1RWKJXPSBCV072022-12-31635400E1RWKJXPSBCV072024-12-31ifrs-full:IssuedCapitalMember635400E1RWKJXPSBCV072024-12-31ifrs-full:OtherReservesMember635400E1RWKJXPSBCV072024-12-31ifrs-full:ReserveOfGainsAndLossesOnFinancialAssetsMeasuredAtFairValueThroughOtherComprehensiveIncomeMember635400E1RWKJXPSBCV072024-12-31ifrs-full:ReserveOfCashFlowHedgesMember635400E1RWKJXPSBCV072024-12-31ifrs-full:RevaluationSurplusMember635400E1RWKJXPSBCV072024-12-31ifrs-full:ReserveOfExchangeDifferencesOnTranslationMember635400E1RWKJXPSBCV072024-12-31ifrs-full:ReserveOfRemeasurementsOfDefinedBenefitPlansMember635400E1RWKJXPSBCV072024-12-31ifrs-full:RetainedEarningsMember635400E1RWKJXPSBCV072024-12-31ifrs-full:EquityAttributableToOwnersOfParentMember635400E1RWKJXPSBCV072024-12-31ifrs-full:NoncontrollingInterestsMember635400E1RWKJXPSBCV072024-12-31635400E1RWKJXPSBCV072022-12-31
Annual Consolidated Management Report
Consolidated Corporate Governance Statement
Consolidated Non-Financial Information
Consolidated Report on Payments to Governments
Annual Consolidated Financial Statements
Independent Auditors’ Report
Bulgarian Energy Holding EAD
31 December 2024
Translation from Bulgarian
Bulgarian Energy Holding EAD
Contents
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Annual Consolidated Management Report ................. i
Consolidated Corporate Governance Statement ......... ii
Consolidated Non-Financial Information ................. iii
Consolidated Report on Payments to
Governments ............................................................. iv
Annual Consolidated Financial Statements ................ v
Consolidated Statement of Profit or Loss ................... 1
Consolidated Statement of Comprehensive Income .. 2
Consolidated Statement of Financial Position ........... 3
Consolidated Statement of Changes in Equity ........... 5
Consolidated Statement of Cash Flows ..................... 7
Notes to the Consolidated Financial Statements ........ 8
1. Corporate information ..................................... 8
2. Statement of compliance with IFRS Accounting
Standards and application of the going concern
principle .................................................................... 10
3. Changes in the accounting policy .................. 12
3.1. New standards, amendments and interpretations
to IFRS effective from 1 January 2024 ..................... 12
3.2. Standards, amendments and clarifications that
have not yet entered into force and have not been
applied by the Group from an earlier date ................ 13
4. Material Accounting Policy Information ....... 14
5. Segment reporting ......................................... 48
6. Revenue from sales ....................................... 51
7. Other operating income ................................. 55
8. Cost of natural gas, electricity and other current
assets sold ................................................................. 57
9. Costs for acquisition of property, plant and
equipment in an economic way ................................ 57
10. Expenses for materials ................................... 58
11. Hired services expenses ................................. 58
12. Reversal of/(expenses for) impairment of
financial and non-financial assets, net ...................... 59
13. Personnel expenses ........................................ 59
14. Other operating expenses .............................. 59
15. Finance income.............................................. 62
16. Finance costs ................................................. 62
17. Income tax expenses ...................................... 62
18. Earnings per share and dividends .................. 63
19. Property, plant and equipment ....................... 65
20. Intangible assets ............................................ 73
21. Investments accounted for using the equity
method....................................................................... 74
22. Business combinations ................................... 79
23. Trade and other receivables ........................... 80
24. Deferred tax assets and liabilities .................. 85
25. Inventories ..................................................... 86
26. Financial assets at fair value through other
comprehensive income .............................................. 89
27. Cash and short-term deposits ......................... 90
28. Share capital and reserves .............................. 91
29. Loans and lease liabilities .............................. 92
30. Deferred financing ......................................... 97
31. Retirement employee benefit obligations ...... 99
32. Provisions .................................................... 101
33. Deferred income .......................................... 105
34. Related party disclosures ............................. 105
35. Trade and other payables ............................. 108
36. Categories of financial assets and liabilities 109
37. Financial Risk Management Objectives and
Policy 110
38. Fair value measurement ............................... 116
39. Capital management policies and procedures
118
40. Contingent assets, contingent liabilities, and
commitments ........................................................... 118
41. Balance of debt arising from financing activities
with the amounts disclosed in the consolidated
statement of cash flows ........................................... 130
42. Events after the reporting period .................. 130
43. Approval of the consolidated financial
statements ................................................................ 134
Independent Auditors’ Report .................................... vi
BULGARIAN ENERGY HOLDING EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Board of Directors as of the date of issue of the consolidated financial statements
Valentin Aleksiev Nikolov
Ivo Ivanov Todorov
Kalin Boyanov Filipov
Diyan Atanasov Ivanov
Vasil Georgiev Stoynov
Address
Bulgaria
Sofia Region, Sofia Municipality, Sofia 1000
Oborishte District, 16 Veslets str.
Servicing banks
Allianz Bank Bulgaria AD
Bulgarian-American Credit Bank AD
Bulgarian Development Bank AD
D Commerce Bank AD
Central Cooperative Bank AD
Citibank Europe AD, Bulgaria Branch
Eurobank Bulgaria AD
European Investment Bank
First Investment Bank AD
ING Bank N.V. – Sofia Branch
Investbank AD
Municipal Bank AD
DSK Bank AD
United Bulgarian Bank AD
UniCredit Bulbank AD
International Investment Bank
National Bank of Greece
Auditor
DZZD Audit BEH with participants in the merger of auditing companies Grant Thornton OOD and
Zaharinova Nexia EOOD, registered respectively under Reg. No.032 and Reg. No.138 in the Register
of Registered Auditors
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
2
1. General
Company name BULGARIAN ENERGY HOLDING EAD (BEH EAD)
UIC 831373560
Address Bulgaria
Sofia Province, Sofia Municipality
City of Sofia 1000
Oborishte district
8 Veslets str.
Scope of Business Activity Acquisition, management, evaluation and sale of shares in
commercial companies, operating in the fields of production,
extraction, transmission, transit, storage, management,
distribution, sale and/or purchase of natural gas, electricity,
thermal energy, coal, as well as all kinds of energy and raw
materials for its production, participation in the management of
such companies, their financing, acquisition, evaluation,
issuance and sale of bonds, acquisition, evaluation and sale of
patents, sub-licensing for the use of patents to the above-
mentioned companies, as well as carrying out its own production
or commercial activity.
Directors As of 31 December 2024, the Company is managed by a
Board of Directors (BOD) with members:
Veselina Lachezarova Kanatova-Buchkova
Chairperson of the BD
Kalin Boyanov Filipov
Vice-Chairperson of the BD
Valentin Aleksiev Nikolov
Member of the BD and Executive Director
Galina Tsvetanova Todorova
Member of the BD and Executive Director
Ivo Ivanov Todorov
Member of the BD
The Company is represented by the Executive Directors.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
3
Bulgarian Energy Holding EAD (parent company) together with its subsidiaries form an
economic group. The holding structure is presented in the chart below:
Structure of Bulgarian Energy Holding EAD as of 31 December 2024
The Company is the sole owner of the capital of the following subsidiaries:
NPP Kozloduy EAD
Scope of Business Activity Use of nuclear energy for generation of electricity and thermal
power, which activity is performed in the presence and
maintenance of: valid license for generation of electric and
thermal power by an electric power generation facility specified
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
4
in the license, valid licenses for operation of nuclear facilities
pursuant to the Safe Use of Nuclear Energy Act (SUNEA),
issued by the Nuclear Regulatory Agency (a valid authorization
for production activities carried out by the power generation
facility specified in it, issued by the Inspectorate on the Safe Use
of Nuclear Energy for Peaceful Purposes);
Import and export of fresh and spent nuclear fuel;
Investment activity related to the activity of the company,
specified in the scope of activity;
Construction, assembly and repair activities in the field of
electric and thermal power generation;
Sale of high and medium voltage electric and thermal power.
Operation of radioactive waste management facilities according
to a valid license under the Safe Use of Nuclear Energy Act
(SUNEA).
Directors The company is managed by a Board of Directors and as of 31
December 2024 is represented by the Executive Director Ivan
Todorov Andreev.
Licenses The company holds the following licenses:
– License for operation of nuclear facility, series E,
registration No.5303 dated 03.11.2017, in force since
06.11.2017, for operation of Unit 5 of NPP Kozloduy, with
unlimited validity;
– Nuclear Installation Operation License, Series E -
Registration No.5535, dated 03 October 2019, for the operation
of the Unit 6 of NPP Kozloduy, with unlimited validity;
– Electricity and Heat Production License No.Л-049-
03/11.12.2000, for a period of 30 years;
– Heat Transmission License No.050-05/11.12.2000; for a
period of 30 years;
– Nuclear Facility Operation License - Series E, Reg.
No.6200/20.06.2024, effective from 26.06.2024, for operation
of the Spent Nuclear Fuel Storage Facility of NPP Kozloduy,
issued by the Nuclear Regulatory Agency, with unlimited
validity;
– License Series O, reg. No.6149/21.03.2024, effective from
01.04.2024 for the use of sources of ionizing radiation for
business purposes - performing non-destructive control with
radiation methods, issued by the Nuclear Regulatory Agency.
License term - 01.04.2034
– License Series O, reg. No.6147/20.03.2024, in force since
08.04.2024 for the use of sources of ionizing radiation for
business purposes - radiochemical control, radiation monitoring
of the environment and metrological control, issued by the
Nuclear Regulatory Agency. License term - 08.04.2034
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
5
– License, Series T, reg. No.6195/19.06.2024, effective from
12.07.2024 for transport of radioactive substances, issued by the
Nuclear Regulatory Agency. License term - 12.07.2034
– Electricity Trading License No.Л-216-15/18.12.2006, valid
until 18.12.2026;
– License Series SO, reg. No.5794, in force since 05.10.2021 for
carrying out specialized training for activities in nuclear
facilities and with sources of ionizing radiation that have an
impact on safety and for issuing certificates of competence to
persons professionally engaged in activities in nuclear facilities
and with sources of ionizing radiation, beyond those under
Article 64, paragraph 1, item 1 and item 2 of the Safe Use of
Nuclear Energy Act - issued by the Nuclear Regulatory Agency.
License term: until 05.10.2026;
– License for operation of Dry Storage Facility for Spent
Nuclear Fuel from VVER-440 Reactors, issued by the Nuclear
Regulatory Agency, Series E, reg. No.5016 of 28.01.2016, with
unlimited validity;
Investments in enterprises NPP Kozloduy EAD is the sole owner of the capital of NPP
Kozloduy EAD, NPP Kozloduy - New Builds EAD, NPP
Construction Supervision EOOD and NPP Service EOOD
and has a controlling interest of 63.96% in
Interpriborservice OOD, Kozloduy, holding 71 shares of its
equity. The Company has a minority share of 1.12% in ZAD
Energy AD.
Bulgargaz EAD
Scope of Business Activity Public supply of natural gas and related purchases and sales,
purchase of natural gas for storage in a gas storage facility,
market research and analyses of the natural gas market in the
country.
Directors The Company is managed by a Board of Directors and as of 31
December 2024 is represented by the Executive Director Veselin
Sashev Sinabov.
Licenses Individual license for public supply of natural gas on the
territory of the Republic of Bulgaria - License No.Л-214-14
dated 29 November 2006, issued by the Energy and Water
Regulatory Commission for a period of 35 years.
Pursuant to Art. 21, para. 1, item 1 and in connection with Art.
39, para. 1, item 5 of the Energy Act with a decision of the
Energy and Water Regulatory Commission dated 16.09.2021
Bulgargaz EAD acquired a license for trading in natural gas
No.А0435 for a period of 10 years.
The Company holds a license for trading in natural gas in the
territory of the Hellenic Republic - Decision No.247/2020, for
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
6
an indefinite term and Decision No.311/2022 for trading in
natural gas in the territory of the Hellenic Republic, for a term
of 20 years, issued by the Greek Energy Regulatory Authority -
RAE.
The Company holds a perpetual license for the supply of natural
gas No.2023P 0370 dated 20 June 2023 issued by the Regulatory
Authority for Network Industries of the Slovak Republic.
On 12.12.2024, by Decision No.H4955/2024, the Hungarian
Energy and Utilities Regulatory Office granted the Company a
license to trade in natural gas in Hungary, valid from the date of
notification for an indefinite period.
Bulgartransgaz EAD
Scope of Business Activity Storage and transmission of natural gas; maintenance,
operation, management and development of gas transmission
grids; maintenance, operation, management and development of
underground gas storage facilities; development of programs
and activities for ensuring the compliance of the natural gas
transmission and storage activities with the requirements of the
European energy legislation; development of pricing policy for
access to and transmission on the gas grids, storage of natural
gas and connection to gas transmission grids; administration of
natural gas transactions and arranging the balancing of the
natural gas market in compliance with the requirements of the
current legislation; engineering, investment, manufacturing and
service activity; import of goods, machinery and equipment
related to the company's operations; centralized operational
management, coordination and control on the operation of gas
transmission grids.
Directors The Company is managed and represented by a Board of
Directors and as of 31 December 2024 the CEO is Kiril
Dimchov Ravnachki.
Licenses The Company holds licenses issued by the Energy and Water
Regulatory Commission (EWRC) as follows:
− License No.L-214-09 dated 29 November 2006 for
transmission of natural gas on the territory of the Republic of
Bulgaria, for a period of 35 years;
− License No.L-214-06 dated 29 November 2006 for
transmission of natural gas on the territory of the Republic of
Bulgaria, for a period of 35 years;
− License No.L-214-10 dated 29 November 2006 for storage
of natural gas on the territory of the Republic of Bulgaria for a
period of 35 years.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
7
Investments in enterprises Bulgartransgaz EAD is the sole owner of the capital of
Balkan Gas Hub EAD and owns 50% of the shares of
Bulgartel AD, and 20% of the capital of Gastrade S.A.
Mini Maritsa Iztok EAD
Scope of Business Activity Coal extraction and marketing, industrial, commercial,
leasing, repair, external economic activities, training and
retraining of personnel for coal mining for the purpose of
income generation, carrying out preventive maintenance
and rehabilitation activities in rest stations owned by the
company, trading in electricity, carrying out rail freight
transport, as well as other activities not prohibited by law.
Directors The Company is managed by a Board of Directors and as of 31
December 2024 is represented by the Executive Director, Todor
Dimchev Todorov.
Licenses The Company holds the following Licenses:
− license for “electricity trading” No.L-480-15 dated 20
October 2016 issued by EWRC for a period of 10 years.
− license issued by the Ministry of Transport, Information
Technology and Communications for transportation “Rail
freight”, issued in 2016 for a period of 5 years. The license was
updated on 14.05.2021 and it is valid until 13.05.2026.
Investments in enterprises Mini Maritsa Iztok EAD holds a minority share of 3.68% in
ZAD Energy.
TPP Maritsa East 2 EAD
Scope of Business Activity Generation of electric and thermal power, transmission and
distribution of thermal power, construction and repair works in
the electric and thermal power sector, construction and repair
works in the field of electric and thermal power generation,
investments, acquisition and management of copyrights, rights
on inventions, trademarks and industrial designs, know-how and
other intellectual property, as well as any other activity not
prohibited by law or regulation, and when authorization or
license is required – after such an authorization or license is
obtained.
Directors The Company is managed by a Board of Directors and, as of 31
December 2024, is represented by the Executive Director, Diyan
Stanimirov Dimitrov.
Licenses The Company holds the following licenses issued by EWRC as
follows:
− Licence for generation of electric power L-091-01 dated 21
February 2001 valid for a period of 20 years; By Decision № I1-
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
8
L-091 dated 02 July 2020, the term of the license was extended
for a further 20 years from the expiry date of the license - 24
March 2021.
− License for trading with electric power No.L-498-15 dated 31
January 2018 valid for a period of 10 years;
Investments in enterprises The Company holds a minority share of 0.96% in ZAD Energy.
Natsionalna Elektricheska Kompania EAD (NEK EAD)
Scope of Business Activity Production of electricity, centralized purchase and sale of
electricity, supply of electricity to consumers connected to the
transmission grid, import and export of electricity, construction
and repair activities in the field of electricity production,
investment activities, implementation and promotion of energy
efficiency in energy production.
Directors The Company is managed by a Board of Directors and as
of 31 December 2024 is represented by the Executive
Director Martin Ivanov Georgiev.
Licenses The Company holds licenses issued by EWRC as follows:
− License No.L-147-13 dated 17 December 2004 for the
public supply of electricity for a term of 35 years, supplemented
by a special balancing group coordinator;
− License No.L-073-01 dated 14 February 2001 for power
generation from HPP and PSHPP, valid for a period of 35 years;
− License No.1-230-15 dated 4 June 2007, for trading in
electricity for a period of 10 years, supplemented by a standard
balancing group coordinator. By Decision No.I2-L-230 of
the Energy and Water Regulatory Commission (EWRC)
of 15 September 2016, the term of the license for the
trading in electricity activity including the rights and
obligations of the coordinator of the standard balancing
group was extended by 10 years - until 4 June 2027;
− License No.L-408-17 dated 1 July 2013 for supply of
electricity from a supplier of last resort, valid for a period
of 26 years. (Decision No.I1-L-408/29.01.2014 amending
/supplementing License No.L-408-17/01.07.2013, issued for
the activity “supply of electricity from a supplier of last resort”
with the rights and obligations of a coordinator of a special
balancing group).
Internal structural units NEK EAD, Hydro Power Plants Enterprise, Plovdiv – performs
electricity generation, construction and maintenance of hydro
power generation facilities, investment activity.
NEK EAD, Dams and Cascades Company, Sofia performs
technical operation and maintenance of dams and hydro power
facilities.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
9
Investments in enterprises NEK EAD holds 27% of the capital of ContourGlobal Maritsa
Iztok 3 AD, 27% of the capital of ContourGlobal Operations
Bulgaria AD, 42% of the capital of ZAD Energia, 34 % of
Allianz Bulgaria Pension Insurance Company AD, 24% of the
capital of HPC Gorna Arda AD.
Electricity System Operator EAD (ESO EAD)
Scope of Business Activity Transmission of electricity, unitary operational planning,
coordination and management of the electricity system of the
Republic of Bulgaria, provision and management of third party
access on a non-discriminatory basis to grid users or groups of
grid users, implementation of the joint operation of the
electricity system with the electricity systems of other
countries, coordinated development and interoperability of the
electricity transmission grid with interconnected electricity
transmission grids, expansion, reconstruction, modernization,
operation, maintenance and provision of the reliable operation
of the electricity transmission grid, including the availability of
all necessary ancillary services, maintenance and development
of auxiliary grids, repairs and services in the field of energy,
other commercial activities and services that are not prohibited
by law.
Directors The Company is managed and represented by a Board of
Directors and as of 31 December 2024 the CEO is Angelin
Nikolaev Tsachev.
Licenses The Company holds the following licenses issued by EWRC:
− License for transmission of electricity No.L-419-04 dated
18 December 2013, valid for a period of 35 years.
− License No.L-221-17 dated 28 December 2006 for the
activity “Management of the Electricity System” (amended by
Decision No.I1-L-221-17 dated 29 September 2008). The
validity of the license is until 17.12.2039.
Investments in enterprises Electricity System Operator EAD is the sole owner of the
capital of ESO Engineering EOOD, ESO Project EOOD, ESO
Charge EAD, owns 50% of the capital of Bulgartel AD and
33.33% of the capital of SEleNe CC.
National Energy Operator EAD (NEO EAD)
Scope of Business Activity Construction and operation of electric power facilities
Directors The Company is managed and represented by a Board of
Directors and as of 31 December 2024 the Executive Director
is Aleksandar Zdravkov Mihailov.
Minproekt EAD
Scope of Business Activity Design and construction, scientific research, engineering and
consulting activities related to coal mining in Bulgaria,
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
10
Basis for preparation of the consolidated financial statements
BEH EAD operates in compliance with the Bulgarian and the European legislation. The consolidated
financial statements of the Group are prepared in accordance with IFRS Accounting Standards
developed and published by the International Accounting Standards Board and adopted by the European
Union.
Responsibility of Management
The Management confirms that an adequate accounting policy has been applied in the preparation of the
consolidated financial statements for 2024 and they have been prepared on a going concern basis.
The management is responsible to keep proper accounting records, to carry out appropriate asset
management and to undertake the measures necessary to avoid and detect any possible frauds and other
irregularities.
The consolidated management report for 2024 is prepared in accordance with art. 45 of the Accountancy
Act and art. 247 of the Commercial Act and is approved by the Board of Directors of Bulgarian Energy
Holding EAD.
2. Incorporation, management and structure
Legal status
Parent company
BEH EAD is a sole owner joint-stock company, established in 2008, following the change of the
company's name, statute and subject of activity of Bulgargaz Holding EAD, and the capital of the
company was increased through par value distribution of all shares from the capital of Natsionalna
Elektricheska Kompania EAD, NPP Kozloduy EAD, TPP Maritsa East 2 EAD and Mini Maritsa Iztok
EAD. In this way, all state energy companies operating in the sphere of production, extraction,
transmission and trade with energy resources, have been integrated in the structure of BEH EAD.
The sole owner of the capital of BEH EAD is the Republic of Bulgaria and the rights of a sole owner
are exercised by the Minister of Energy who has the capacity of a principal and is empowered to make
all decisions within the competence of the sole owner of the capital according to the law and the Articles
of Association of the Company.
The company is managed through a one-tier management system. The management bodies are:
• Sole owner of the capital in its capacity of General Assembly - the Minister of Energy of the
Republic of Bulgaria;
• The Board of Directors.
notwithstanding whether by open or underground method.
Testing of blast protection equipment and explosives
Directors The Company is managed and represented by a Board of
Directors and as of 31 December 2024 the Executive Director
is Kostadin Hristov Hristov.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
11
At the date of preparation of these annual consolidated financial statements, there are no plans for
privatization of the company, it is included in the list of state companies not subject to privatization -
Appendix No.1 to art. 3, para. 1 of the Privatization and Post-Privatization Control Act.
Companies in the Bulgarian Energy Holding Group
NPP Kozloduy EAD was established on 28 April 2000 by Decision No.7 dated April 2000, company
case 582/2000 of Vratsa District Court. The Company has its headquarters and registered office at: City
of Kozloduy, Vratsa Province, NPP site, telephone code 0973, postal code 3320. The sole owner of the
capital of NPP Kozloduy EAD since 18 September 2008 is BEH EAD.
HPP Kozloduy EAD was registered in Vratsa District Court with company case No.495 dated 2004
with the purpose of building a hydroelectric plant, generation and distribution of electricity from small
hydroelectric power plant for utilization of the residual resource of the spent water from NPP Kozloduy
EAD. The sole owner of the capital of HPP Kozloduy EAD is NPP Kozloduy EAD.
NPP Kozloduy - New Builds EAD was established on 9 May 2012 by the issuance of 200,000 ordinary
registered shares with a nominal value of BGN 10. The company is engaged in the construction of power
units of a nuclear power plant. The Company's capital is BGN 1,816,800,000 divided into 181,680,000
ordinary registered shares with a par value of BGN 10 each. The sole owner of the capital of NPP
Kozloduy - New Builds EAD is NPP Kozloduy EAD.
NPP Construction Supervision EOOD was entered in the Commercial Register at the Registry Agency
with UIC 206736961, headquarters and registered office: Vratsa province, Kozloduy municipality, town
of Kozloduy, site of NPP Kozloduy on 25.11.2021 with capital BGN 5 thousand. NPP Kozloduy EAD
is the sole owner of the capital of NPP Construction Supervision EOOD, consisting of 50 (fifty) shares,
each with a nominal value of BGN 100.00.
NPP SERVICE EООD was entered in the Commercial Register and the Register of Non-Profit Legal
Entities with the Registry Agency with UIC: 206858488, headquarters and registered office Vratsa
province, Kozloduy municipality, town of Kozloduy, Kozloduy site on 11.03.2022 with capital BGN
750 thousand. NPP Kozloduy EAD is the sole owner of the capital (100%) consisting of 1000 (one
thousand) shares, each with a nominal value of BGN 750.
Interpriborservice OOD (in bankruptcy) was established by Decision № 55 of the Council of Ministers
of 13 April 1988 as a specialized enterprise for installation, adjustment, repair, technical service of
automated process control systems, supply of instruments, equipment and spare parts for NPP, TPP, etc.
Partners in the established company are Russian and Ukrainian companies working in the field of
energy. NPP Kosloduy EAD had a controlling interest of 63.96% in Interpriborservice OOD (in
bankruptcy), Kozloduy, representing 71 shares of its capital, which is in total 111 shares of BGN 100
each. On 11 September 2023, the company was declared bankrupt by a decision of the Vratsa District
Court.
Bulgargaz EAD was registered in Bulgaria in accordance with the Commercial Act. The Company was
entered in the Commercial Register under No.113068, volume 1534, page 35, company case №
16440/2006 and was registered on the basis of Decision № 1 dated 15 January 2007. The Company has
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
12
headquarters and registered office at: Sofia municipality, Sofia 47 Petar Parchevich Str. The sole owner
of the capital of Bulgargaz EAD is BEH EAD.
Bulgartel EAD was registered under company case No.13115/2004 in accordance with the Commercial
Act by a decision of the Sofia City Court dated 30 November 2004. The Company's headquarters and
registered office is: Sofia, Lyulin Municipality, Residential Area Lyulin 2, 66 Pancho Vladigerov Blvd.
The owners of the capital of Bulgartel AD are Electricity System Operator EAD and Bulgartransgaz
EAD with a 50% share each.
Bulgartel Skopje DOOEL is a sole owner joint-stock company registered in the Central Registry of
the Republic of Macedonia on 3 December 2008 under No.643867. The company registered office and
address of management is in Macedonia, city of Skopje, Orce Nikolov Str. The sole owner of the capital
of Bulgartel Skopje DOOEL is Bulgartel EAD.
Bulgartransgaz EAD was registered in accordance with the Commercial Law by Decision No.1 dated
15 January 2007 by Sofia City Court under No.113067, Volume 1543, p. 32, company case
No.16439/2006. The Company's headquarters and registered office is: Sofia, Lyulin Municipality,
Residential Area Lyulin 2, 66 Pancho Vladigerov Blvd. The sole owner of the capital of Bulgartransgaz
EAD is BEH EAD.
Balkan Gas Hub EAD is a sole joint stock company with registered office in the Republic of Bulgaria,
incorporated in the Commercial Register and the Register of Non-Profit Organizations with the Registry
Agency under UIC 205478458 on 18 January 2019. The Company’s registered office is Bulgaria, Sofia,
Lyulin Municipality, Residential Area Lyulin 2, 66 Pancho Vladigerov Blvd. The sole owner of the
capital of Gas Hub Balkan EAD is Bulgartransgaz EAD.
Mini Maritsa Iztok EAD was registered under company case No.2444/1993, reg. 1, vol. 1, p. 12, lot 6
by Stara Zagora District Court in accordance with the Commercial Law by Decision No.2773 dated 7
July 1993. The Company headquarters and registered office: Radnevo, Stara Zagora district, 13 Georgi
Dimitrov str. The sole owner of the capital of Mini Maritsa-Iztok EAD is BEH EAD.
Natsionalna Elektricheska Kompania EAD was registered in accordance with the Commercial Act
by Sofia City Court under No.196, volume 5, p. 98, under company case No.29869/1991. The
Company's headquarters and registered office is: Sofia, 5 Veslets str. The sole owner of the capital of
NEK EAD is BEH EAD.
Electricity System Operator EAD (ESO EAD) was registered in accordance with the Commercial Act
by Sofia City Court by Decision No.1 of 4 January 2007, under company case No.16298/2006, lot
No.112765, volume 1528, register 1, page 53. The Company's registered office and address of
management is Sofia, Vitosha district, 201 Tsar Boris III Blvd. The sole owner of the capital of ESO
EAD is BEH EAD.
ESO Engineering EOOD was registered in the Commercial Register and the Register of Non-Profit
Legal Entities with the Registry Agency on 18 February 2021 with UIC/PIC 206401308. The registered
office of the company is. Sofia, 24 Petko Yu. Todorov blvd. The sole owner of the capital of the company
is Electricity System Operator EAD.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
13
ESO Proekt EOOD was registered in the Commercial Register and Register of Non-Profit Entities to
the Registry Agency on 26.04.2022. Its headquarters and registered office is: city of Sofia, postal code
1404, 24 Petko Yu. Todorov blvd. The sole owner of the capital of the company is Electricity System
Operator EAD. The company capital is BGN 250,000, divided into 2,500 (two thousand five hundred)
shares with a nominal value of BGN 100 (one hundred) each.
ESO Charge EAD is registered in the Commercial Register at the Registry Agency on 29.03.2024
under UIC 207774922, with registered office in Sofia, postal code 1404, 24 Petko Yu. Todorov blvd.
The company's capital is BGN 1,000,000 divided into 10,000 ordinary registered shares with a nominal
value of BGN 100 each. The sole owner of the capital of the company is Electricity System Operator
EAD.
TPP Maritsa Iztok 2 EAD was registered by decision No.2591 dated 30 June 2000 of Stara Zagora
Regional Court in accordance with the Commercial Act under company case 1338/2000, reg. 1, vol. 2,
p. 46, lot 23. The Company has its headquarters and registered office at: Kovachevo, Stara Zagora
province The sole owner of the capital of TPP Maritsa Iztok 2 EAD is BEH EAD.
National Energy Operator EAD is a joint-stock company established on 4 April 2023, as a sole
proprietorship with sole owner Bulgarian Energy Holding EAD. The Company has its headquarters and
registered office at: City of Sofia 1000, Oborishte district, 16 Veslets str. and the address for
correspondence is Sofia 1000, Oborishte district, 16 Stara planina str., office #3.
Minproekt EAD is a joint-stock company with sole owner Bulgarian Energy Holding EAD. The
company joined the BEH EAD group on 07.12.2023.
The company is based at: City of Sofia 1756 Studentski district, 14, Kliment Ohridski blvd.
No separate branches of the enterprise are set up in the structure of BEH EAD.
History of the parent company
BEH EAD is the successor of the State Oil and Gas Company, founded in 1973, renamed to
Gazosnabdyavane in December 1975. In accordance with the Decree on Business Activities, in the
beginning of 1990, the Company was renamed to Bulgargaz. Bulgargaz was transformed into a sole-
owner joint-stock company by order of the Council of Ministers of 12 May 1993.
With a transformation plan dated 27 October 2006 and its annexes, Bulgargaz EAD was transformed
into Bulgargaz Holding EAD by the separation of two separate sole joint-stock companies –
Bulgartransgaz EAD and Bulgargaz EAD pursuant to the provisions of Article 262 (d) of the
Commercial Act. Bulgartransgaz EAD and Bulgargaz EAD are legal successors of the respective portion
of the property (rights and obligations) of Bulgargaz Holding EAD. The transformation was registered
in the court by decision No.45 dated 15 January 2007 of the Sofia City Court.
With Protocol No.RD-21-305 of 18 September 2008, the Minister of Economy and Energy changes the
company name, the Articles of Association and the scope of activity of Bulgargaz Holding EAD and
establishes Bulgarian Energy Holding EAD, the capital is increased by in-kind contribution at par value
of all shares of the capital of Natsionalna Elektricheska Kompania EAD, NPP Kozloduy EAD, TPP
Maritsa East 2 EAD and Mini Maritsa Iztok EAD.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
14
Information under Art. 187e and Art. 247, para. 2 of the Commercial Act
Share capital
As of 31 December 2024, the share capital of the parent company BEH EAD is BGN 3,463,941,744,
distributed into 3,463,941,744 shares with a nominal value of BGN 1 each. The entire amount of the
Company capital is subscribed and paid in full. The company's shares are ordinary, registered, non-
preferred, with voting rights.
The Company does not possess any own shares. In 2024, the Company did not acquire or transfer its
own shares.
Information regarding the remuneration of the members of the Board of Directors of Bulgarian
Energy Holding EAD and its subsidiaries under management and control contracts
The remuneration of the members of the Board of Directors of Bulgarian Energy Holding EAD
and its subsidiaries is as follows:
Remuneration of key management personnel
thousand BGN 2024 2023
Remuneration 5,664 4,739
Social security 363 322
Social costs 892 832
Total 6,919 5,893
Information regarding the acquisition and holding of company shares by the members of the
Board of Directors
The members of the Board of Directors do not own shares of the companies. They do not have privileges
or exclusive rights to acquire shares and bonds of the companies. All shares of BEH EAD are owned by
the State, and the shares of NPP Kozloduy EAD, Bulgargaz EAD, Bulgartransgaz EAD, Mini Maritsa-
Iztok EAD, NEK EAD, TPP Maritsa East 2 EAD, Minproekt EAD, NEO EAD and ESO EAD are 100%
owned by BEH EAD.
Information on the participation of the members of the Board of Directors in companies as
unlimited partners, holding more than 25 per cent of the capital of another company, as well as
their participation in the management of other companies or cooperatives as procurators,
managers or members of boards for the period 01.01.2024 - 31.12.2024:
Veselina Lachezarova Kanatova-Buchkova – Chairman of the Board of Directors of Bulgarian
Energy Holding EAD as of 31.12.2024. She does not hold any interest as an unlimited shareholder, does
not own more than 25 per cent of the capital of any other company, and does not participate in the
management of any other company or cooperative as a procurator, manager or member of the board.
Kalin Boyanov Filipov – Vice Chairperson of the Board of Directors of Bulgarian Energy Holding
EAD as of 31.12.2024. He does not hold any interest as an unlimited partner, does not own more than
25 per cent of the capital of any other company, and does not participate in the management of any other
company or cooperative as a procurator, manager or member of the board.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
15
Valentin Aleksiev Nikolov – Executive Director of Bulgarian Energy Holding EAD and member of the
Board of Directors since 04.07.2024 and as of 31.12.2024 holds more than 25 percent of the capital of
the following companies: SUZVEZDIE LUV OOD, UIC: 202787168 – sole owner of the capital until
10.01.2024 and partner with 49% participation in the capital from 10.01.2024 until now; MDV
CONSULT Ltd, UIC: 203320833 – Partner with 50 percent participation in the capital until the present
moment. Until 04.07.2024, he participated in the management as Executive Director and member of the
Board of Directors of the following company: Kozloduy NPP EAD, UIC: 106513772.
Galina Tsvetanova Todorova – Executive Director of Bulgarian Energy Holding EAD and member of
the Board of Directors since 04.07.2024 and as of 31.12.2024 does not have any participation as an
unlimited partner, does not own more than 25 percent of the capital of another company, and does not
participate in the management of other companies or cooperatives as a procurator, manager or member
of the board.
Ivan Todorov Andreev – Executive Director of Bulgarian Energy Holding EAD and member of the
Board of Directors until 04.07.2024. Has participation as a member of the Supervisory Board in the
following company: ALLIANZ BULGARIA PENSION COMPANY AD, UIC: 121050885. Since
04.07.2024, he has participated in the management as Executive Director and member of the Board of
Directors of the following company: Kozloduy NPP EAD, UIC: 106513772.
Diyan Stanimirov Dimitrov – Member of the Board of Directors of Bulgarian Energy Holding EAD
until 04.07.2024. Since 04.07.2024 he has participated in the management as Executive Director and
Member of the Board of Directors of the following company: TPP Maritsa East 2 EAD, UIC:
123531939.
Ivo Ivanov Todorov – Member of the Board of Directors of Bulgarian Energy Holding EAD as of
31.12.2024, does not have any participation as an unlimited partner, does not own more than 25 percent
of the capital of another company, and does not participate in the management of other companies or
cooperatives as a procurator, manager or member of the board.
Information on contracts pursuant to Art. 240b of the Commercial Act
The Company has not entered into contracts with members of the Board of Directors, other than
management and control contracts, as well as with parties related to them.
Personnel
Number of personnel:
2024
reported
2023
reported
% of change
2024/2023
19,066 19,604 (2.74%)
Labor productivity - revenue/number of employees (in thousand BGN)
2024
reported
2023
reported
% of change
2024/2023
463.73 587.77 (21.10%)
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
16
Associated parties
As of 31 December 2024, BEH Economic Group has interests in the following joint ventures accounted
for using the equity method in the consolidated financial statements:
Company Country of
incorporation Core Business 2024 Amount of
investments
% thousand BGN
Joint ventures
ICGB AD Bulgaria construction and operation of
a gas transmission system 50.00% 76,392
South Stream Bulgaria
AD Bulgaria construction and operation of
a gas transmission system 50.00% 10,131
SEleNe CC Greece
coordinating the security of
the electricity network in
Southeast Europe
33.33% 4,571
Gastrade S.A. Greece construction of a liquefied
natural gas terminal 20.00% 33,503
Total joint ventures 124,597
As of 31 December 2024, BEH Economic Group has interests in the following associates accounted
for using the equity method in the consolidated financial statements:
Company Country of
incorporation Core Business 2024 Amount of
investments
% thousand BGN
Associates
ContourGlobal
Maritsa Iztok 3 AD Bulgaria generation of electricity 27.00% 52,490
Contour Global
Operations Bulgaria
AD
Bulgaria operation and maintenance of
a thermal power plant 27.00% 2,756
ZAD Energy Bulgaria Insurance company 48.08% 13,185
Allianz Bulgaria
Pension Company AD Bulgaria Pension insurance company 34.00% 32,873
Total associates 101,304
3. Main results for 2024
3.1. Financial result
The reported net financial result of the Group for 2024 is a profit of BGN 246,177 thousand, with an
annual decrease of BGN 864,255 thousand compared to the result in 2023. The change in the financial
result was mainly influenced by the recorded decrease in revenues in each of the Group's business
segments. An analysis of the financial performance of BEH Group by business segments, as well as the
main factors affecting the activities of the Holding companies, is presented below in this section.
The change for each of the main components forming the financial result is presented in the table below:
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
17
Financial results 2024 2023 Change 2024/2023
thousand
BGN
thousand
BGN
thousand
BGN (%)
Total revenue 8,841,436 11,522,622 (2,681,186) (23.27%)
Book value of natural gas, electricity
and other current assets sold (3,405,516) (5,340,727) 1,935,211 36.23%
Operating expenses (4,979,592) (4,853,185) (126,407) (2.60%)
Financial costs, net (103,751) (132,362) 28,611 21.62%
Profit from business combination - 14,446 (14,446) (100.00%)
Profit on sale of investment in joint
venture - 271 (271) (100.00%)
Share of profit from equity accounted
investments 3,716 44,496 (40,780) (91.65%)
Income tax expenses (110,116) (145,129) 35,013 24.13%
Net profit 246,177 1,110,432 (864,255) (77.83%)
BEH EAD was established as a corporate structure uniting the state energy companies. The main
revenues of the Group originate from transmission, storage and sale of natural gas, electricity generation,
transmission and sale of electricity, as well as coal mining and sale.
Taking into account the characteristics of the current market model, the activities of the companies and
their financial results depend on the influence of external factors related to the macroeconomic factors
and market trends, as well as to the market regulation models applied by the independent regulatory
authority – Energy and Water Regulatory Commission (EWRC/the Commission).
The current market model provides for the existence of companies carrying out the functions of a public
supplier of electricity and natural gas. As of 31.12.2024, these functions are performed by two
companies of the BEH Group structure – Natsionalna Elektricheska Kompania EAD – public electricity
supplier and Bulgargaz EAD - public natural gas supplier. In their capacity of public suppliers, both
companies are subject to regulation by EWRC, and the Commission determines the selling prices of
electricity and natural gas at which the companies sell their products to the end suppliers. Due to the
imperfections of the pricing models used on the regulated market existing in the past, especially on the
electricity market, significant price deficits have been generated in the past that have had an impact on
the financial performance and the position of the companies in the Group.
In 2024, BEH Group's earnings before interest, taxes, depreciation and amortization (EBITDA)
decreased by 37.68% on an annual basis and amounted to BGN 1,388,833 thousand compared to BGN
2,228,613 thousand reported in 2023. The Group's operating result at the level of earnings before interest
and taxes (EBIT) for 2024 is a profit of BGN 456,328 thousand, which is BGN 872,382 thousand less
than the operating profit reported a year earlier.
The total assets increased from BGN 27,709,085 thousand at the end of 2023 to BGN 30,091,566
thousand as of 31.12.2024. The reported increase is mainly due to a higher book value of property, plant
and equipment during the period under review, which at the end of 2024 amounted to BGN 21,083,539
thousand compared to BGN 19,084,434 thousand at the end of the previous year. The amount of assets
as of 31.12.2024 is also affected by the increase in trade and other receivables.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
18
Working capital remains positive at BGN 3,291,871 thousand as of 31.12.2024, which means that the
Group is able to cover its short-term liabilities with its current assets.
The table below sets out information on the key indicators of the Group's financial position as of 31
December 2024.
Key indicators 2024 2023 Change 2024/2023
thousand BGN thousand
BGN
thousand
BGN (%)
Total revenue 8,841,436 11,522,622 (2,681,186) (23.27%)
Total expenses (8,385,108) (10,193,912) 1,808,804 17.74%
EВIТDA 1) 1,388,833 2,228,613 (839,780) (37.68%)
EВIТ 2) 456,328 1,328,710 (872,382) (65.66%)
EВТ 3) 356,293 1,255,561 (899,268) (71.62%)
EВIТDA margin 15.71% 19.34% (3.63 p.p.) -
Total assets 30,091,566 27,709,085 2,382,481 8.60%
PPE 4) 21,083,539 19,084,434 1,999,105 10.48%
Working capital 5) 3,291,871 5,608,761 (2,316,890) (41.31%)
Cash 3,699,884 3,878,394 (178,510) (4.60%)
Equity 19,946,205 18,336,668 1,609,537 8.78%
1) EВIТDA – earnings before interest, taxes, depreciation, amortization and
profit in associated and jointly controlled entities;
2) EВIТ – earnings before interest, taxes and profit in associated and
jointly controlled entities;
3) EВТ – earnings before taxes;
4) PPE –property, plant and equipment;
5) Working capital – current assets minus current liabilities
The reported financial results by different types of segments are presented below:
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
19
• Electricity Segment
Electricity 2024 2023 Change 2024/2023
thousand
BGN
thousand
BGN
thousand
BGN (%)
Revenues from sales:
- external customers 6,267,236 7,876,206 (1,608,970) (20.43%)
- other segments 1,657,716 941,215 716,501 76.13%
Segment Revenue 7,924,952 8,817,421 (892,469) (10.12%)
Changes in production and WIP balances 14,089 4,928 9,161 185.90%
Costs for acquisition of property, plant and
equipment 61,858 46,872 14,986 31.97%
Costs of natural gas, electricity and other
current assets sold (3,431,763) (3,781,408) 349,645 9.25%
Expenses for materials (683,787) (1,024,452) 340,665 33.25%
Hired services expenses (430,287) (390,779) (39,508) (10.11%)
Depreciation, amortisation and impairment (521,841) (513,369) (8,472) (1.65%)
Personnel expenses (901,771) (843,943) (57,828) (6.85%)
Impairment of sales receivables, net 17,082 14,457 2,625 18.16%
Net impairment of property, plant and
equipment 2,173 - 2,173 100.00%
Costs for provisions (466,288) (78,249) (388,039) (495.90%)
Other operating expenses (946,502) (1,213,161) 266,659 21.98%
Operating profit from the segment 637,915 1,038,317 (400,402) (38.56%)
Within the Group, operations in the Electricity segment are carried out by the following companies:
NEK EAD, ESO EAD, NPP Kozloduy EAD, TPP Maritsa East 2 EAD and the National Energy
Operator EAD. In compliance with the legal regulations, the companies are holders of licenses for
generation, sale, transmission and trade of electricity. They carry out their operations in compliance with
the requirements of the EU directives and regulations in the field of energy, the Energy Act and the
Ordinance on regulating the prices of electricity. The regulation of their operations is carried out by the
independent specialized authority – EWRC.
The main changes in the operating environment that have affected the activities of the companies in the
Electricity segment are as follows:
• Regulatory interventions in the free electricity market, mainly in the form of revenue caps
for electricity generators and compensation for non-household end customers;
• Decline in prices in European electricity markets, compared to peak prices at the end of 2021 and in
2022;
• Increased construction of installations for the production and consumption of electricity from the sun
in 2024, reaching a share of 29% of the total generation capacity in the country, resulting in a decrease
in production from conventional sources in 2024 compared to the previous year 2023;
• The share of electricity produced by RES in the electricity mix of the Republic of Bulgaria in 2024
reached 25% (2023: 20%). The growth in supply from this type of generators has affected the
competitiveness and volumes of electricity generated by other types of generators;
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
20
• In 2024, the country still has regulated and free markets operating in parallel, with domestic
consumption subject to regulation. An annual decision of the regulator, the EWRC, in the middle of the
calendar year determines the quantities of electricity and the prices at which the Public Supplier (NEK
EAD) buys and sells to meet the needs of end suppliers.
In 2024, the country's total gross electricity generation recorded a decline of 4.9% from the previous
year and amounted to 38,227,519MWh, compared to 40,177,891 MWh a year earlier. The reason for
the reported annual decline is mainly lower electricity demand in 2024 in the region. As a result, the
country's net trade exports contracted significantly compared to the previous year - by 70.7%, reaching
986,984 MWh in 2024 compared to 3,367,785 MWh in 2023.
In 2024, the gross electricity production of the generating companies within the BEH Group amounts to
22,124,462 MWh and shows a marginal growth of 0.93% compared to the reported production in 2023.
In 2024, Kozloduy NPP EAD produced 15,777,075 MWh of electricity, with the share of electricity
from the plant in the electricity energy system (EES) of the Republic of Bulgaria at a record high (after
2020) of 41.6%. NPP Kozloduy EAD delivered 15,031,942 MWh of net active electricity, realized in
accordance with the current regulations. The amount of electricity realized is 2.0% less compared to
2023 due to the reduced production. In accordance with the monthly quotas set by the EWRC, 35% of
the net generation (5,195,990 MWh) was provided by NPP Kozloduy to the Public Supplier at regulated
prices. Regulated market electricity deliveries from the plant are 27% higher than in 2023, which has
had an impact in reduced free market sales.
In addition to the regulated market electricity quantities, in 2024 the plant realised a total of 9,835,953
MWh on the organised exchange market and balancing market, as well as sales under Article 119 of the
EA and supply to own sites under Article 119(1) of the EA. The average selling price of electricity
produced by NPP Kozloduy in all directions in 2024 is BGN 135.99/MWh and is down 17% compared
to 2023. In 2024 NPP Kozloduy EAD maintains its good financial position despite the reported decrease
in sales compared to 2023. The company ended 2024 with a profit of BGN 221,913 thousand (2023:
BGN 537,052 thousand) and cash in the amount of BGN 549,318 thousand . (2023: BGN 912,588
thousand). The main influence on the reported lower financial result was the drop in the prices of the
electricity traded on the stock market, where in 2024 65% of the electricity produced by the company
was sold.
In 2024, TPP Maritsa East 2 EAD reported gross electricity generation of 4,486,222 MWh, which is
15.2% more than its level a year earlier (3,894,419 MWh). In 2024, 3,916,805 MWh of electricity were
sold (2023: 3,269,529 MWh), or an increase of 19.8% compared to the previous year as a result of higher
quantities sold on the regulated market
Pursuant to Order No.E-RD-16-295 of 01.06.2023 of the Minister of Energy and Decision No.C - 14 of
30.06.2023 of the EWRC, a production quota for TPP Maritsa East 2 EAD in the amount of 2,200,000
MWh was determined for the price period from 01.07.2023 to 30.06.2024. By Order No.E-RD-16-310
of 31.05.2024 the Minister of Energy assigned to TPP Maritsa East 2 EAD a total annual quota of
2,628,000 MWh for the next price period from 01.07.2024 to 30.06.2025. Subsequently, by Order No.E-
RD-16-2729, dated December 13, 2024, the quantities were increased to 3,155,000 MWh due to the
increased demands of the public electricity supplier in the second half of 2024. As a result, in 2024 TPP
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
21
Maritsa East 2 EAD will sell 3,233,218 MWh on the regulated market, or more than 3 times more than
in the previous year (2023: 773,754 MWh), with the quantities sold on the regulated market accounting
for 82.5% of the company's total sales.
In 2024, TPP Maritsa East 2 EAD sold 604,617 MWh on the market segments of IBEX EAD, with a
significant decrease of 74.1% compared to the quantities sold in 2023 (2,335,339 MWh). The decrease
is a result of the clear trend in 2024 of decreasing exchange prices for traded electricity in the country
and the region combined with relatively high prices for greenhouse gas emission allowances, which
severely limits the ability of TPP Maritsa East 2 EAD to realize its production at prices that cover full
costs and provide a normal rate of return for the plant.
For participation in load and frequency regulation of the power system in 2024, TPP Maritsa East 2
EAD reports electricity from participation in upward secondary regulation - 54,845 MWh and electricity
from participation in downward secondary regulation - 25,806 MWh.
The reported net financial result of TPP Maritsa East 2 EAD in 2024 is a loss in the amount of BGN
101,595 thousand, compared to a profit of BGN 57,611 thousand in the previous year 2023, or a decrease
of BGN 159,206 thousand. The main reason for the reported negative financial result in 2024 is due to
the lower revenue generated from core business, despite an increase in sales volume, following the
recorded decrease in prices on the regulated and free market.
With the owned hydroelectric plants and PSHPP, NEK EAD is the largest producer of energy from
renewable energy sources in the country, which actively participates in the regulated and free market
and in the control and regulation of the electricity system. The production of electricity from the
company's own hydropower plants and PSHPPs in 2024 was characteristic of a very dry year, with the
hydropower plants in the NEK EAD structure producing 1,861,165 MWh, or 1,301 MWh less (0.1%)
than the quantities in 2023 (1,862,466 MWh). The reported decrease in generation is due to lower
inflows and stored water volumes in the reservoirs in 2024.
During the period under review NEK EAD fulfilled its obligations in accordance with its licensing
activities and provided the required amount of electricity to the end suppliers. The company sold a total
of 15,096,485 MWh of electricity on the regulated and free market in 2024, up 6.0% from the previous
year (2023): 14,238,701 MWh). The reported annual increase in electricity sales in quantity terms is due
to an increase in quantities sold on both the regulated and free markets. As a public supplier,
characteristic for NEK EAD in 2024, the highest relative share (87.7%) in the structure of electricity
sold to the company are the quantities for the needs of the regulated market - 13,241,050 MWh.
NEK EAD reported a positive net financial result for 2024 in the amount of BGN 139,090 thousand, or
an increase of BGN 44,070 thousand compared to 2023, when the company's profit was BGN 95,020
thousand. The increase is mainly the result of an increase in revenues from electricity sold to End
Suppliers and to the platforms of IBEX EAD, as well as an improved structure of purchased electricity
and optimization of trading activities.
For the period January-December 2024, the amount of electricity sold in the country for which the
transmission operator ESO EAD is charged an access price for final customers and transmission is
32,791,026 MWh, up by 706,923 MWh or 2.2% compared to 2023 (32,084,103 MWh). For 2024, the
amount of electricity for which an access price is payable to generators, excluding renewable generators
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
22
with dynamically varying generation - from solar and wind - is 28,225,746 MWh, up by 3,177,438
MWh, or by 10. 1% less compared to the same period in 2023 (31,403,184 MWh), and the amount for
which an access price is payable for solar and wind producers is 6,521,637 MWh, which is 1,643,757
MWh (33.7%) more compared to 2023 (4,877,880MWh).
In 2024, ESO EAD reported a profit of 265,184 thousand BGN, an increase of 5.9% compared to the
result a year earlier (2023: BGN 250,451 thousand). The Company's improved financial result for 2024
is mainly due to higher access revenues for generators and end customers as a result of the higher
reported weighted average price for 2024, as well as growth in market administration revenues. Further
impacting the Company's improved financial position in 2024 was an increase in financing revenue as
a result of compensation received under the Updated Program for Compensation of Non-Household End
Customers of Electricity. The Company also reported lower purchased power costs for transmission
technology expense compared to 2023 due to the decrease in market prices for electricity traded on
IBEX EAD.
• Natural Gas Segment
Natural gas 2024 2023 Change 2024/2023
thousand
BGN
thousand
BGN
thousand
BGN (%)
Revenues from sales:
- external customers 2,341,614 3,323,046 (981,432) (29.53%)
- other segments 242,327 206,123 36,204 17.75%
Segment Revenue 2,583,941 3,529,169 (945,228) (26.78%)
Changes in production and WIP balances 15 2 13 650.00%
Costs of natural gas, electricity and other
assets sold (1,654,435) (2,521,641) 867,206 34.39%
Expenses for materials (7,633) (6,482) (1,151) (17.76%)
Hired services expenses (44,805) (43,290) (1,515) (3.50%)
Depreciation, amortisation and
impairment (305,660) (304,469) (1,191) (0.39%)
Personnel expenses (87,290) (82,688) (4,602) (5.57%)
Impairment of sales receivables, net (71,895) (44,551) (27,344) (61.38%)
Impairment of property, plant and
equipment, net 431 - 431 100.00%
Other operating expenses (126,074) (94,949) (31,125) (32.78%)
Costs for provisions (34,351) (1,230) (33,121) (2692.76%)
Technological costs of natural gas (140,208) (133,835) (6,373) (4.76%)
Operating profit from the segment 112,036 296,036 (184,000) (62.15%)
The operations of transmission, transit, storage and public supply of natural gas are carried out based on
licenses issued to Bulgartransgaz EAD and Bulgargaz EAD in compliance with the Energy Act and the
secondary legislation which follows the European legislation in the field and the regulatory requirements
of EWRC.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
23
In 2024, the amount of natural gas transported by Bulgartransgaz EAD to consumers in the country is
27,850,701 MWh (2023: 26,302,903 MWh), an increase of 1,547,798 MWh (5.9%) compared to 2023.
Traditionally, seasonality in natural gas transport has been maintained in 2024, with the highest volumes
transported in January at 3,082,961 MWh and the lowest volumes transported in July at 1,588,515 MWh.
The change in natural gas transported on a monthly basis shows the most significant increase in
transported natural gas in May, June and November of 2024 compared to 2023.
The deviation in the transmitted quantities of natural gas to the exit points in the country has a direct
correlation with the climate, taking into account temperature changes in the direction of increase, which
in particular affects the consumption of natural gas in the country. The largest decrease was in July by
10.9%, or 195,116 MWh, and the smallest in March - by 1.5%, or 40,498 MWh.
In 2024, the total amount of transited natural gas is 174,925,007 MWh (2023: 145,572,930 MWh), with
a significant increase of 29,352,077 MWh, or 20.2% compared to 2023. The reported changes to
neighboring countries are as follows:
• in the direction of Greece, an increase of 58.9%, or 13,884,027 MWh more compared to 2023 is
reported;
• in the direction of Serbia, an increase of 21.8% is reported, or 19,567,395 MWh more compared
to 2023;
• in the direction of North Macedonia, an increase of 4.9% is reported, or 194,334 MWh more
compared to 2023;
• in the direction of Romania, a decrease of 15.1% is reported, or 4,293,679 MWh less compared
to 2023.
In the direction of Serbia, the quantities transported have the largest share in the total transit of natural
gas in 2024 – 62.4%, followed by the direction of Greece with a share of 21.4%. The least transited
quantities are to North Macedonia – only 2.4% of the total transit.
No cross-border transmission of natural gas to the Republic of Turkey took place during the period
2022-2024, as the commissioning of the Turkish Stream gas pipeline, through which Turkey supplies
its own natural gas, started in early January 2020.
The activity “Natural gas storage” is carried out in the only underground gas storage facility on the
territory of the country - Chiren, owned by Bulgartransgaz EAD. The technological process related to
the natural gas storage service is seasonal (cyclic) and is expressed in the extraction and injection of gas
from/into the underground gas storage. The natural gas produced in 2024 is 4,987,277MWh and is
2,383,454 MWh (91.5%) more than the quantities in 2023 (2,603,823 MWh). The reported injected
natural gas in the Chiren UGS in 2024 is 4,457,001 MWh and is 1,830,677 MWh (69.7%) more than
the injected in the same period of 2023 (2,626,324 MWh).
In connection with the military operations in Ukraine in 2022, the Minister of Energy issued an order
imposing an additional obligation on Bulgartransgaz EAD to serve the public, in order to ensure the
security and continuity of natural gas supplies on the territory of the Republic of Bulgaria. The order
was issued in accordance with the European measures to ensure security, and Chiren UGS reached the
target of 90% occupancy. In 2024, the trend of maximum filling of the gas storage capacity is
maintained. As of 31.12.2024, the natural gas stored by customers in the Chiren UGS is 4,079,062 MWh,
compared to 4,780,893 MWh stored in 2023.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
24
Gas Hub Balkan (GHB) EAD was established as an operator of a natural gas trading platform in
accordance with the Bulgarian Energy Law. In 2024, GHB offered the following services for access to
its e-commerce platform: i) Short-term (spot) segment, which offers short-term standardized products
"within the day", "day ahead", as well as time and local products for the needs of balancing the network
of the transmission system operator. Trade is carried out anonymously, according to the provisions of
Regulation (EU) No.312/2014; ii) Long term segment which offers products traded on medium and
long-term basis - weekly, monthly, quarterly and yearly. (iii) A brokerage service that enables the
conclusion of contracts for the purchase of gas by end customers/end suppliers directly connected to the
gas transmission system of Bulgaria, without incurring costs for membership of the trading platform and
without the need to receive access to access and transmission services through the network of the
transmission system operator Bulgartransgaz EAD.
In 2024, the quantities of transactions in the short-term segment increased compared to the same period
of the previous year by 25.8%, or by 3,307,225 MWh, reaching 16,118,475 MWh. compared to the
12,811,250 MWh reported in 2023. The quantities of transactions in the long-term segment in 2024
reached 26,614,856 MWh, which is 20.1% less compared to the same period of the previous year (2023:
33,323,850 MWh)
At the end of 2024, there were 108 registered participants on the GHB, of which three are transmission
network operators and one mining company.
The activity of Bulgargaz EAD (public supply of natural gas) is regulated by the Energy Act and the
bylaws. With the amendment of Art. 30 par. 1 item 7 of the Energy Act (EE) promulgated in SG No.79
of 2019, the circle of persons to whom Bulgargaz EAD sells natural gas at a regulated price is
significantly narrowed. The change enters into force as of 01.01.2020, as Bulgargaz EAD in its capacity
of Public supplier sells natural gas at regulated prices only to: i) end suppliers of natural gas; ii) persons
to whom a license for the production and transmission of thermal energy has been issued. All other
customers directly connected to the gas transmission network are excluded from the regulated market.
After the changes in the legislation, Bulgargaz EAD conducts its activities as follows: i) on a regulated
market under contracts at the exit point of the gas transmission system of Bulgaria - at prices regulated
by EWRC; ii) on the free market under contracts with customers directly connected to the gas
transmission system - at freely agreed prices; iii) on an organized stock market - at freely agreed prices;
iv) others, outside the organized stock market (in the domestic and international markets) - at freely
negotiated prices; v) sale of services (SWAP operations and others) and extraordinary sales.
For 2024, the reported quantities of natural gas sold amount to 17,806,287 MWh, and compared to those
for 2023 (24,629,913 MWh), they decrease by 6,823,626 MWh, or by 27.7%.
In 2024, the following trends were reported:
• the main consumers of natural gas remained enterprises in the energy sector, as well as
distribution companies;
• A decline in sales was reported in all sectors, with the most significant decrease being reported
in the exchange sales (83%) and chemistry (-77%) sectors compared to 2023.
In 2024, the largest relative share in the structure of natural gas sales were those on the regulated market
– 12,858,251 MWh, or about 72.2% of total sales. In second place in relative share are sales at free
prices on the local and regional market (BTT) – 4,239,451 MWh or 23.8% of total quantities,
respectively. With the lowest share are sales on the free market (outside those on the BTT) – 708,585
MWh, or 4.0% of total sales.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
25
To ensure the natural gas needs of its customers, as of 31.12.2024, Bulgargaz EAD has delivered
17,659,487 MWh of natural gas (for 2023: 25,593,678 MWh). In 2024, the company purchased pipeline
natural gas in the amount of 10,273,658 MWh, liquified natural gas in the amount of 6,960,611 MWh,
purchased quantities at a virtual trading point in the amount of 242,980 MWh and purchased natural
gas under balancing contracts in the amount of 182,238 MWh.
The main supplies of natural gas, guaranteeing the consumption of the company's customers, are
provided through:
• concluded contracts for the supply of liquefied natural gas for 2024 as a result of tender
procedures for liquefied gas supply terminals in Turkey, Revitusa and Alexandroupolis;
• long-term contract concluded with Azerbaijan Gaz Supply Company (AGSC), which is fully
implemented from 01.10.2022 with the launch of the IGB interconnection;
• natural gas purchase and sale agreement with Botas, ensuring regasification and transmission
capacity through the Strandzha 1 - Malkoçlar interconnection point;
• Alexandroupolis terminal, which was put into commercial operation on 01.10.2024, through
which supplies of liquefied natural gas (LNG) were made to the Bulgarian market. The capacity
reserved by Bulgargaz EAD for the next 10 years is 10,600,000 MWh per year.
To ensure the security and continuity of natural gas supplies and to cover the seasonality for its
customers, Bulgargaz EAD uses the capacity of the underground gas storage facility at Chiren UGS,
owned by the combined operator Bulgartransgaz EAD. The operation of the gas storage facility is
cyclical, with the natural gas injection period being May-October and the extraction period being
November-April.
In accordance with the Emergency Action Plan for storing natural gas quantities, in order to compensate
for the seasonal unevenness of its customers, Bulgargaz EAD is obliged to inject, store and extract
natural gas quantities by participating in a public procedure of Bulgartransgaz EAD for the allocation
of storage capacity at the Chiren UGS. The extracted natural gas quantities by Bulgargaz EAD as of
31.12.2024 are 2,199,675 MWh, which is 1,598,123 MWh or 265.7% more than in 2023 (601,552
MWh).
The injected quantities of natural gas by Bulgargaz EAD as of 31.12.2024 are 1,556,523 MWh, which
is 679,552 MWh more than on 31.12.2023, when they were 876,971 MWh. The company has 2,570,234
MWh of gas available in the Chiren UGS as of 31.12.2024, which is a decrease of 643,152 MWh, or
20.0% compared to 2023 (3,213,386 MWh).
The development of the natural gas market in 2024 continued the trend of increasing the share of LNG
deliveries started in 2022 and 2023, in view of the reduced pipeline gas deliveries from Russia to Europe.
On 29 June 2022, Regulation (EU) 2022/1032 of the European Parliament amending Regulations (EU)
2017/1938 and (EC) No 715/2009 as regards gas storage to meet the storage targets in the European
Union entered into force. In this regard, Bulgargaz EAD, as well as other users of the gas storage facility
in Chiren, injected quantities of natural gas above the planned ones at significantly increased prices. In
order to achieve the externally imposed requirements for 80% filling of the storages, it was necessary to
maintain large stocks of natural gas at high prices. Subsequently, market conditions limited the
production of these quantities of natural gas. According to the Regulation, Member States shall take all
necessary measures, including the provision of financial incentives or compensations for market
participants, in order to achieve the filling targets set under the Regulation. In this regard, in 2024, the
Ministry of Energy developed a compensation mechanism under the "Program for Compensation of
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
26
High Prices of Natural Gas Injected into the Chiren UGS for the Period 01.05.2022 - 11.10.2022", for
quantities of natural gas produced in the months of January-April 2024. The compensation was paid by
the Electricity System Security Fund of Bulgargaz EAD, covering up to BGN 150 per MWh, for
quantities of natural gas of 1,045,167 MWh produced by the Chiren UGS for the period 21.11.2022.
until 21.04.2024 and delivered to end customers and/or end suppliers in the European Economic Area.
On 05.09.2024, Bulgargaz EAD received compensation from the Electricity System Security Fund in
the amount of BGN 156,775 thousand. The quantities of natural gas that Bulgargaz EAD failed to extract
from the Chiren UGS by 15 April 2024, were transferred as fulfillment of the obligation under the
Emergency Action Plan for the 2024-2025 gas year.
On the basis of an agreement signed on 30.1.2022 with BOTAŞ BORU HATLARI İLE PETROL
TAŞIMA A.Ş, Bulgargaz EAD secures access to the regasification terminals of liquefied natural gas in
Turkey and its subsequent transfer to the territory of the Republic of Bulgaria, with provided flexibility
of supplies. The period of the Agreement between Bulgargaz EAD and BOTAŞ is 01.01.2023 -
31.12.2035. With Decision No.26 as of 12.01.2023 the Council of Ministers of the Republic of Bulgaria
approves the signed Agreement. The agreement provides capacity for regasification of up to 14 cargoes
(14,000,000 MWh) of liquefied natural gas per year and its subsequent transmission to the
interconnection point on the border of the Republic of Turkey and the Republic of Bulgaria –
Malkoçlar/Strandzha 1, in the amount of up to 19,000,000 MWh per year. The difference in the
quantities between the possibility of delivery of liquefied natural gas and its subsequent transmission is
intended to provide flexibility in obtaining the quantities of delivered liquefied natural gas (estimated as
28% of the total volume). It is management's judgment that during the summer, when demand is lower,
the quantities may not be taken in full, with the greater transfer capacity allowing these not taken
quantities to be taken up during the winter period, when demand is significantly higher. In addition to
this, the flexibility enjoyed by the Company when requesting and receiving quantities saves significant
financial losses from selling natural gas quantities below cost on the exchange and/or as a positive
imbalance to the operator of the gas transmission network, not only in the event of interruption as a
result of repair activities, but also in case of non-payment by the company's customers.
Also, the agreed price for the service provided under the Agreement is fixed for the entire period of the
agreement (with annual inflation indexation, starting from 01.01.2025), which eliminates the risk for the
Company of paying higher prices in the event of high demand for reserving storage and regasification
slots.
The term of the Agreement allows for the conclusion of a long-term contract (over 10 years) for the
supply of liquefied natural gas. In long-term contracts for liquefied natural gas, the prices of the goods
are not tied to the market, as is the case with short-term supplies, but are intended to cover the investment
in the development of a respective gas field and/or a terminal for loading liquefied natural gas.
The conclusion of the Agreement provided a third source of supply for the company, which in turn, in
addition to the above-mentioned advantages, brings security and independence in supplies to Bulgarian
consumers, since in this way Bulgargaz EAD has diversified the routes and sources of supplies,
providing three interchangeable sources of supply.
The management of Bulgargaz EAD believes that according to the currently available information, on
the basis of which forecasts for its future development have been made, as well as due to the continued
financial and operational support from the sole owner of the capital, the Company will continue to
function as a going concern and will settle its obligations according to the maturities and agreed terms.
Given the importance and strategic significance of the activities performed by Bulgargaz EAD,
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
27
Bulgarian Energy Holding EAD, as the parent company, has neither the intention nor is there a legal
need to cease the company's activities, regardless of its financial indicators as of 31 December 2024.
The sole owner of the capital is committed to continuing operational and financial support of Bulgargaz
EAD.
The Company's management has made its assessment of the events, facts and circumstances and, as a
result of the analysis performed, has concluded that the going concern principle has been adequately
applied in preparing the annual financial statements as of 31 December 2024.
• Coal Segment
Coal 2024 2023 Change 2024/2023
thousand
BGN
thousand
BGN
thousand
BGN (%)
Revenues from sales:
- external customers 227,996 319,610 (91,614) (28.66%)
- other segments 153,277 133,290 19,987 15.00%
Segment Revenue 381,273 452,900 (71,627) (15.82%)
Change in finished goods and work in
progress 38,236 55,313 (17,077) (30.87%)
Costs for acquisition of property, plant
and equipment 9,637 11,568 (1,931) (16.69%)
Costs of natural gas, electricity and other
assets sold (9,176) (14,648) 5,472 37.26%
Expenses for materials (96,051) (161,034) 64,983 40.35%
Hired services expenses (32,590) (37,600) 5,010 13.32%
Depreciation, amortisation and
impairment (86,597) (81,278) (5,319) (6.54%)
Personnel expenses (386,055) (356,186) (29,869) (8.39%)
Impairment of sales receivables, net (132) 5,301 (5,433) (102.49%)
Impairment of property, plant and
equipment, net (19,572) - (19,572) (100.00%)
Other operating expenses (6,166) (19,622) 13,456 68.58%
Provision expenses (70,575) 15,136 (85,711) (566.27%)
Operating profit\ (loss) for the
segment (277,768) (130,150) (147,618) (113.42%)
The lignite coal extracted by Mini Maritsa-Iztok EAD is intended for the supply of the thermal power
plants in the Maritsa East complex (TPP Maritsa East 2 EAD, ContourGlobal Maritsa East 3 AD, AES
Maritsa – 3C Maritsa East 1 EOOD and Brikel EAD), with which the subsidiary is linked in terms of
technology and market.
One of the priorities in the activity of Mini Maritsa-Iztok EAD is the implementation of the planned
overburden activities aimed at stabilization of the mining horizons and the increase of the land resistance
coefficient. Therefore, the production levels are consistent on one hand with the extraction opportunities
provided by the land, and on the other hand with the needs of the plants that the company supplies. The
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
28
coal mined and sold in 2024 amounted to 13,745 thousand tons, 5,720 thousand tons (29.39%) less than
the quantity in 2023 (19,465 thousand tons), due to the reported decline in demand from all thermal
power plants of the Maritsa East complex. The most significant decrease in lignite coal consumption
was reported at ContourGlobal Maritsa East 3 AD, respectively from 6,466 thousand tons in 2023 to
838 thousand tons in 2024, due to the expiration of the lignite coal supply agreement on 21.02.2024.
On 30.04.2024, the agreement to the coal export purchase and sale agreement between Mini Maritsa
Iztok EAD and Virom Group OOD Belgrade, Serbia expired, under which no sales were made in 2024,
and 1,063 thousand tons of lignite coal were sold in 2023.
The sales prices of the quantities of lignite coal sold by the company to counterparties throughout the
country during the reporting period were formed at a price of 87.35 BGN/TUG, maintaining the same
price levels from 2023.
• Administrative Activity Segment
Administration activity 2024 2023 Change 2024/2023
thousand
BGN
thousand
BGN
thousand
BGN (%)
Revenues from sales:
- external customers 4,590 3,760 830 22.07%
- other segments 625,342 857,245 (231,903) (27.05%)
Segment Revenue 629,932 861,005 (231,073) (26.84%)
Expenses for materials (237) (301) 64 21.26%
Hired services expenses (7,826) (4,326) (3,500) (80.91%)
Depreciation, amortisation and
impairment (1,490) (1,317) (173) (13.1%)
Personnel expenses (12,450) (10,845) (1,605) (14.80%)
Impairment of sales receivables, net (62,677) 119,670 (182,347) (152.37%)
Impairment of property, plant and
equipment, net (13) - (13) (100.00%)
Other operating expenses (1,315) (1,099) (216) (19.65%)
Costs for provisions - (615) 615 100.00%
Operating profit from the segment 543,924 962,172 (418,248) (43.47%)
Administrative activities are mainly carried out by the parent company BEH EAD, as this segment also
includes the activities of the newly joined company in BEH Group Minproekt EAD. The financial
situation of its subsidiaries is the primary factor that directly affects the revenue amount of BEH EAD.
This is because the dividend received by BEH EAD from its subsidiaries is determined based on the net
financial result reported by the subsidiaries from their operations. In 2024, the reported dividend and
participation income (including income from interest on arrears) amounts to BGN 632,297 thousand
compared to BGN 855,113 thousand of dividend and participation income received in 2023. The most
significant part of them is the dividend income from Bulgartransgaz EAD in the amount of BGN 257,251
thousand, followed by dividend income from NPP Kozloduy EAD and ESO EAD in the amount of BGN
241,673 thousand and BGN 123,503 thousand, respectively. The reported dividend income in 2024 is
lower on an annual basis, since in accordance with item 4 of Order No.1 of the Council of Ministers of
27 March 2024, NEK EAD does not distribute or pay a dividend in favor of BEH EAD in 2024 for the
company's profit for 2023. In comparison, in 2023 the reported dividend from NEK EAD was in the
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
29
amount of BGN 449,314 thousand.
In 2024, the dividend distribution rate from state-owned commercial companies was maintained in
accordance with Order No.1 of the Council of Ministers of 27 March 2024 on the establishment and
payment to the State of deductions from the profits of state-owned enterprises and state-owned
commercial companies, dividend deductions were set at 50% of the net profits of the companies, after
deduction of uncovered losses from previous years and deductions for the Reserve Fund.
At the level of profit before taxes, the result reported by BEH EAD in 2024 is BGN 673,878 thousand
and is BGN 431,894 thousand lower than the reported profit before taxes in 2023 in the amount of BGN
1,105,772 thousand. This result is influenced by the reported net financial income in 2024 of BGN
119,332 thousand. (compared to net financial income of BGN 143,403 thousand in 2023). A significant
part of the company’s financial income came from interest on loans granted to its subsidiaries. In 2024,
the company's reported financial expenses amount to BGN 73,623 thousand. (BGN 74,617 thousand in
2023) and mainly reflect accrued interest on BEH EAD's outstanding bond issues.
3.2. Information on the main intangible resources
The main intangible resources of BEH Group are related to the licenses held by the subsidiaries in the
field of production and trade of electricity and heat and transmission and trade of natural gas. The
licenses are described in detail in Section 1. "General information" of the consolidated activity report
for each company separately.
3.3. Ratios
• Profitability of revenue - net profit/operating income
2024
reported
2023
reported
% of change
2024/2023
0.028 0.096 (70.83%)
This indicator summarizes the overall efficiency of the operations of BEH-group.
• Return on Equity (ROE)
2024
reported
2023
reported
% of change
2024/2023
0.012 0.061 (80.33%)
The ratio indicates the efficiency of turning the equity into profit.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
30
• Return on Assets (ROA)
2024
reported
2023
reported
% of change
2024/2023
0.008 0.040 (80.00%)
The ratio provides information about the efficiency in turning the assets into profit.
3.4. Compliance with the covenants according to the terms and conditions of the bond issues
of BEH EAD
The values of the covenants that BEH EAD is obliged to observe on a consolidated basis according to
the terms of the bond issues placed are as follows:
Covenants as of 31.12.2024 as of 31.12.2023
EBITDA Coverage ratio > 4.0 8.44 12.18
Debt Coverage ratio < 4.5 (0.18) (0.15)
3.5. Commitments, contingent liabilities and other significant events
Litigation and claims arise during the normal course of business of the Company. The Company's
management is of the opinion that the costs necessary to resolve these disputes and claims will not have
a material effect on the financial status and cash flows in future financial periods.
Bulgarian Energy Holding EAD
Proceedings by the European Commission against Bulgarian Energy Holding EAD
Case COMP/B1/АТ.39849 – BEH gas
The case concerns a possible violation of Article 102 TFEU in relation to alleged actions by BEH EAD
and its subsidiaries Bulgargaz EAD and Bulgartransgaz EAD aimed at:
• preventing their competitors from gaining access to key gas infrastructure (gas transmission
network and natural gas storage facility) in Bulgaria, explicitly or implicitly denying access to
third parties or causing delays;
• preventing competitors from receiving access to a main gas import transmission network by
reserving a capacity, which remains unused.
The proceedings were instituted in 2013 with a view to adopting a decision under Chapter 3 (Articles 7
to 10) of Regulation 1/2003.
On 23 March 2015, the EC issued a Statement of Objections. Bulgarian Energy Holding EAD and its
gas subsidiaries submitted their respective responses to the European Commission on 9 July 2015
(Bulgargaz EAD), 10 July 2015 (Bulgarian Energy Holding EAD) and 17 July 2015 (Bulgartransgaz
EAD).
On 24 November 2017, the 44th National Assembly (NA) of the Republic of Bulgaria adopted a decision
to take the necessary action to bring Case COMP/B1/AT.39849 - BEH Gas to a close, whereby the NA
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
31
supports the closure of the case under Article 7 of Regulation (EC) No 1/2003 without admitting the
alleged infringements and without accepting liability for them, by fulfilling the obligations arising from
a possible prohibition order, including a possible financial penalty. Currently, the European Commission
has not made any official decision to close the case, including regarding the possible amount of the
financial sanction.
On 26 July 2018, the 44th National Assembly (NA) of the Republic of Bulgaria adopted a decision to
take action to close Case COMP/B1/AT.39849 - BEH Gas pursuant to Article 9 of Regulation (EC) No
1/2003 by entering into commitments on the Bulgarian side and reaching an agreement with the
European Commission. The second decision of the National Assembly is justified by the development
of case COMP/B1/AT.39816 between the EC and Gazprom, where on 24 May 2018 the Commission
announced that an agreement had been reached and it was terminated pursuant to Art. 9 of Regulation
(EC) No.1/2003 without a financial penalty.
On 17 December 2018, the European Commission notified the adoption of Decision C(2018)8806 under
Case AT.39849 BEH-Gas, whereby the European Commission imposed a fine on Bulgarian Energy
Holding EAD (BEH), its subsidiary for gas supply – Bulgargaz EAD – and its subsidiary –
Bulgartransgaz EAD (BEH Group) – in the amount of EUR 77,068,000 for preventing competitors from
accessing key gas infrastructure in Bulgaria in breach of EU antitrust rules. The decision was received
in the offices of the three companies on 19 December 2018, which set the start of the appeal period of
the EC Decision (two months and ten days after notification of the Decision to the parties), and for
payment of the fine (three months after the notification of the Decision to the parties) set therein.
Appealing the decision does not delay payment of the fine.
On 18 March 2019, ING Bank NV issued two unsecured bank guarantees in favor of the EU with a total
amount equal to the amount of the fine of EUR 77,068,000, as follows:
- a bank guarantee in the amount of EUR 51,379 thousand, covering 2/3 of the total amount of
the fine, securing the obligations of Bulgarian Energy Holding EAD and Bulgargaz EAD;
- bank guarantee in the amount of EUR 25,689 thousand, which guarantees the liability of
Bulgartransgaz EAD for the imposed sanction.
On 4 July 2019, the Bulgarian State, through the Ministry of Foreign Affairs, filed an application to
intervene in the case in support of BEH EAD and its gas subsidiaries.
On 26 August 2019, the European Commission presented before the General Court its Defense in
response to the complaint lodged by Bulgarian Energy Holding EAD, Bulgargaz EAD and
Bulgartransgaz EAD.
On 29 November 2019, Bulgarian Energy Holding EAD, Bulgargaz EAD and Bulgartransgaz EAD filed
an Opposition against the European Commission Defense.
On 20 February 2020, the Republic of Bulgaria filed through the Ministry of Foreign Affairs, within the
period specified by the General Court of the European Union, the official position of the Republic of
Bulgaria on Case Т-136/19, submitted by the Ministry of Energy and the Ministry Foreign Affairs,
whereby the State intervened in support of Bulgarian Energy Holding EAD, Bulgargaz EAD and
Bulgartransgaz EAD against the European Commission, before the General Court of the European
Union. The General Court examines additional documents and requested information in order to clarify
all the circumstances involved in the case. By letter of 14 March 2022, the Court requested the European
Commission to provide non-confidential versions of the documents listed by the Court.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
32
On 29 September 2022, the court session ended with oral hearings under the BEH Gas case, within
which the parties summarized their positions and the court asked questions that were addressed by the
parties.
On 25 October 2023, the court of first instance rendered a Decision in favor of Bulgarian Energy
Holding EAD, Bulgartransgaz EAD and Bulgargaz EAD, with which it completely annulled the fine
imposed by the European Commission on the three BEH-group companies in the amount of
EUR 77,068,000.
On 11 January 2024, the European Commission filed an appeal against the decision of the court of first
instance, requesting the annulment of the Decision of the General Court in its entirety. Based on the
appeal, case C-14/24 R was initiated before the Court of Justice of the European Union – European
Commission against BEH and others.
BEH Group filed a response to the complaint of the European Commission to the Court of Justice of the
European Union On 29 March 2024.
On 22 July 2024, the European Commission submitted a counter-answer to the Court of Justice of the
European Union.
On September 30, 2024, BEH Group provided a response.
On 25 October 2023, the General Court of the European Union annulled in full the Decision of the
European Commission in Case AT.39849 – BEH Gas, by which the Commission sanctioned, with a fine
of EUR 77,068,000, BEH EAD, Bulgargaz EAD and Bulgartransgaz EAD for abuse of a dominant
position, preventing access to the Bulgarian gas infrastructure in the period from 30 July 2010 to 1
January 2015.
The Bulgarian state is also an interested party in the case. On 11 January 2024, the European
Commission filed an appeal against the decision of the court of first instance. To date, replies have been
filed by BEH EAD, Bulgartransgaz EAD and Bulgargas EAD and the State against the European
Commission's appeal in Case C-14/24 before the Court of Justice of the European Union.
The Bulgarian side has also submitted a justification for the Court to allow oral hearings as at first
instance. Oral hearings in the case are expected in the second quarter of 2025.
4. Risk factors
The Group's risk management policies identify and analyse the risks affecting the Group, set risk limits
for individual types of risks, define rules for risk control and compliance with the established limits.
Risk management policies and systems are subject to regular review in order to identify the changes
occurred in the market and activities. By trainings and application of the established standards and
procedures, the Group aims to develop discipline and constructive control environment where all
employees understand their role and obligations. The main types of risks to which the Group is exposed
in the course of its business are as follows:
4.1. Interest rate risk
Interest rate risk is the risk of adverse change in interest rates leading to an increase in interest expenses
and/or a decrease in the company's interest income.
The Group is exposed to the risk of changes in market interest rates mainly in relation to the financial
assets and liabilities with a variable (floating) interest rate, as well as in relation to defined staff benefit
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
33
plans, calculated on the basis of a discount factor which is determined at the basis of the market yield of
government securities.
The interest-bearing assets in the structure of the Group's assets are represented by cash, bank deposits
and loans, the majority of which have a fixed interest rate. The Group also has loans granted with a
combined structure of the borrowing rates, which contains two components – fixed and variable. The
borrowings of the Group are in the form of long-term and short-term loans and predominantly have a
fixed interest rate. This minimizes the likelihood of a change in the unfavorable direction of cash flows.
4.2. Currency risk
The Group carries out purchases, sales, lending and borrowing operations in foreign currencies – Euro,
US Dollars, Japanese Yen, British Pounds, Swiss Francs and Macedonian Denars. The main part of
these operations is carried out in EUR and USD.
As the BGN/EUR exchange rate is fixed at 1.95583, the currency risk arising from the Group’s euro
exposures is minimal.
The Group makes payments for construction and installation works, deliveries for assets under
construction and goods in US Dollars. In this regard, there is a risk of changes in exchange rates.
Consequently, the Group is exposed to the risk of changes in the exchange rate of the US dollar. In the
event of material fluctuations in the future, the Group may hedge its exposure through derivative
instruments such as foreign currency swaps.
4.3. Liquidity risk
Liquidity risk arises if the Group fails to meet its obligations when they become due. The group carries
out ongoing monitoring and control of cash outflows and applies an approach that ensures the necessary
liquidity resource to meet the obligations incurred under normal or stressful conditions without realizing
unacceptable losses.
One of the objectives of the parent company is to provide, if necessary, financial resources to its
subsidiaries in order to maintain their operations and to implement certain strategic projects.
The parent company finances the operating activities of the companies in the Group in two ways:
• Internal financing - within the economic group, by redistribution of the free cash resource.
Bulgarian Energy Holding EAD acts as an intermediary between the companies in the corporate
structure, coordinating the conditions between them and monitoring for the execution of
transactions at market levels. The interest rates on cash loans and foreign currency deposits are tied
to a rate that is the market rate for such transactions during the transaction period (floating or fixed).
• External financing – in case of shortage of funds in the economic group, Bulgarian Energy Holding
EAD may take actions for external financing. This is a preferred way to raise funds for investment
projects. The holding has successfully implemented 4 (four) bond issues since 2013. The funds
raised were used to implement investment projects, repay and refinance loans, as well as for general
corporate purposes, with the exception of coal-related activities.
4.4. Market risk
The manifestation of risk is expressed in changes in market conditions regarding prices, exchange rates,
interest rates or equity instruments and their impact on the Group's income from the investments made.
The purpose of market risk management is to exercise control over the exposure to market risk within
acceptable parameters by optimizing returns.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
34
The Group undertakes periodic analyses of the macroeconomic environment in the country and in-depth
analysis of specific macro-indicators, including information on interest rates, which are submitted to the
Board of Directors. The Board is responsible for assessing the future risks faced by the Group. In the
event of deteriorating market conditions, hedging instruments may be used.
4.5. Credit risk
In the course of its activities, the Group is exposed to credit risk, which is associated with the risk for
some of the counterparties not to be able to fulfill their obligations in full and within the usual deadlines.
IIn this regard, the credit quality of customers is assessed, taking into account financial condition, past
experience and other factors. Regular monitoring of the assessment results is carried out, on the basis of
which, if necessary, impairment is calculated, in accordance with applicable international accounting
standards.
The Group's receivables are presented in the consolidated statement of financial position in net amount
in net amount, after deducting the accrued impairment for the expected credit loss.
In relation to the credit risk of uncollectibility of receivables from counterparties, the Group takes the
following precautionary measures:
• for trade and other receivables that are overdue and were not secured upon their origination,
deferred payment arrangements are concluded and a collateral of not less than the initially
recognized amount of the claim is negotiated;
• for other contracts that are not secured, the following usual measures are taken in advance in
case of overdue payment by the debtor company – offsetting liabilities to the Group against
overdue receivables of the debtor, and if the amount of the liabilities is not big enough to cover
the receivables, then other out-of-court options for settling the claims are sought.
The Group is currently monitoring and analysing the servicing of the receivables, the reasons for the
defaults and the changes in the financial capacity of the debtor companies and the status and quality of
the collaterals received.
The group has a significant concentration of credit risk in respect of receivables from Toplofikatsia Sofia
EAD.
Credit risk arising from other financial assets of the Group, such as cash and other financial assets, is
the credit exposure of the Group arising from the likelihood that its contractors may fail to meet their
obligations.
The Group's maximum credit exposure in respect of financial assets amounts to their respective carrying
amount in the consolidated statement of financial position as of 31 December 2024.
4.6. Regulatory risk
Regulatory risk is determined by the specifics of the business activity. Pursuant to Art. 21, paragraph 1,
item 8a, item 8b, item 8c, 8d, 8g, 8h, 8i, Art. 30, para. 1 and Art. 33a of the Energy Act, the following
prices are subject to regulation by the EWRC:
o determines for each price period a limit value of the costs of the electricity transmission network
operator for the purchase of availability for additional services in accordance with Art. 105, para. 2;
o determines annually by June 30 premiums for electricity from renewable sources and from high-
efficiency combined production of electricity and heat, generated by power plants with a total
installed electrical capacity of 500 kW and over 500 kW
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
35
o determines monthly compensation to cover part of the costs of household end customers for
purchased electricity from an end supplier at regulated prices;
o for the purposes of pricing, determines annually by June 30 an estimated market price of
electricity to cover the technological costs of the transmission system operator and the distribution
system operators;
o monitors market developments, assesses the risks that may arise from new products and services,
and takes measures against abuse;
o exercises control over the possibility for transmission system operators to impose limitations on
the capacity provided or operational restrictions, based on transparent and non-discriminatory
procedures that do not create barriers to market entry;
o may authorise the transmission system operator and distribution system operators to carry out
activities other than those provided for in this Act and in Regulation (EU) 2019/943 of the
European Parliament and of the Council of 5 June 2019 on the internal market in electricity (OJ
L 158/54 of 14 June 2019), hereinafter referred to as Regulation (EU) 2019/943, if such activities
are necessary for the performance of their obligations under this Act or Regulation (EU)
2019/943;
o at which the producers sell thermal energy to the heat transmission company and to directly
connected customers;
o at which the heat transmission company sells thermal energy to customers;
o at which the public supplier sells natural gas to the end suppliers of natural gas and to a person who has
been issued a license for production and transmission of heat energy; the prices are approved on monthly
basis and are applied from the first day of the month for which they are approved;
o at which end suppliers sell natural gas to customers connected to the respective gas distribution
networks;
o for access and/or transmission through the transmission grid;
o to connection to the grids;
o for access and transmission of natural gas through transmission and/or distribution networks,
except in the cases where the Commission at its discretion approves a methodology for setting a
price for access and transmission through the transmission grid;
o for access and/or transmission through the electricity distribution grids;
o for access and storage of natural gas in a storage facility;
o for distribution of traction electricity on the distribution grids of the railway transport;
o For the provision of services to customers, as determined by the Commission, related to the
licensing activity;
o including the price or the price component at which all end customers connected to the electricity
system, including the electricity transmission system operator and the electricity distribution
network operators, shall contribute for compensation of the costs under Art. 34 and Art. 35.
o The Commission sets premiums for power plants with a total installed electrical capacity of 500
kW and over 500 kW for the electricity produced from highly efficient combined heat and
electrical energy production;
o The premiums are determined annually by June 30 as the difference between the preferential
prices of producers and the estimated market price determined for this period for electricity
produced in a highly efficient combined cycle manner.
Price regulation has a significant impact on revenues, expenses, and hence on the overall economic and
financial condition of the Group.
4.7. Cash flow risk
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
36
The cash flow risk depends on fluctuations in the amount of future cash flows associated with a
possessed financial instrument. The Group plans its cash flows and floating rate financial instruments
are of a short-term nature of less than 1 year.
Detailed information regarding the Group's financial risk management objectives and policy and the
main categories of financial assets and liabilities, is included in the consolidated financial statements of
BEH EAD for 2024.
5. Future development, investments, forthcoming significant transactions and other information
under Art. 247 of the Commercial Act
5.1. Future development of Bulgarian Energy Holding EAD
The objectives of BEH EAD are focused on the following main and priority areas:
Financial sustainability of BEH Group
• Improving corporate management practices
- Increasing the transparency and sustainability of BEH Group in accordance with OECD
principles and the Guidelines for Corporate Governance of State-Owned Enterprises.
• Providing funding for key activities and projects:
- Effective management of financial assets and instruments;
- Participation in the capital markets in order to attract external financing from international
financial institutions under competitive terms;
- Using the advantages that result from the scale of the holding structure (economy of scale);
- Support to independent transmission operators in the process of negotiating the necessary
credit resources to finance projects of particular importance to companies, in the context of
climate change mitigation and sustainable development of the low-carbon economy
• Cost optimization in BEH Group:
- Forecasting and planning the expenses of BEH Group;
- Transparency and predictability of expenses;
- Increasing the efficiency of the business activities.
• Elimination of deficits in BEH Group:
- Ongoing monitoring and control over the amount of the generated tariff deficit;
- Cooperation and support to the Ministry of Energy, EWRC and the Energy Commission in
the development of normative and regulatory changes related to the reformation of the sector
and the compensation of the generated tariff deficits in the system.
Ensuring the security of the energy system in the country
• Diversification of the sources and routes for supply of natural gas in the country through
projects for:
- Increasing the capacity for natural gas transmission from Greece to Bulgaria and from
Bulgaria to Romania (Vertical Gas Corridor);
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
37
- Increasing the capacity for transmission of the Greece-Bulgaria gas interconnector to 5
billion cubic meters per year by conducting annual capacity auctions with neighboring
operators in case of interest in additional quantities;
- Shareholding in the liquefied natural gas terminal (LNG terminal) near Alexandroupolis,
Greece
- Research of the possibilities and expediency of possible participation in other new
investment intentions to build terminals for liquefied natural gas in the region;
- Participation in tenders for reserving capacities at terminals of liquefied natural gas in Turkey
and Greece;
• Security, reliability and continuity of gas supplies
- Expansion of the capacity of Chiren UGS and its transformation into a commercial storage
facility.
• Construction of new capacities, extending the life of existing facilities, guaranteeing the
security of the electricity system, combined with ensuring long-term profitability:
- Ensuring the long-term operation of the 5th and 6th nuclear power units above their design
until 2047 and 2051 respectively and the implementation of measures ensuring the operation
of the units at increased power;
- Diversification of supplies of fresh nuclear fuel while complying with nuclear safety
conditions and requirements;
- Taking actions for construction of the 7th and 8th units at site No.2 of the NPP Kozloduy
EAD with the AP1000 technology.
- Rehabilitation of hydropower capacities, expansion of the production capacity and
modernization of the capacities with the purpose of ensuring the long-term and effective
exploitation of the hydropower resources of our country;
- Construction of new PSHPP on existing dams (Batak and Dospat).
• Decarbonization:
- Ensuring a fair and smooth transition to a low-carbon energy sector;
- Generation and transmission of electricity with a low or zero carbon footprint through
projects to build new capacities and infrastructure.
- Integration of decarbonization goals with the strategic direction and development framework
of the energy sector in Bulgaria;
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
38
• Development of transmission infrastructure and digitization of the activity management
systems:
- Comprehensive modernization of the planning, management and maintenance activities of
the electricity transmission network in the country through the introduction of state-of-the-
art digital tools and methods to ensure the necessary maneuverability and security in the
conditions of low-carbon production;
- Increasing the transmission capacity of the electric power system and construction of new
infrastructure for the rapid implementation of RES capacities.
• Liberalization of the gas market:
- Development of a competitive and integrated natural gas market and strengthening the
position of the Republic of Bulgaria as a regional gas trader.
5.2. Expected investments
Gas interconnector Greece-Bulgaria
The Greece-Bulgaria Gas Interconnector project (IGB project) was implemented in pursuance of the
policy of the Republic Bulgaria, aimed at increasing the security of natural gas supplies by providing
infrastructure for access to alternative sources and routes for supply of natural gas and ensuring the
country's physical connectivity with the Southern Gas Corridor. With the project, put into operation on
1 October 2022, the construction of a gas pipeline with a capacity of 3 billion cubic meters per year from
Komotini to Stara Zagora, with a length of 182 km, 151 km of which on Bulgarian territory, was carried
out.
With the commissioning of the IGB gas pipeline, Bulgaria and Greece are now able to respond
effectively to supply disruptions from external sources or seasonal peaks in the consumption of natural
gas. This is infrastructure that ensures transit transmission, and also ensures crisis supplies and covers
peak usage in the months of increased consumption.
Currently, the gas pipeline operates with a transmission capacity of 3 billion m3 per year, which, with
additional investment, can reach 5 billion m3 per year depending on the market interest.
Expansion of the capacity of Chiren underground gas storage
The only underground gas storage facility in the country Chiren is owned by Bulgartransgaz EAD. The
project for expansion of the capacity of Chiren UGS consists of step-by-step increasе of the capacity of
the only gas storage facility on the territory of Bulgaria with the purpose of achieving larger volumes of
stored gas, increased pressures in the gas tank and higher average withdrawal and injection capacity.
The project envisages an increase in the volume of working gas to 1 billion m3 and an increase in the
withdrawal and injection capacity to 8 - 10 million m3/day.
Grant funding of nearly 78 million euros has been allocated from the Connecting Europe Facility (CEF)
for the implementation of the project. In order to support the Chiren UGS expansion project, a State
guarantee in the amount of BGN 208 million for Bulgartransgaz EAD was included in the State Budget
Act for 2025.
On 22 June 2022, a grant agreement was signed with the European Executive Agency for Climate,
Infrastructure and Environment (CINEA) for the co-financing of the expansion of the Chiren UGS with
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
39
the following identification number and name: Project 101069718 — 6.20.2-BG-WM-21-Extension of
the Chiren UGS. The total value of the costs, according to the decision of the EC to approve the
financing, is in the amount of EUR 155,820 thousand. The amount of the grant is 50% of the value of
the grant agreement - up to EUR 77,910 thousand. As of the date of preparation of the financial
statement, an advance payment of EUR 38,955 thousand, or 50% of the value of the financing, has been
received. In June 2024, an interim payment of EUR 271 thousand was received under the agreement. In
March 2025, Amendment No.1 to the grant agreement was signed, according to which the project
implementation period was extended until 07.12.2027.
Acquisition of a share of the rights and obligations under the Oil and Gas Exploration Contracts in
the area of Block 1-21 Han Asparuh
By Decision of the National Assembly of the Republic of Bulgaria of 21.07.2023 (prom. SG
No.63/2023) the Minister of Energy was instructed to negotiate the terms and conditions for BEH EAD
to acquire up to 20% of the rights and obligations under the Oil and Gas Exploration Contracts in the
area of Block 1-21 Han Asparuh.
The Decision under item 21 of Protocol No.25 of the meeting of the Council of Ministers on 5 June
2024 authorizes TotalEnergy EP Bulgaria B.V. to transfer its share of 57.14 percent of the rights and
obligations arising from the permit to OMV Offshore Bulgaria GMBH. The same decision extends the
term of the permit for oil and gas exploration in the area by 23 months as a result of a delay caused by
a force majeure event (the decision of TotalEnergies EP Bulgaria B.V. to withdraw from the permit and
the contract, as well as the continuation of the military actions of Russia against Ukraine, and the
consequences of the same on the security of the Black Sea while carrying out the operations), certified
by Force Majeure Certificate No.007/09.02.2024, issued by the Bulgarian Chamber of Commerce and
Industry.
Pursuant to Decision No.394/07.06.2024 of the Council of Ministers, Supplementary Agreement No.10
to the Exploration Contract was signed, whereby TotalEnergies EP Bulgaria B.V. transferred its 57.14%
interest in the rights and obligations under the permit to OMV Offshore Bulgaria GMBH, with the
company now holding a 100% interest in the project.
By Decision No.83 of 20 February 2025 of the Council of Ministers (prom. SG No.16/2025) OMV
Offshore Bulgaria GMBH was allowed to transfer 50 percent of the rights and obligations arising from
Decision No 649 of the Council of Ministers of 2012. For the grant of the oil and gas exploration permit
- underground resources, in the area of Block 1-21 Han Asparuh, located in the exclusive economic zone
of the Republic of Bulgaria in the Black Sea, to NewMed Energy Balkan Limited, operating through its
branch NewMed Energy Balkan Limited - Branch Bulgaria foreign trader branch (FTB).
Pursuant to an item in the above decision, on 12 March 2025, the Minster of Energy entered into a
supplemental agreement with the parties for a partial assignment of the rights and obligations under the
oil and gas exploration contract. The oil and gas exploration in Block 1-21 Han Asparuh has thus been
continued, with the two companies (OMV Offshore Bulgaria GMBH and NewMed Energy Balkan
Limited - Bulgaria Branch FTB) now each holding a 50 percent stake in the project, with OMV Petrom
(through OMV Offshore Bulgaria GMBH) as its operator. The block is located in the exclusive
economic zone of the Republic of Bulgaria in the deep Black Sea and, upon successful production and
future discovery of the block's gas potential, the country would have its own energy source that would
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
40
provide it with natural gas at the most affordable prices possible, guaranteeing the country's energy
independence. Additionally, the development of the field is expected to stimulate investor interest in the
region and increase the competitiveness of the sector and of household and industrial consumers of
natural gas.
The parties are exploring the possibility of acquiring a share of BEH EAD for participation in the
exploration activities under the Oil and Gas Exploration Contract.
Building New Nuclear Capacity
In fulfillment of Bulgaria’s strategic goals to ensure its energy independence and security in 2023, steps
were taken to build two new nuclear units with a total installed capacity of 2300 MW. In early 2023, an
agreement was signed with Westinghouse Electric Company LLC for the provision of front-end
engineering design (FEED) services to support the construction of an AP1000 nuclear reactor facility at
the NPP Kozloduy site.
On 18 December 2023, a Decision of the National Assembly was adopted (prom. SG No.105/2023) to
take action on the construction of Units 7 and 8 at NPP Kozloduy Site No.2 with AP-1000 technology
with an indicative schedule of priority activities Annex No.1 to the Decision.
Pursuant to the decision, in the second half of December 2023 the Ministry of Energy and BEH EAD
started preliminary preparation of documentation for the pre-selection process of construction
companies, and on 28 December 2023 Bulgarian Energy Holding EAD increased the capital of NPP
Kozloduy - New Builds EAD by a cash contribution of BGN 1,500,000 thousand.
Following a procedure for the selection of a contractor for the project and in accordance with the
Decision of the National Assembly of 23 February 2024, negotiations have been launched with Hyundai
Engineering & Construction Co., which has been shortlisted as a potential construction company for the
engineering, construction, delivery and commissioning of a nuclear power plant at the approved site in
Kozloduy, with AP1000 technology. In November 2024, an engineering contract was signed between
NPP Kozloduy - New Builds EAD and a consortium between the Korean Hyundai Engineering and
Construction and the American Westinghouse Electric Company. In October 2024, an extension of the
Front End Engineering Design (FEED) contract was signed with Westinghouse Electric Company for
the construction of Units 7 and 8 with AP1000 type reactors at the NPP Kozloduy site.
Planned increase in the capital of BEH EAD in the Updated Medium-Term Budget Forecast for the
period 2025-2028
By Decision of the Council of Ministers No.88 of 24.02.2025, an Updated Medium-Term Budget
Forecast for the period 2025-2028 was approved. It is part of the explanatory memorandum to the draft
law of the State Budget of the Republic of Bulgaria for 2025 (prom. SG No.26 of 27.03.2025). In view
of the implementation of investment programs, as well as of assigned public policies for the
capitalization of commercial companies with state participation in the capital, a capital increase of BEH
EAD in the total amount of BGN 2.5 billion is envisaged. This is aimed at providing financing for
structurally decisive projects in the energy sector, such as the Chaira, Batak and Dospat pumped storage
hydropower plants, NPP Kozloduy Units 7 and 8, hydroelectric power plants, hydropower transmission
infrastructure, projects to increase the technical capacity for gas transmission, expansion of the gas
transmission network, reconstruction of power lines, etc. In addition, a BGN 250 million capital increase
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
41
of BEH EAD is foreseen to provide funds to Mini Maritsa Iztok EAD for the implementation of technical
reclamation of the disturbed areas of the East Maritsa Coal Basin deposit.
Digital Transformation of the Power Grid Project
The aim of the project is a comprehensive modernization of the planning, management and maintenance
activities of the electricity transmission grid of the Republic of Bulgaria through the introduction of the
most modern digital tools and methods to ensure the necessary maneuverability, security and quick
response in the management of the power system in the conditions of low carbon production. ESO EAD
is implementing investment C4.I4 Digital Transformation of the Electricity Transmission Network, part
of the Recovery and Resilience Plan of the Republic of Bulgaria, with an approved budget of BGN 611
million (co-financing BGN 370 million from the Recovery and Resilience Mechanism and BGN 241
million from own funds). The investment is being implemented in accordance with an operational
agreement signed by the Ministry of Finance, the Ministry of Energy and ESO EAD.
The implementation of the activities started in early February 2020 and is scheduled to be completed by
the end of March 2026.
GREENABLER Project
The project "Sustainable adaptation of the national transmission network for full integration of the
potential for renewable energy production" (Bulgarian Grid REinforcement ENABLing Full-Fledged
Clean Energy Rollout - GREENABLER) is planned to be implemented through financing from
RePowerEU (EUR 225.5 million) and the Modernization Fund (EUR 631.4 million), with 90% (EUR
771.2 million), with a total indicative budget of EUR 856.9 million, to be financed free of charge. The
project includes (group 1) investments in the reconstruction of about 720 km of existing power lines to
increase their nominal voltage from 220 kV to 400 kV and (group 2) investments in the reconstruction
of the Hemus - Stara Planina power line from 220 kV to 400 kV, reconstruction of 888 km of 110 kV
power lines and doubling of 92 km of 110 kV power lines in order to increase the transmission capacity
of existing overhead power lines.
Following the published EC Decision on 12.06.2024 on allocating funds for the implementation of the
investments for 2024 from the first group with funds from the Modernization Fund, a grant agreement
was signed between the Ministry of Energy and ESO EAD on 23.12.2024. The deadline for
implementing investments under the Modernization Fund is the end of 2030, and under REPowerEU -
at the end of 2026.
5.3. Future developments in 2025 by segments
• Electricity Segment
Considerable dynamics and unpredictability of the market environment are expected in the current and
coming years as a result of significant external factors, such as ongoing military conflicts and a highly
volatile electricity market in terms of price. Internal factors such as measures to protect businesses from
high electricity prices and frequent changes in the regulatory framework also have an impact.
With amendments adopted at second reading on May 16, 2025 in the Energy Act of the fifty-first
National Assembly of the Republic of Bulgaria, which are expected to be promulgated in the State
Gazette the current model of parallel functioning of a regulated and free market is changing and a
transition to the next stage of the liberalization of the electricity market, which provides for full
liberalization of the wholesale electricity market from 01.07.2025, while maintaining household
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
42
consumers on a regulated market. In this regard, in order to guarantee the security of electricity supplies
to households after 1 July 2025 and given the withdrawal of NEK EAD as a public supplier, the
amendments to the Energy Act aim to ensure the needs of end suppliers to cover the electricity
consumption of households in the country by creating a new mechanism (segment) on the exchange
market, which includes long-term products. This segment will be open to all sellers (i.e. producers and
traders of electricity) and will include a newly created non-standard product (traded on an organized
exchange market), which will be tailored to the specific consumption profile of end suppliers. The model
provides for NEK EAD to act as a coordinator of a balancing group, which will have the opportunity to
offer electricity to the specially created new market mechanism.
In line with the provisions set out in the approved by Decision of the Council of Ministers No.237 of 22
April 2025 draft amendment to the National Recovery and Resilience Plan of the Republic of Bulgaria,
the government's position on dropping the commitment to liberalize the retail market for household
consumers by 31 December 2025 at the latest, with the adopted changes to the Electricity Act, the
transitional period for the functioning of the electricity market is extended, with the introduction of the
liberalization of the retail market being postponed to a later stage, when adequate mechanisms for the
protection of Bulgarian consumers have been developed.
The strategic goals of NPP Kozloduy EAD are related to ensuring the highest level of safety, efficient
and competitive production, maintaining qualified, competent and motivated personnel and preserving
the financial stability of the company. In order to meet the requirements of EURATOM, an Agency for
diversification of fresh nuclear fuel (FNF) supplies, the activities under the contracts concluded with
Westinghouse for supply of fresh nuclear fuel cartridges for Unit 5 and with Framatom for supply of
FNF for Unit 6 will be carried out.
From the second half of 2025, NPP Kozloduy EAD will conclude transactions with electricity only on
an organized stock market, with the exception of the sales under Art. 119 of EA. A priority for a basic
nuclear producer such as NPP Kozloduy EAD, operating entirely in market conditions, is to ensure the
operation of the units with nominal power (base load) in the long term, in strict compliance with the
characteristic technological requirements and limitations. In this regard, the commercial activity of the
company in the future will be aimed at ensuring the full realization of the produced electricity. The
company's price policy for free supply will be oriented towards ensuring secure and rhythmic sales
revenue, in line with market conditions.
The main challenge for NPP Kozloduy EAD is the implementation of the Decision of the National
Assembly (NA) for undertaking specific steps on the construction of units 7 and 8 at site No.2 of NPP
Kozloduy EAD with AR1000 technology. The construction of a new nuclear capacity is related to the
need for the Bulgarian state to take actions to ensure long-term base capacity in connection with the
green deal and the ongoing energy transformation, given the advantages and the capabilities of nuclear
energy as a safe, reliable, sustainable and low-emission alternative. With the Decision of the National
Assembly (prom., SG No.105 of 19.12.2023) an indicative time schedule for the project implementation
was also approved. The first steps were taken with the increase of the capital of the project company
NPP Kozloduy - New Builds EAD by BGN 1,500 million, by increasing the capital of NPP Kozloduy
EAD. The purpose of this action was to provide the funding necessary for the starting the next stage of
the investment intention for construction of a new nuclear capacity, where a contract for execution of
the actual engineering, including also a technical design, will be awarded. By decision of Protocol
No.102-0224/23.10.2024 of the Board of Directors of BEH EAD, consent was given to decisions taken
by Protocol No.51/23.10.2024 of the Board of Directors of NPP Kozloduy EAD to increase the capital
of NPP New Builds EAD by BGN 300 million. At this stage, it is planned to start the activities on the
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
43
structuring the project financing and the beginning of negotiations with banking institutions, with a view
to attracting the necessary funds.
The future development of NEK EAD will be in accordance with the licenses held by the company and
will be determined by the future model for full liberalization of the electricity market. The activity of
the company will be aimed at fulfilling the main obligations of NEK EAD as a Public Supplier to satisfy
the consumption of the End Suppliers until this activity ceases as a result of the legislative changes. In
parallel with this, the company's goal is not to allow a price deficit and to demand from the EWRC a
mechanism for recovery of the one accumulated to NEK EAD until now to be developed. In the field of
production, the company will strive to use the available water resources as efficiently as possible, as
well as to gradually refurbish the facilities to ensure their safe and reliable operation. On the free
electricity market, NEK EAD will strive to expand its market share through the hydro facilities at its
disposal providing vital services for balancing the electricity system of the country.
In line with the European requirements to achieve zero carbon neutrality, NEK EAD is actively
exploring possibilities for construction of renewable energy sources, electricity storage systems (through
batteries and PSHPP), modernization and expansion of the existing capacities and other projects in this
direction.
In order to ensure the adequacy of the energy sector in Bulgaria in the long-term perspective, it is of key
importance to preserve the power generation capacities, which have a key role on the one hand for
generation, and on the other for the regulation of the electricity system, as well as building new ones,
by using innovative, low-carbon and sustainable technologies.
The TPP Maritsa East 2 EAD strategy of includes the implementation of investment projects, the main
goal of which is the modernization of the Power Plant and limiting environmental pollution. The
completion of already started projects and the implementation of new ones is a prerequisite for TPP
Maritza East 2 EAD to maintain its key position as one of the main producers of electricity in the
country. A higher capacity utilization with a lower emergency rate, higher efficiency and environmental
friendliness of the plant, ensuring energy security in the country, is achieved as a result of the
implementation of the investment and repair programs.
To ensure the adequacy of the energy sector in Bulgaria in the long term, it is of key importance to
preserve electricity generation capacities, which play a key role on the one hand for generation and on
the other in the regulation of the electricity system, as well as to build new ones through the use of
innovative, low-carbon and sustainable technologies. In this regard, the role of the transmission system
operator in the process of transition to a low-carbon market model is of key importance and covers
directions such as the integration of new renewable capacities through implementation of innovations
contributing to the flexibility and development of the transmission network, increasing and efficient
distribution of intersystem capacity and last but not least - ensuring the necessary level of security of
supply.
• Natural Gas Segment
The market goals of Bulgargaz EAD are related to maintaining market positions in the country and
entering new regional gas markets. To achieve these goals, Bulgargaz EAD has obtained licenses for
natural gas trade in Greece and Hungary, as well as permits for natural gas supply to Slovakia and
Romania. The company is a registered user of the gas transmission networks of Bulgartransgaz EAD-
Bulgaria, DESFA SA-Greece, TRANSGAZ SA-Romania, ICGB Bulgaria, GASTRANS d.o.o. -Serbia.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
44
Diversification of supply sources
Bulgargaz EAD ensures the supply of natural gas through a long-term contract for supply of Azerbaijani
natural gas from the Shah Deniz field through the IGB (Greece-Bulgaria intersystem connection) gas
pipeline with Azerbaijan Gas Supply Company (AGSC), concluded in 2013, with validity period 25
years from the date of the first delivery - 31.12.2020. Bulgargaz EAD has reserved a long-term capacity
in the IGB gas pipeline, corresponding to the quantities of Azeri gas agreed for delivery.
Pursuant to the state strategy for diversification of natural gas supply routes and sources for the country
and Decision No.166 of 10 March 2020 of the Council of Ministers, Bulgargaz EAD has reserved
capacity at the liquefied natural gas terminal to Alexandroupolis for the supply of 5,300,000 MWh/year
for a period of 10 years. Pursuant to Decision No.661 of 15 September 2022 of the Council of Ministers
(CoM), Bulgargaz EAD has reserved an additional capacity at the liquefied natural gas terminal near
the town of Alexandroupolis, Republic of Greece - Gastrade S.A., for 5,300,000 MWh/year (≈ 500
million cubic meters per year) for a period of 10 years, starting from the year of commercial operation
of the terminal (from 2024), with which the total reserved capacity is 10,600,000 MWh/year.
In order to secure the delivery routes from the LNG terminals to the Bulgarian gas transmission network,
Bulgargaz EAD participates in tenders and reserves non-interruptible capacity products at entry-exit
points of the Bulgarian gas transmission network. For entry points where there is a risk of interruption
of capacity products (points where only interruptible products are offered), Bulgargaz EAD was able to
carry out the delivery through swap transactions, thus avoiding the risk of interruption of capacity
products.
At the end of 2022, an Agreement was signed between Bulgargaz EAD and the Turkish state gas
company BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş, whereby Bulgargaz EAD is granted
access to the regasification terminals of liquefied natural gas in the Republic of Turkey for 1.5 billion
cubic meters per year and the subsequent transfer of quantities of natural gas to the interconnection point
between the Bulgarian and Turkish gas transmission networks - Strandzha/Malkoclar, for the period
2023 - 2035. The signing of the Agreement with Botash provides a strategic partnership and makes it
possible to balance the supply portfolio of Bulgargaz EAD, providing three entry points from LNG
terminals located in the Aegean Sea - Botash, Revitousa and Alexandroupolis. The agreement entered
into force after its approval by Decision No.26 of 12.01.2023 of the Council of Ministers of the Republic
of Bulgaria.
By a National Assembly Decision of 19.04.2024, the Minister of Energy was assigned to take the
necessary actions to renegotiate the Agreement between Bulgargaz EAD and Botas. Bulgargaz EAD
and Botas are in active negotiations to renegotiate the Agreement, with the Ministry of Energy providing
the necessary institutional and political support.
Diversification of delivery routes
The Republic of Bulgaria has a strategic geographical location, a well-developed gas infrastructure with
a high level of interconnection and significant capacity. With the implementation of new infrastructure
projects, the country is developing its potential of being an increasingly significant factor in ensuring
energy independence and diversification of sources and routes for the supply of natural gas for the
region.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
45
With the implementation of new gas infrastructure projects in the country and the region, a significant
increase in the quantities of natural gas from alternative sources is expected, which will be transported
through the gas transmission infrastructure of Bulgartransgaz EAD both for Bulgaria and for the
countries of the region.
On 1 October 2024, the LNG terminal near the city of Alexandroupolis was put into operation, equipped
with a state-of-the-art technology facility, allowing for regasification with a maximum capacity of 5.5
billion cubic meters per year. The terminal consists of a floating LNG storage and regasification facility,
an underwater and onshore gas pipeline, and a metering station, where the facility connects to the
national gas transmission system of the Republic of Greece. Thanks to the project, additional quantities
of natural gas will be provided for the gas markets in the region, offering access to various sources
(USA, Egypt and others). Through existing and planned gas pipelines in the region, natural gas from the
terminal will be supplied to consumers in Bulgaria as well as the Republic of North Macedonia, Serbia,
Romania, Hungary, Moldova and Ukraine, providing them with the opportunity to take advantage of
the dynamically developing LNG market and the benefits it offers - flexibility, competitiveness and
security of supply, as well as access to new gas suppliers for natural gas supplies. On 3 October 2024,
the first delivery of liquefied natural gas to the Republic of Bulgaria took place, with the regasification
of one million megawatt hours of liquefied natural gas.
The vertical gas corridor is a strategic project for ensuring security of supply and diversification of
natural gas supplies for Bulgaria and the countries of South-Eastern, Eastern and Central Europe. The
projects, developed by Bulgartransgaz EAD, to increase transmission capacities from Greece to Bulgaria
and from Bulgaria to Romania are a key part of the overall vision of the Vertical corridor, as their
implementation and the already available infrastructure in Bulgaria are the basis for achieving the set
goals for diversification and improving the security of supplies.
A project in the conceptual phase is the construction of a second gas interconnector between the
Republic of Bulgaria and the Republic of Northern Macedonia with Petrich - Strumica route. The
development of intersystem connectivity between the Republic of Bulgaria and the Republic of North
Macedonia will contribute to increasing the energy security and integration of the energy markets.
Natural gas storage
Strategic importance for the Republic of Bulgaria has the project to increase the capacity of Chiren UGS
facility and its turning into a commercial storage facility. Chiren USG plays a major role in
compensating for the seasonal irregularity in the consumption of natural gas in the country and providing
an emergency reserve in unforeseen and force majeure situations. The increased storage, extraction and
injection capacities will give the market an additional flexibility and will ensure the security of natural
gas supplies and will contribute to improving competition and access to natural gas from alternative
sources. In this way, the project will help increase the liquidity of the gas markets in Bulgaria and the
region.
The expansion of the Chiren UGS is in synergy with the LNG terminal project near Alexandroupolis, in
which Bulgaria participates through Bulgartransgaz EAD with a 20% shareholding. In this way gas
traders and users in the region will be enables to take full advantage of the dynamic development and
competitive advantages provided by the liquefied natural gas market. This will enable gas traders and
users in the region to take full advantage of the dynamic development and competitive advantages
provided by the liquefied natural gas market. The Bulgarian participation in the project is strategically
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
46
important for the diversification and security of energy supply for Bulgaria and other countries in the
region.
Shrinking consumption and increasing the storage capacity
The escalation of the Russian military aggression against Ukraine since February 2022 has led to a
significant reduction in gas supplies, leading to a record high and volatile energy prices and it created
the risk of a further economic decline in Europe.
In order to ensure the security of gas supplies in the EU, Council Regulation (EU) 2022/1369 of 5 August
2022 lays down rules for dealing with a situation of serious difficulties in the field of gas supplies. In
order to ensure the security of gas supplies in the EU, Council Regulation (EU) 2022/1369 of 5 August
2022 lays down rules for dealing with a situation of serious difficulties in the field of gas supplies.
According to the Regulation, the member states should make every possible effort to reduce their gas
consumption in the period from 1 August 2022 to 31 March 2023 by at least 15% compared to their
average gas consumption in the period from 1 August until 31 March in the five consecutive years
preceding the entry into force of the Regulation. The continuing need to reduce gas demand in order to
ensure security of supply and limit price volatility has led the Council to extend the Regulation by 1
year - until 31 March 2024. According to the Council Recommendation of 27 February 2024 the validity
of the Regulation was extended for a new period from 1 April 2024 to 31 March 2025 ("reduction
period") by at least 15% compared to its average gas consumption in the reference period from 1 April
2017. until 31March 2022.
In addition to the reforms adopted in the internal gas market, on 29 June 2022, the EU adopted
Regulation (EU) 2022/1032, which obliges all EU members to fill their gas storage facilities to at least
80% of their capacity. The validity of the Regulation has been extended also in 2024, when by 1
November the storage facilities shall be 90% full. To achieve the goals of 80% gas storage capacity,
reduced customer consumption and the high cost of gas in the storage, production for the 2022-2023 gas
season was severely limited, which led to the presence of large natural gas stocks at the end of the season
- April 2023.
Bulgargaz EAD produced quantities during the period January-April 2024, with the set production price
being significantly below their acquisition cost. In this way, the company was able to reduce its stored
quantities and sell them on the market.
The quantities of natural gas that Bulgargaz EAD was unable to produce from the Chiren UGS by
15.04.2024 were transferred as fulfillment of the obligation under the Emergency Action Plan for the
2024/2025 gas year.
• Coal Segment
The climate neutrality road map of Bulgaria, adopted by decision No.59 of 26.01.2024 of the Council
of Ministers, considers both the risks associated with climate change and the changing realities regarding
the electricity industry in Bulgaria and the interacting economic, environmental and social factors.
Based on the conclusions in the Report of the Energy Transition Commission, the final date for the
gradual cessation of the use of coal is 31.12.2038, and subsequent implementation of measures to restore
the disturbed areas and preparation for new economic activities in the Company.
In response to the challenges faced by Mini Maritza - East EAD, actions are taken to preserve the energy
profile of the region, through investments in the field of clean technologies, low-emission productions
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
47
and scientific research and development activities, using the potential of the available infrastructure,
human capital and land.
Mini Maritza - East EAD also plans actions aimed at developing projects and adapting financing
programs using sources such as:
➢ The Just Transition Fund, which is a financial instrument within the Cohesion Policy and aims
to provide support to territories facing serious socio-economic challenges arising from the
transition to climate neutrality;
➢ The Modernization Fund, which is funded by the from the emissions allowances auctions as per
the EU Emissions Trading Scheme, with the aim of supporting the transition to climate
neutrality;
➢ The Cohesion Fund, the purpose of which is to strengthen the economic, social and territorial
cohesion of the European Union to promote sustainable development;
➢ The Social Climate Fund, established by Regulation (EU) 2023/955 of the European Parliament.
By a decision of the National Assembly in 2024 (published in the SG № 38/30.04.2024), it was assigned
for all necessary actions to be taken in compliance with the applicable Bulgarian and EU legislation to
provide funds from the state budget to Mini Maritsa-Iztok EAD, in the amount of BGN 250,000
thousand per year for a period of four years, in order to ensure activities for technical reclamation of the
disturbed terrain of the East Maritsa Coal Basin deposit. The funds will be provided only and solely on
the condition that the reclamation activities are carried out solely by Mini Maritsa-Iztok EAD, and no
assignment or subcontracting of the activities to private companies and/or companies with state or
municipal participation is allowed.
• Corporate governance
BEH EAD will actively continue its activities on the implementation of effective management practices
within the Group. The aim of the management is to provide a long-term vision for the development of
the Group companies which is in line with the Energy Strategy of Bulgaria.
The management of BEH EAD works in close cooperation and takes advantage of the necessary support
from the State represented by the Minister of Energy. In the process of management of the holding and
its subsidiaries, all important decisions regarding the management strategy and their future development
are taken after being agreed and approved by the principal – the Minister of Energy.
6. Events after the reporting period
No adjusting events or significant non-adjusting events have occurred since the date of the reporting
period to the date of approval of the consolidated financial statements for publication, except for the
following non-adjusting events:
Changes in the Accounting Act
In February 2025, the National Assembly adopted amendments to the Accountancy Act aimed at
postponing the requirements for non-financial reporting by enterprises by one year. The changes were
published in the State Gazette, issue 17 of 28.02.2025. Initially, according to European Directive
2022/2464, companies with over 500 employees had to submit non-financial sustainability reports for
2024. With the new amendments, this deadline has been extended by one year, with the first submission
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
48
of such reports being for 2025. The changes aim to facilitate the transition and adaptation of companies,
reducing the risk of inaccuracies and improving the quality of the reports.
Target contributions to the Security of the Electricity System Fund
With § 2, para. 1 of the Final Provisions of the Law on the Collection of Revenues and the Execution of
Expenditures in 2025, until the adoption of the Law on the State Budget of the Republic of Bulgaria for
2025, the mechanism for collecting targeted contributions to the "Security of the Electricity System"
fund has been extended. The target contribution represents the positive difference between market
revenues and the determined revenue ceiling for the relevant type of producer, with a delivery period
from 1 January 2025 to 31 December 2025.
Changes in the Energy Act
With amendments adopted at second reading on May 16, 2025 in the Energy Act of the fifty-first
National Assembly of the Republic of Bulgaria, which are expected to be promulgated in the State
Gazette, the current model of functioning of the electricity market in our country is changing. The
change provides for full liberalization of the wholesale electricity market from 01.07.2025, while
maintaining household consumers on a regulated market. It is envisaged that end suppliers will supply
end household customers, and a new mechanism (segment) of IBEX EAD is being created to ensure the
necessary quantities of electricity. This segment will be open to all sellers (i.e. producers and traders of
electricity) and will include a newly created non-standard product (traded on an organized exchange
market), which will be tailored to the specific consumption profile of end suppliers. The model provides
for NEK EAD to act as a coordinator of a balancing group, which will have the opportunity to offer
electricity to the specially created new market mechanism.
Determining a revenue ceiling for electricity producers for the period July 1 – December 31, 2025.
With a decision of the Council of Ministers No.380 of May 28, 2025 the values are determined (in BGN
per MWh) that serve to calculate the revenue ceiling for the respective type of electricity producer
under § 2, para. 1 of the Final Provisions of the Law on the Collection of Revenues and the Execution
of Expenditures in 2025 until the adoption of the Law on the State Budget of the Republic of Bulgaria
for 2025., The State Social Security Budget Act for 2025 and the National Health Insurance Fund Budget
Act for 2025 are determined for the period July 1, 2025 - December 31, 2025, as follows:
a) for electricity produced by nuclear power plant – 120 BGN per MWh;
b) for electricity produced by hydroelectric power plants owned by the National Electricity Company
EAD – 140 BGN per MWh;
c) for electricity produced by coal-fired condensing power plant, including lignite coal - 400 BGN,
increased by the average monthly price per ton of CO2 emission allowances multiplied by 1.32, per
MWh;
d) for electricity produced by coal with added biomass fuel (solid or gas biomass fuels) and/or waste,
and/or petroleum products, and/or a combination thereof - BGN 400, increased by the average monthly
price per ton of CO2 emission allowances multiplied by 0.9, per MWh;
e) for electricity produced by renewable sources without a contract for compensation with premiums –
300 BGN per MWh.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
49
Bulgarian Energy Holding EAD
Change in the Management Bodies of Bulgarian Energy Holding EAD
By a protocol decision of 7 February 2025 of the Minister of Energy Galina Tsvetanova Todorova was
released as a member of the Board of Directors of Bulgarian Energy Holding EAD and Diyan Atanasov
Ivanov was elected in her place until a new tender procedure is held. The change was entered in the
Commercial Register and the Register of Non-Profit Legal Entities on 13 February 2025.
By a protocol decision of 16 May 2025, the Minister of Energy released Veselina Lachezarova
Kanatova-Buchkova as Chairperson of the Board of Directors of Bulgarian Energy Holding EAD and
Vasil Georgiev Stoynov was elected in her place until a new competition procedure is conducted. The
change was entered in the Commercial Register and the Register of Non-Profit Legal Entities on 22 May
2025.
Credit rating of Bulgarian Energy Holding EAD
On 17 March 2025, Fitch Ratings revised the outlook on Bulgarian Energy Holding EAD's long-term
rating (BB+) to stable from positive and affirmed the rating on its unsubordinated and unsecured debt
at BB+. The outlook revision reflects the expected increase in leverage and high capital expenditure
associated with the construction of the new nuclear units.
Decisions on the establishment and payment to the state of profit deductions from state-owned
enterprises and commercial companies with state participation in capital
The Council of Ministers (CoM), by Order No.1 of 2 May 2025, has determined that state-owned
enterprises and commercial companies with state participation in the capital, with the exception of
hospitals, mental health centers and companies in the Water Supply and Sewerage sector, shall distribute
a dividend for the financial year 2024, in compliance with the requirements of Art. 247a of the
Commercial Act, after deducting the deductions for the Reserve fund, when this fund is not replenished,
in accordance with Art. 101 of the State Budget Act of the Republic of Bulgaria for 2025 - 100 percent.
Pursuant to the Order, Bulgarian Energy Holding EAD shall distribute and pay a 6-month (interim)
dividend based on the adopted 6-month financial statements as of 30 June 2025 in the amount of 100
percent of the reported profit, subject to the relevant application of Article 247a of the Commercial Law.
Natsionalna Elektricheska Kompania EAD
Change in the management of Natsionalna Elektricheska Kompania EAD
On 7 March 2025, Georgi Georgiev Dobrev was listed as a member of the Board of Directors and
Executive Director, replacing Martin Ivanov Georgiev.
On 20 March 2025, Nadya Georgieva Stefanova was listed as a member of the Board of Directors,
replacing Alexander Yulianov Rusanov.
TPP Maritsa Iztok 2 EAD
Determining the revenue ceiling for an electricity producer
With the Decision of the Council of Ministers No.121/05.03.2025 on determining the values used to
calculate the revenue ceiling for an electricity producer from a coal-fired condensing power plant,
including lignite, the amount of BGN 300, increased by the average monthly price per ton of CO2
emission allowances multiplied by 1.32, for one MWh, was determined.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
50
NPP Kozloduy EAD
Additional quantities of electricity from NPP Kozloduy EAD for purchase from the public supplier
By Decision No.Ts-3/01.01.2025 of the EWRC, the estimated monthly availability for electricity
production of the producers from whom the public supplier shall purchase electricity, and the quantities
of electricity that the public supplier shall provide to cover the consumption of the customers of the end
suppliers, as determined by Decision No.Ts-17/30.06.2024 for the period 01.07.2024 – 30.06.2025, has
been amended. As of 01.01.2025, additional quantities of electricity from NPP Kozloduy EAD in the
amount of 400,000 MWh have been determined, whereby the quota for the regulated market determined
for the period 01.07.2024 - 30.06.2025 changes from 5,431,200 MWh to 5,831,200 MWh, while
maintaining the current regulated price of 65.47 BGN/MWh.
Set a revenue ceiling for a producer type
By Decision of the Council of Ministers No.121/05.03.2025, a revenue ceiling for the type of producer
NPP was set at 150 BGN/MWh for the period from 01.01.2025 to 31.12.2025. The same, according to
item 2 of the decree, may be changed if necessary upon a proposal by the Minister of Energy.
Diversifying of fresh nuclear fuel
In accordance with the terms of Addendum 52 to the contract with AO TVEL, two deliveries of fresh
nuclear fuel were made. On 25 March 2025, the first delivery of 42 TVSA-12 cartridges and 12 pcs. of
PP SUS (absorbing rods for control and protection systems), and on 23 April 23 2025, the second
delivery of 42 TVSA-12 cartridges was made. On 10 April 2025, 42 RWFA nuclear fuel assemblies
manufactured by Westinghouse Electric Sweden AB were delivered.
Bulgargaz EAD
Extension of the term of a bank guarantee
Pursuant to a contract concluded in 2020 with a banking institution, the company was granted a credit
product in the form of an issued bank guarantee in favor of a supplier of natural gas. The term is renewed
periodically, every six months, and in the last reference - a term until 11 August 2025 and an amount of
USD 140,362 thousand.
Release of bank guarantee
On 28 January 2025, the LNG terminal near Alexandroupolis stopped operating due to a technical
failure. The operator of the terminal Gastrade S.A. was unable to set a date from which the terminal is
expected to resume operations. Therefore, Bulgargaz EAD requested the release of the bank guarantee
in the amount of EUR 48,679 thousand, which maintains credit protection in favor of Gastrade S.A.
Conclusion of overdraft agreements by banking institutions
To secure natural gas supplies in January and February 2025, Bulgargaz EAD withdrew overdrafts from
banking institutions, guaranteed by BEH EAD, with a total limit of BGN 220 million.
Mini Maritsa-Iztok EAD
Change in the Board of Directors of Mini Maritsa-Iztok EAD
According to minutes No.13-2025 of 20 February 2025, a decision was made at a meeting of the Board
of Directors of Mini Maritsa-Iztok EAD to change the composition of the Board of Directors Stelian
Koev was released as a member and Tihomir Tenev was elected in his place. The change was entered
in the Commercial Register and the Register of Non-Profit Legal Entities on 7 March 2025.
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
51
Bulgartransgaz EAD
Additional increase in the subordinated bond loan provided by each shareholder in the capital of
Gastrade S.A.
In accordance with decisions of the Management and Supervisory Boards, on 13.02.2025,
Bulgartransgaz EAD transferred from the Company's account at the National Bank of Greece, on which
a pledge was established, EUR 2,910 thousand for an additional increase in the subordinated bond loan
provided by each shareholder.
Change in the Management and Supervisory Board of Bulgartransgaz EAD
By its decision of 17 January 2025, the Supervisory Board of Bulgartransgaz EAD elected Vladimir
Malinov as a member of the Management Board of the gas transmission operator. The decision of the
Supervisory Board was approved by the Energy and Water Regulatory Commission on 23.01.2025. As
of 29.01.2025, Vladimir Malinov has been entered as the Executive Director of Bulgartransgaz EAD in
the Commercial Register and the Register of Non-Profit Legal Entities, replacing Kiril Ravnachki.
As of 25 March 2025, Ekaterina Mihaylova, who replaces Alexander Kanazirski, is entered in the
Commercial Register and the Register of Non-Profit Legal Entities as a member of the Supervisory
Board of Bulgartransgaz EAD.
Change in the Audit Committee of Bulgartransgaz EAD
By its decision of 3 April 2025, the Board of Directors of Bulgarian Energy Holding EAD released
Silvia Todorova as a member of the Audit Committee of Bulgartransgaz EAD and elected Lilyana
Dragieva as a member of the Audit Committee as of 3 April 2025, with the mandate of the remaining
members.
Change in the Board of Directors of Gas Hub Balkan EAD
According to the decision of the Board of Directors of Gas Hub Balkan EAD of 29 January 2025,
Vladimir Malinov was elected as a member of the Board of Directors, and Darina Koleva was released
as a member of the Board of Directors of Gas Hub Balkan EAD. These circumstances were entered in
the Commercial Register and the Register of Non-Profit Legal Entities on 4 February 2025.
Early repayment of loan agreements with banking institutions
On 8 April 2025, a loan agreement concluded in 2021 with UniCredit Bulbank AD in the amount of
EUR 20,000 thousand was repaid early.
On 11 April 2025, a loan agreement concluded in 2021 with Investbank AD in the amount of EUR
10,333 thousand was repaid early.
Conclusion of annexes to loan and collateral contracts
In accordance with decisions taken by the Management and Supervisory Boards of Bulgartransgaz EAD,
annexes to concluded loan and collateral agreements have been signed with:
United Bulgarian Bank AD - Annex No.3 dated 24.04.2025 to the 2020 loan agreement, which reduces
the loan interest rate from EURIBOR+1.75% to EURIBOR+1.40%
DSK Bank AD - Annex No.4 dated 17.04.2025 to the 2020 loan agreement, which reduces the loan
interest rate from 1M EURIBOR+1.65% to 1M EURIBOR+1.39%
Bulgarian Energy Holding EAD
ANNUAL CONSOLIDATED MANAGEMENT REPORT
For the year ending 31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
52
DSK Bank AD - Annex No.4 dated 17.04.2025 to the 2021 loan agreement, which reduces the loan
interest rate from 1M EURIBOR + 1.65% to 1M EURIBOR+1.39%
Citibank Europe AD - Annex No.1 dated 17.04.2025 to the 2021 loan agreement, which reduces the
loan interest rate from the APR+1.70% to the APR+1.40%
D Commerce Bank AD - Annex No.3 dated 24.04.2025 under a loan agreement from 2021, by which
the interest rate on the loan is reduced from 1M EURIBOR+1.75% to 1M EURIBOR+1.20% and a
change in the interest rate under the collateral agreement from 0.01% to SOFR - 0.40%.
Electricity System Operator EAD
Change in electricity prices by decision of the EWRC
EWRC opened a procedure for amending the electricity prices approved by Decision No.Ts-17 of
30.06.2024 and from 01.01.2025 by Decision No.Ts-3/01.01.2025 approved new prices for electricity.
With the new pricing decision, the Regulator changes the estimated market price for base load
determined by ESO EAD for the period 01.01.2025 - 30.06.2025 from 178.64 BGN/MWh to 219.01
BGN/MWh, or an increase of 22.6% The increased amount of the approved costs for the purchase of
technological losses leads to a change in the pricing elements forming the transmission price, which
changes from 12.70 BGN/MWh to 13.66 BGN/MWh according to Decision No.Ts-3/01.01.2025. The
remaining parameters and prices for ESO EAD, approved by Decision No.Ts-17/30.06.2024, remain
unchanged.
Memorandum of Support and Cooperation
On 20 March 2025, a Memorandum of Support and Cooperation was signed between ESO EAD,
Bulgarian Development Bank EAD, National Association of Municipalities in Bulgaria and the
Association of Bulgarian Employers' Organizations, with which the parties declare their readiness for
joint cooperation to promote a Mechanism for financing activities for optimizing electricity
consumption costs in municipal companies, public enterprises, private legal entities, etc. The
Mechanism will be implemented by ESO Charge EAD through several methods, including the
construction of production capacities from renewable sources on rooftops, storage facilities, energy
arbitrage, with financing from Bulgarian Development Bank EAD and their payment through contracts
for guaranteed results for clients.
National Energy Operator EAD
Change in the management of National Energy Operator EAD
By decisions of Minutes No.16-2025/28.02.2025 of the Board of Directors of Bulgarian Energy Holding
EAD, Georgi Georgiev Dobrev was released as a member of the Board of Directors of National Energy
Operator EAD and the management contract was terminated, without release from liability. Said Haisam
Hamameh was elected in his place for a period from the date of entry of the decision in the Commercial
Register and the Register of Non-Profit Legal Entities until a new competition procedure is conducted.
The change was entered in the Commercial Register and the Register of Non-Profit Legal Entities on 7
March 2025.
VALENTIN NIKOLOV Signed with electronic signature
EXECUTIVE DIRECTOR
BULGARIAN ENERGY HOLDING EAD
15.05.2025
City of Sofia
BULGARIAN ENERGY HOLDING EAD
CONSOLIDATED CORPORATE GOVERNANCE STATEMENT
31 December 2024
1. GENERAL PROVISIONS
This Corporate Governance Statement consisting of the parent company Bulgarian Energy Holding EAD (BEH EAD,
the Company) and its subsidiaries was prepared in compliance with the requirements of Art. 40 para. 1 of the
Accountancy Act and according to Art. 100n, para. 8 in relation to para. 7, item 1 of the Public Offering of Securities
Act (POSA).
Bulgarian Energy Holding EAD is a public interest entity under §1, item 22 of the additional provisions of the
Accountancy Act and Art. 2 of Directive 2013/34/EU of the European Parliament and of the Council whose
transferable securities are admitted to trading on a regulated market in a Member State of the European Union.
BEH EAD is a separate legal entity under the Bulgarian law, a sole-owner joint stock company acting in accordance
with the provisions of the Commercial Act, the Public Enterprises Act, the Rules on the application of the Public
Enterprises Act (the Rules) and the other legislative acts of the Republic of Bulgaria. The sole owner of the capital,
who has all the rights of a shareholder under the law and the Articles of Association, is the Bulgarian state through
the Minister of Energy.
The Company is managed by a one-tier management system. The Board of Directors has management, representative
and control functions.
The implementation of the Corporate Governance Code is both a statutory requirement and a result from the
willingness of the management for a constant improvement of the principles and practices for corporate governance
established within the Company. The efforts of the executive management are focused on the transparency of the
activity through presentation of due and complete information, stakeholder consideration, independence, and
prevention of conflict of interests.
The Group observes the established principles and norms of corporate governance provided for in the effective
legislative acts, applicable for its activity. Furthermore, the Company is involved in certain actions and policies with
regard to the subsidiaries’ sustainable development, including the disclosure of information, related to the climate and
social aspects of their activity. The Board of Directors of BEH EAD encourages the implementation and monitors the
observation on behalf of the subsidiaries of the established principles for sustainable development at a group level,
and it also contributes to the establishment of sustainable development culture.
The BEH Group places great importance on fostering effective relationships with various stakeholders. These
stakeholders include certain individuals or groups directly impacted by the Company’s operations and who also
possess the ability to influence its activities. This includes suppliers, clients, employees, creditors, advocacy groups,
and others. The Company identifies these stakeholders based on their significance, areas of influence, roles, and
commitment to sustainable development. The Board of Directors of BEH EAD complies with legal requirements when
engaging with stakeholders. The corporate management of the Holding and its subsidiaries guarantees respect for the
stakeholder rights as mandated by law or through mutual agreements with the companies. In accordance with the good
practice of corporate governance, the Holding takes the stakeholders interest in consideration in accordance with the
principles of transparency, accountability and business ethics.
The Consolidated Corporate Governance Statement of BEH Group is a separate report, which is published along with
the consolidated management report, and both documents are subject to publication on the parent company’s corporate
website: www.bgenh.com.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
3
2. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 1 of POSA
BEH EAD adheres, as appropriate, to the National Corporate Governance Code, established by the Chairperson of the
Financial Supervision Commission within the meaning of art. 100n, para. 8, i. 1, letter “a” of POSA by Decision
No.850-ККУ of 25.11.2021 and adopted by the National Corporate Governance Committee. The Code is applied on
a “comply or explain” principle, i.e. in case of diversion the management clarifies the reasons for this.
The parent company protects the rights of the sole shareholder – the state, described in Chapter 3 of the National
Corporate Governance Code.
BEH EAD implements a Corporate Governance Policy, adopted by the Board of Directors of BEH EAD by a
Resolution under item I.2. of Protocol No.27-2018/17.05.2018. The main purpose of the Corporate Governance Policy
is maintaining and improving standards and management quality corresponding to the best world practices for
transparency, respect to the interested parties, independence, and avoidance of conflict of interests in implementing
the Company activity. As a public enterprise in the energy sector, BEH E AD plays a key role for the economy of
Bulgaria, which predetermines the significance of the good corporate governance. BEH EAD is aware of its
importance for maintaining the economic effectiveness and competitiveness of the Republic of Bulgaria. Its
implementation raises the efficiency, transparency, and responsibility of Bulgarian Energy Holding EAD in pursuing
its activity at levels, competitive to the private sector. It is mandatory for all companies within the holding, as their
executive managements develop and apply internal implementing rules, strategies, and policies in conformity with it.
The strategic goals of the Corporate Governance Policy are:
- Balancing the development of the Company with the interests of the owner, management, stakeholders, and
existing and potential investors.
- Ensuring a mechanism for an honest, responsible and effective management of the Company on behalf of
the management bodies;
- Providing for effective supervision on the management on behalf of the principal and the regulatory bodies;
- Ensuring information security and foreseeability of real and potential investors/bondholders in making
investment decisions.
- Achieving transparency and publicity of the processes for providing information on behalf of the Company
to employees, partners, and stakeholders.
- Raising the trust of the owner, existing and potential investors, and stakeholders and maintaining the good
name of BEH EAD to the public.
BEH EAD adheres to an Information Disclosure Policy of BEH EAD adopted by a Decision under item I.1.10 of
Protocol No.75-2022 of 13 October 2022 of the Board of Directors of BEH EAD. The Policy defines the scope of the
information subject to disclosure by BEH EAD in its capacity as a public enterprise, within the meaning of Art. 2,
para. 1 of the Public Enterprises Act. BEH EAD discloses and provides easy access to all essential information,
including the financial status of the holding and the companies in BEH Group, as well as its structure. BEH EAD
discloses any essential information regarding the operational activity of the Company, regardless of its nature, in
compliance with the principle of equal treatment of the addressees. As soon as possible, the Company discloses
publicly internal information in accordance with Regulation (EU) No.596/2014 of the European Parliament. The
Policy is publicly accessible on the corporate webpage of the Company at: www.bgenh.com.
The Group strictly complies with the requirements for disclosure of information in terms of time and completeness
according to the Bulgarian legislation and instructions of the Minister of Energy. The timely disclosure of information
on the annual, half-yearly, and quarterly reports, as well as management reports related to BEH EAD, is properly
communicated to the public. This is done through the Company’s website, the Ministry of Finance’s website, and a
web-based electronic information system for public enterprises overseen by the Public Enterprises and Control
Agency.
BEH Group publishes consolidated non-financial information in accordance with Art. 29, para. 4 of the Public
Enterprises Act. The consolidated non-financial information provides details on the degree and manner in which the
Company’s operations qualify as environmentally sustainable, namely: what part of their turnover is the result of
products and services, related to economic activities qualified as environmentally sustainable; the share of capital and
operational expenses, if applicable, allocated to assets or processes linked to sustainable activities.
3. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 2 of POSA
The number of the companies in which the members of the Board of Directors can hold managerial positions and the
number of successive mandates of the independent members of the Board of Directors is not defined in the regulatory
acts of BEH EAD. However, the Company complies with the good practices, without a formal regulatory requirement
for prevention of high concentration of control functions in individual companies by one single person.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
4
The remuneration of the members of the executive bodies of BEH Group is determined in accordance with the terms
and conditions of the Rules on the application of the Public Enterprises Act. No remuneration other than that specified
in the Rules is allowed.
The parent company is a public enterprise, which complies with the provisions of the Public Enterprises Act and its
bylaws, and does not apply a deliberate Remuneration Policy.
4. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 3 of POSA
By a decision of the Board of Directors of 28 February 2017, an Internal Audit Unit was established at BEH EAD,
which is a separate department of direct subordination to the Executive Director. The internal audit activities comply
with the requirements of the Public Sector Internal Audit Act. By a decision of the Board of Directors of BEH EAD
under item I.2.1. of Protocol No.68-2017/31.10.2017, as amended by a decision under item I.4.1. of Protocol No.
43/2023 of 29.06.2023, the Statute of the Internal Audit Department was approved. By a decision of the Board of
Directors of BEH EAD under item I.1.1. of Protocol No.47-2023/12.07.2023, a Methodology for the implementation
of internal audit activities by the Internal Audit Department was approved. The scope of audit engagements for
assurance and consultation covers BEH EAD and its subsidiaries, excluding the independent transmission operators.
The internal audit supports the Group's management in achieving its goals by:
- Identifying and assessing the risks in the Group with a view to allocating audit resources to maximize
coverage of the audit environment;
- Assessing the adequacy and effectiveness of the financial management and control system with regard to:
a) identifying, assessing and managing the risk by the Group management;
b) compliance with the legislation, internal acts and contracts;
c) reliability and the comprehensiveness of the financial and operational information;
d) effectiveness, efficiency and economy of the activities;
e) protecting assets and information;
f) performing tasks and achieving goals.
- Providing recommendations to the management of BEH EAD for improvement of the activities in the Group.
On 2 April 2014, a Financial Management and Control System was approved in BEH EAD, which entered into force
on 14 April 2014. In 2024, the Financial Management and Control System was updated and adopted by the Decision
of the Board of Directors of BEH EAD under item I.2.1 of Protocol No.111-2024/15.11.2024 and is effective as of 29
November 2024.
The purpose of the system is to provide reasonable assurance that the objectives of the Company are achieved through:
- compliance with the legislation, the internal acts of the Company and the contracts concluded,
- reliability and comprehensiveness of financial and operational information;
- economy, efficiency and effectiveness of the activities;
- storage and protection of assets and information;
- preventing and detecting fraud and irregularities and taking follow-up action.
Financial management and control are implemented through the following interrelated elements:
- control environment;
- risk management;
- control activities;
- information and communication;
- monitoring.
The control environment includes:
- personal integrity and professional ethics of the employees of the holding,
- management philosophy and work style;
- an organizational structure ensuring separation of responsibilities, hierarchy and clear rules, rights,
obligations and reporting levels,
- human resource management policies and procedures;
- competence of staff.
With a Decision under item I.3. of Protocol No.21-2022/06.04.2022 of the Board of Directors of BEH EAD, an
Updated Risk Management Policy has been adopted at BEH EAD in accordance with the Guidelines of the Ministry
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
5
of Finance for risk management in public sector organizations. The rules and procedures for risk management in BEH
EAD are an integral part thereof.
The management of BEH EAD undertakes constant commitment to the processes of identification, assessment,
analysis and management of risks within the holding, as well as commitment to these processes at all management
and expert levels.
The following are determined in the Risk Management Strategy
- the stages of the risk management process and their content;
- the participants in the implementation of the risk management process.
The implementation of the Strategy aims to:
- Identify, analyze and assess risks with a view to ensuring the possibility of fulfilling the Company’s goals;
- Determine the level of risk appetite and risk response actions (restriction, transfer, acceptance or termination);
- Establish and implement adequate and effective control mechanisms;
- Identify the roles and responsibilities of participants in the risk management process;
- Protect the Company’s reputation.
The Risk Management process in the Company comprises the following:
- Defining the main objectives of the Company;
- Identifying the risks;
- Risk control;
- Risk assessment;
- Documenting the risk;
- Defining the level of risk – risk appetite;
- Review and reporting on risk.
The Executive Director shall implement controls designed to provide reasonable assurance that risks are contained
within tolerable limits and shall include, at a minimum:
- authorization and approval procedures;
- separation of responsibilities in a manner that prevents a single employee from having concurrent approval,
execution, and control responsibilities;
- a dual signature system that does not permit a financial commitment or payment to be made without the
signatures of the Executive Director and the Chief Accountant and Head of the Accounting Department;
- rules for access to assets and information;
- prior control for legality;
- ongoing control over the performance of financial commitments and contracts entered into;
- ex-post performance evaluations;
- policies and procedures for objective, accurate, complete, reliable and timely accounting of all business
transactions in accordance with the accounting policies adopted at BEH EAD;
- policies and procedures for human resource management;
- policies and procedures for maintaining personal integrity and professional ethics.
The information and communication systems in the company shall ensure:
- identification, collection and dissemination in appropriate form and timing of reliable and credible
information to enable each employee to assume specific responsibility;
- effective communication flowing horizontally and vertically to all hierarchical levels of the company;
- establishing an appropriate management information system for the company to make all employees aware
of clear and precise instructions and orders regarding their roles and responsibilities in relation to financial
management and control;
- implementing a documentation and document management system containing rules for the compilation,
formatting, circulation, use and archiving of documents;
- establishing an effective and timely reporting system, including levels and timelines for reporting, types of
reports, forms of reporting when errors, irregularities, misuse, fraud or abuse are detected.
The Executive Director of BEH EAD shall ensure monitoring of the financial management and control system in order
to assess its functioning and to identify weaknesses and deficiencies in a timely manner and ensure its timely updating.
The system includes ongoing monitoring, self-assessment and internal audit
5. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 4 of POSA
5.1. Information under Art. 10, paragraph 1 (c) of Directive 2004/25/ЕC of the European Parliament and
the Council of 21 April 2004.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
6
Bulgarian Energy Holding EAD is the owner of an economically related group, which includes the following
companies as of 31 December 2024:
Company Country of
incorporation Core Business
31 December
2024
31 December
2023
% %
Subsidiaries
Natsionalna Elektricheska
Kompania (NEK) EAD
Bulgaria electricity generation and public
electricity supplier
100% 100%
Bulgargaz EAD Bulgaria public supply of natural gas 100% 100%
Bulgartransgaz EAD Bulgaria storage and transmission of
natural gas 100% 100%
Bulgartel EAD Bulgaria implementation of
telecommunications 100% 100%
Bulgartel Skopje DOOEL Macedonia implementation of
telecommunications 100% 100%
Balkan Gas Hub EAD Bulgaria
construction and operation of an
electronic platform for trade with
natural gas, energy products,
green and white certificates,
carbon-gas emissions
100% 100%
Kozloduy NPP EAD Bulgaria generation of electricity and
thermal energy 100% 100%
HPP Kozloduy EAD Bulgaria
production and distribution of
electricity from a hydroelectric
power plant
100% 100%
NPP Kozloduy – New Builds EAD Bulgaria construction of energy units of a
nuclear power plant 100% 100%
NPP Construction Supervision
EOOD Bulgaria
assessing the compliance of
investment projects and
exercising construction
supervision in design and
construction
100% 100%
NPP Service LTD Bulgaria repair of general and special
purpose machines and equipment 100% 100%
Interpriborservice OOD
(in bankruptcy) Bulgaria installation and maintenance of
automated systems 63.96% 63.96%
TPP Maritsa East 2 EAD Bulgaria generation of electricity and
thermal energy 100% 100%
Mini Maritsa – Iztok EAD Bulgaria coal extraction and sale 100% 100%
Electricity System Operator EAD Bulgaria transmission of electricity 100% 100%
ESO Engineering EOOD Bulgaria
construction of technologies and
projects for energy facilities and
project management
100% 100%
ESO Proekt EOOD Bulgaria
conceptual projects in
accordance with the Spatial
Development Act, consulting
activity
100% 100%
ESO Charge EAD Bulgaria
construction and operation of
electric and hydrogen refueling
systems
100% -
National Energy Operator EAD Bulgaria
Construction and operation of
systems for storage and
utilization of electricity from
RES
100% 100%
Minproekt EAD Bulgaria Design, research and
development engineering 100% 100%
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
7
Company Country of
incorporation Core Business
31 December
2024
31 December
2023
% %
Joint ventures
ICGB AD Bulgaria construction and operation of a gas
transmission system 50% 50%
South Stream Bulgaria AD Bulgaria construction and operation of a gas
transmission system 50% 50%
Southeast Electricity Network
Coordination Center (SEleNe CC) Greece
Regional Security Coordinator for
Southeast Europe with the purpose
of maintaining the electricity
system
33.33% 33.33%
Gastrade S.A. Greece construction of a liquefied natural
gas terminal 20% 20%
Associates
ContourGlobal Maritsa Iztok 3 AD Bulgaria generation of electricity 27% 27%
ContourGlobal Operations
Bulgaria AD Bulgaria
operation and maintenance of a
thermal power plant 27% 27%
ZAD Energy AD Bulgaria insurance and reinsurance 48.08% 48.08%
Allianz Bulgaria Pension Company
AD Bulgaria Pensions 34% 34%
HPC Gorna Arda AD Bulgaria
construction of hydroelectric
power plants 24% 24%
5.2. Information under Art. 10, paragraph 1 (d) of Directive 2004/25/EC of the European Parliament and
of the Council of 21 April 2004
BEH EAD has no issued securities with special rights of control.
5.3. Information under Art. 10, paragraph 1 (f) of Directive 2004/25/ЕC of the European Parliament and
the Council of 21 April 2004.
There are no restrictions on voting rights.
5.4. Information under Art. 10, paragraph 1 (h) of Directive 2004/25/ЕC of the European Parliament and
the Council of 21 April 2004.
The rules that regulate the appointment and replacement of the board members are described in item 5.
The Sole Owner of the Capital amends and supplements the Company’s Articles of Association.
5.5. Information under Art. 10, paragraph 1 (i) of Directive 2004/25/ЕC of the European Parliament and
the Council of 21 April 2004.
The powers of the members of the Board of Directors are described in item 6.
6. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 5 of POSA
The governing bodies of BEH EAD are:
- The Sole Owner of the Capital;
- The Board of Directors.
BEH EAD has appointed an Audit committee under Art. 107 of the Independent Financial Audit and Assurance of
Sustainability Reporting Act.
6.1. Sole Owner of the Capital
6.1.1. Status
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
8
The Sole Owner of the Capital of BEH EAD is the Republic of Bulgaria. The State’s rights as the Sole Owner of the
Capital are exercised by the Minister of Energy, who has the capacity of principal of the Company, and is the body
empowered to make all decisions passed within the competence of the Sole Owner of the Capital according to the law
or to the Articles of Association.
6.1.2. Competence
(1) The Sole Owner of the Capital has all the rights of а shareholder of the BEH EAD according to the law and
to the Articles of Association. The Sole Owner of the Capital shall decide on all matters which the law places
within the competence of the General Meeting of the Shareholders.
(2) The Sole Owner of the Capital:
- amends and supplements the Articles of Association of BEH EAD;
- increases or reduces the capital of the Company;
- transforms or terminates the Company;
- selects and dismisses the members of the Board of Directors and determines their remuneration;
- selects and dismisses the chartered accountant;
- approves the annual financial statements, following the attestation of the appointed chartered
accountant;
- decides on issuing bonds, distributing profits, replenishing the reserve fund and paying out dividends;
- appoints the liquidators upon termination of the Company, except in case of bankruptcy, and enters into
contracts with them;
- discharges the members of the Board of Directors from liability;
- makes decisions on the opening, transfer or closure of the branches of the Company;
- determines the amount of the compensation for the owners of nationalized properties, which they
receive in the cases set forth in Art.18 of the Transformation and Privatization of Governmental and
Municipal Enterprises Act (repealed) and the Compensation of Owners of Nationalized Properties Act;
- approves decisions of the Board of Directors for: disposition transactions with fixed assets and for
establishment of real rights over real estate the value of which exceeds the lower value of BGN 500
thousand or 5% of the total book value of fixed assets to 31 December of the previous year; for use or
rental of real estate or assets, the book value of which exceeds 5% of the total book value of fixed assets
as of 31 December of the previous year; for acquisition of shares and / or stocks in other companies, as
well as for disposal of shares and / or stocks – property of the Company in other companies; to obtain
loans or credit; lending; for concluding contracts for joint activity (the so-called joint venture); to
assume bill of exchange obligations; to secure the obligations of the Company by establishing a
mortgage or pledge on fixed assets of the Company; to provide collateral in favor of third parties; for
the conclusion of a court or out-of-court agreement, which recognizes the obligations of the Company
or forgives the receivables of the Company from third parties; for significant change in the activity of
the Company; for significant organizational changes, for long-term cooperation of essential importance
for the Company, as well as for the termination of such cooperation;
- approves the selection of an insurer when concluding compulsory insurance contracts;
- authorizes the conclusion of contracts for sale, exchange and renting of fixed assets, as well as the
creation of a right in rem through direct negotiation, where the starting price is defined by an
independent evaluator;
- authorizes the sale or exchange of houses, studios, offices and garages of workers and employees of the
Company;
- approves the business program of the Company, drawn up by the Board of Directors;
- makes а decision on the distribution of the Company’s profit and its payment, and on the payment of
royalties to the members of the Board of Directors, and also fixes their amounts.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
9
- chooses, empowers and dismisses the Company’s procurator(s), determines the scope of their
representative power, concludes a contract/s for a power of attorney with notarization of signatures.
- decides also on other matters, provided in its competence by the law and the Articles of Association.
6.1.3. Decision-making
(1) The Sole Owner of the Capital shall make decisions within the competence of an ordinary annual
General Meeting once а year, and within the competence of an extraordinary General Meeting as necessary.
No invitation is announced in the Commercial Register and the Register of Non-Profit Legal Entities by
the Sole Owner of the Capital on the exercise of the competence of the General Meeting. The Sole Owner
of the Capital may make decisions within the competence of the General Meeting at any time in writing.
(2) The Board of Directors fulfills its obligations under Art. 223, respectively under Art. 251 of the
Commerce Act, by sending a written application to the Sole Owner of the Capital regarding the necessity,
respectively the readiness, to make decisions by the Sole Owner of the Capital. The written application
shall contain proposals concerning the matters on which the Board of Directors proposes to the Sole Owner
of the Capital to make decisions. The proposals do not bind the Sole Owner of the Capital to consider and
decide on the issues raised, and do not limit him/her with respect to the range of issues on which he can
make decisions.
(3) For the decisions of the sole owner of the capital, a protocol is drawn up in written form and it is signed
by the principal of BEH EAD.
(4) If the Sole Owner of the Capital wishes the members of the Board of Directors to be present during
the decision-making process, they are obliged to do so. The Sole Owner of the Capital may require from
the present members of the Board of Directors or from other persons invited by him, to countersign the
record with the decisions made by the Sole Owner of the Capital.
(5) The application for registration of the decisions of the Sole owner of the capital, when these decisions
are subject to registration shall be assigned to the executive director, who in such case has the right to solely
represent the Company or to authorize a person.
6.2. Board of Directors of BEH EAD
6.2.1. Composition
As of 31.12.2024, BEH EAD is managed by a Board of Directors with members:
Veselina Lachezarova Kanatova-Buchkova
Galina Tsvetanova Todorova
Valentin Aleksiev Nikolov
Kalin Boyanov Filipov
Ivo Ivanov Todorov
Veselina Lachezarova Kanatova-Buchkova was elected Chairperson of the Board of Directors and Valentin Aleksiev
Nikolov and Galina Tsvetanova Todorova were elected to represent the Company and were appointed as Executive
Directors at a meeting of the Board of Directors.
As of the date of issuance of the Corporate Governance Statement, the current Board of Directors of the Company,
appointed by the relevant protocol decisions of the Minister of Energy, is as follows:
Veselina Lachezarova Kanatova-Buchkova
Diyan Atanasov Ivanov
Valentin Aleksiev Nikolov
Kalin Boyanov Filipov
Ivo Ivanov Todorov
Veselina Lachezarova Kanatova-Buchkova was elected Chairperson of the Board of Directors, and Valentin Aleksiev
Nikolov, who was appointed Executive Director at a meeting of the Board of Directors, was elected to represent the
Company.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
10
6.2.2. Status
(1) The Board of Directors reports to the Sole Owner of the Capital for the management of the Company.
It holds meetings depending on the need, but at least once every three months.
(2) The Board of Directors consists of at least five members – natural persons, who are elected and
appointed after holding a competition, under conditions and by the order, regulated in the Regulations for
application of the Public Enterprises Act.
(3) The Board of Directors elects one or two of its members as executive members and the rest are non -
executive members. The term of the Board of Directors has а duration of 3 (three) years, as of the entry of
the Board of Directors in the Commercial Register and the Register of Non-Profit Legal Entities, with the
Board of Directors continuing to exercise its competence until а new Board of Directors is entered even
after its term has expired.
(4) A member of the Board of Directors of the Company can be a Bulgarian citizen or a citizen of the
European Union, a member-state under the Agreement on the European Economic Area or the
Confederation of Switzerland, who:
- Has a university degree;
- Has at least 5 years professional experience;
- Is not placed under guardianship;
- Has not been convicted of a general criminal offense;
- Is not deprived from the right to hold the respective office;
- Is not declared insolvent as a sole trader or a general partner in a company, which has been declared
insolvent, if there are unsatisfied creditors left;
- Has not been а member of an executive or supervisory body, respectively cooperation, terminated
due to insolvency in the last two years before the appointment, if there are unsatisfied creditors left;
- Is not a husband/wife or a person in de facto cohabitation, relative in a straight line, or in a collateral
line up to the fourth degree inclusive, and by matchmaking - up to the second degree inclusive, of a
manager or a member of a collective body for management and control of this public enterprise;
- Does not hold a senior public office under Art. 6, para. 1, items 1-38 and 41-45 of the Counteracting
Corruption Act, is not a member of a political office or a municipal secretary;
- Does not perform commercial transactions similar to the Company’s activity on its own behalf or
on the behalf of a third party.
- Is not a partner in a general partnership, limited partnership companies and limited liability
companies, when it performs an activity similar to that of the Company;
- Is not a director or member of an executive or supervisory body of another public company.
(5) Executive members of the boards of directors cannot be persons who work under an employment
contract or under an official legal relationship.
(6) The Company may have one or two procurators, for which people meeting the requirements listed above
may be chosen. The procurators are assigned and empowered by the Sole Owner of the Capital of the
Company. The contracts with the procurator(s) are signed by the Sole Owner of the Capital.
6.2.3. Functions
The Board of Directors is responsible for managing the Company and overseeing the activities of the Executive
Director(s), including the implementation of the Policies. It shall perform all functions and decide on all matters which
are not within the exclusive competence of the Sole Owner of the Capital by virtue of the law or the Articles of
Association of the Company. The Board of Directors shall adopt Regulations for its operation.
The Board of Directors may establish special committees comprising of its members, such as remuneration or risk
management committees. The committees prepare decisions to be adopted by the Board of Directors. Decision-making
powers shall not be delegated to committees. The committees shall be chaired by an independent member of the Board.
The Board of Directors makes annual self-assessments of its activity and efficiency, which are presented to the body,
exercising the rights of the State and the Agency for Public Companies and Control.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
11
6.2.4. Competence
(1) The Board of Directors carries out all the responsibilities and authorities of a Board of Directors as
defined by the law and the Articles of Association of BEH EAD.
(2) The Board of Directors:
- organizes, manages and monitors the entire activity of BEH EAD;
- prepares a business program of BEH EAD for the whole term and for each year separately and ensures
its implementation;
- implements the investment policy of the Company and decides on the acquisition of property and other
real estate rights;
- settles the issues related to the movement and the marketing of the equity securities of BEH EAD, the
bonds and the securities in civil turnover, which are not of the exclusive competence of the Sole Owner
of the Capital, or which have been delegated to it by the principal;
- elects one or two of its members as executive directors and authorizes them to manage and represent
the Company before third parties. In case that two executive directors are elected, they represent the
Company in a manner determined by the Board of Directors.
- makes unanimous decisions on all transactions set forth in Art. 236, para. 2 of the Commerce Act;
- adopts Corporate Governance Policy, Financial and Accounting Policy, Information Technology
Policy, Human Resource Management Policy, Investment Management and Projects Policy, Public
Procurement Policy (including Policy for Conducting Tenders, Competitions and Direct Contracts for
the Supply of Goods and Delivery of Works and Services), Policy on Tenders, Competitions and Direct
Contracts for Sale, Exchange and Leasing of Fixed Assets, Risk Management and Internal Audit Policy,
and other policies that are mandatory for the Company and its subsidiaries; it is also responsible for
implementing those Policies;
- makes proposals to the principal for solving issues, which are of the competence of the Sole Owner of
the Capital, and decides on all other issues provided for resolution by the Board of Directors in the
Company's Articles of Association.
(3) With а prior written approval of the Principal, the Board of Directors may change the Executive Director
at any time, and replace him/her with another member of the Board of Directors.
6.2.5. Contracts with members of the Board of Directors of BEH EAD, Remunerations and Expenses
(1) Each member of the Board of Directors concludes a management contract with the Sole Owner of the
Capital. The contract is concluded until the end of the term of the Board of Directors and contains the rights
and obligations of the parties, the amount of remuneration and the method of its payment, the liability of
the parties in case of default, the grounds for termination of the contract, and the type and amount of the
guarantee, which the members provide for their management, and the amount of the penalty for early
termination of the contract not through the fault of the member the Board of Directors, as well as the
relations between the parties in the period from the contract termination to the deletion of the released
member of the Board of Directors from the Commercial Register and the Register of Non-Profit Legal
Entities.
(2) The members of the Board of Directors receive remuneration determined in terms of amount and method
of payment by the Sole Owner of the capital in compliance with the current regulations
(3) The members of the Board of Directors must provide a guarantee for their management in the amount
of not less than three monthly gross remunerations, determined by the Sole Owner of the capital. The
guarantee given is returned after termination of the contract, and following the decision of the Sole Owner
of the Company for discharge from responsibility. When the guarantee was paid in cash, the interests on
the paid amount are subject to refunding as well.
(4) In case of need of business trips, the members of the Board of Directors are sent on а mission abroad
by the Minister of Energy under conditions established by such minister, pursuant to the regulatory
framework in force, and for those in Bulgaria – by the Executive Director (the Executive Directors)
(including if the Executive Director (the Executive Directors) is sent (are sent) on а mission alone at the
expense of the Company. When conducting meetings of the bodies of the Company, the expenses for
holding the meeting and for seconding the members of the Board of Directors, if the venue differs from the
place of residence of a member of the Board of Directors, are borne by the Company.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
12
6.2.6. Statute of the chief (sole) executive member of the Board of Directors.
(1) The Board of Directors entrusts the Executive Director(s) to manage and represent the Company. The
non-executive members of the Board of Directors control the activities of the Executive Director/the
Executive Directors.
(2) The sole Executive Director represents the Company individually and is entitled to perform all activities
and transactions related to the Company’s activities, as well as to draw up and sign documents on behalf of
the Company and to authorize other persons to perform single activities and deals.
(3) The Executive Director organizes the activities of the Company in compliance with the law, the
Company’s Articles of Association, the decisions of the Sole Owner of the Capital, the Policies and the
Decisions of the Board of Directors. He/she undertakes the operational management of the Company
activities, concludes and terminates the employment contracts and other contracts of the employees and
partners of the Company, and is responsible for the accountability and the archives of the Company. The
Executive Director also decides on all other matters which are not of the exclusive competence of the Sole
Owner of the Capital or of the Board of Directors, according to the law or these Articles of Association of
the Company, or as delegated to him/her by a decision of the Sole Owner of the Capital.
(4) The management contract with the Executive Director, a member of the Board of Directors, is signed
by the Chairman or, respectively, by the Deputy Chairman of the Board of Directors. The Executive
Director signs the contracts of the other members of the Board of Directors, unless the representative of the
Sole Owner of the Capital signs these contracts himself/herself.
6.2.7. Representation of BEH EAD
The company shall be represented before third parties by the Executive Director and, where there is more than one,
they shall represent the company in such manner as the Board of Directors may decide.
6.3. Audit Committee
6.3.1. Composition
As of 31.12.2024, the composition of the Audit Committee of BEH EAD, elected with a mandate until 02.02.2027,
according to the protocols of the Minister of Energy, is as follows:
Viktor Andreev Videnov – chairperson – elected by Protocol No.E-РД-21-23 of 08.08.2024.
Vanya Doneva Georgieva – member – re-elected by Protocol No.E-РД-21-5 of 02.02.2024.
Stanislava Plamenova Manolova – member – elected by Protocol No.E-РД-21-30 of 27.09.2024.
6.3.2. Statute
The committee is a specialized, supervisory, consultative body. The Members of the Committee are appointed by the
Minister of Energy of the Republic of Bulgaria in his/her capacity as the Sole Owner of the Capital of BEH EAD upon
suggestion of the Board of Directors of BEH EAD. The committee consists of 3 to 5 members, one of them being a
chairman.
6.3.3. Remuneration
The remuneration of the members of the audit committee is determined by the Minister of Energy and is at the expense
of BEH EAD. By Protocol No.Е-РД-21-7 of 26.02.2021, the Minister of Energy determines the remuneration of the
members of the Audit Committee as follows:
- A member of the Audit Committee receives 80% of the monthly remuneration of a member of the Board of
Directors of the Company.
- The chairman of the Audit Committee receives 85% of the monthly remuneration of a member of the Board
of Directors of the Company.
By Protocol № Е-РД-21-25 of 29.08.2017, the Minister of Energy has approved the Statute of the Audit Committee
of BEH EAD.
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
13
6.3.4. Duties and authority
(1) The Audit Committee carries out its activities in accordance with the requirements of the Independent Financial
Audit and Assurance of Sustainability Reporting Act, Regulation (ЕO) No.537/2014 of the European Parliament and
of the Council of 16 April 2014 on specific requirements regarding statutory audit of public-interest entities and
repealing Commission Decision 2005/909/EC (Regulation (EU) No.537/2014), Directive 2014/56 and Directive
2006/43 of the European Parliament and of the Council and this Statute.
(2) The Committee has the following authority:
- to monitor the financial reporting process and make recommendations or suggestions to ensure its
effectiveness;
- to review and upon a discretion to express opinion on the accounting policy of the holding and its
implementation upon the financial reporting;
- to monitor the effectiveness of the adopted current controls upon the monthly review of the financial
statement of BEH EAD;
- to observe the due and reliable submission of financial information from the subsidiary companies upon
the drawing up of the annual consolidated financial statement of BEH EAD;
- to monitor the effectiveness of the internal control system, of the risk management system and the
activity on internal audit with regard to the financial reporting at BEH EAD;
- to review and express opinion on the risk management strategy, the risk-register of the holding and the
annual report on the condition of the financial management and control system;
- to express opinion on the stature and membership of the internal audit unit and on the strategic and
annual plans for the internal audit activity;
- discusses and adopts the Annual report on the internal audit activity and if necessary, makes itself aware
of and provide opinions on individual audit reports from audit commitments made as well as on all
significant issues, related to the internal audit;
- to be in charge for the procedure on selection of the certified auditor, except for in the cases, when the
audited enterprise has a selection committee and recommends its appointment;
- to verify and monitor the independence of the statutory auditor and to make decisions in the cases
provided by the law, in accordance with the requirements of Chapters 6 and 7 of the Independent
Financial Audit Act, and with Art. 6 of Regulation (EU) No 537/2014, including the advisability of
providing services outside the audit under Art. 5 of the same Regulation;
- to supervise the statutory audit of annual and consolidated financial statements, including its
performance, taking into account the findings and conclusions of the Commission for Public Oversight
on Statutory Auditors regarding the application of Art. 26, para. 6 of Regulation (EU) No 537/2014;
- makes itself aware of the audit strategy and the audit plan of the statutory audit and expresses opinion
on them, by judging the arguments in support of important decisions and a choice made in the stage of
planning;
- to perform monitoring on the implementation of the audit plan by giving recommendations to the
Holding management and the auditors for elimination of difficulties.
- reviews the draft audit reports under Art. 59 and Art. 60 of the Independent Financial Audit and
Assurance of Sustainability Reporting Act and key audit matters identified, the findings made and the
audit opinion expressed, and forms an opinion on the statutory auditor's annual work which includes:
independence of the auditor; objectivity and professional skepticism; composition of the audit team;
findings from audits by the Commission for Public Oversight on Statutory Auditors; communication
and relationships with BEH EAD’s management. The annual opinion is formed on the basis of criteria
adopted by the Audit Committee and communicated in advance with the auditor;
- to discuss the additional auditor’s report (drawn up in accordance with Art. 11, item 2 of Regulation
(ЕU) No.537/2014) and gives recommendations to the management of BEH EAD for removing the
significant weaknesses and failures, found in the report;
- for the purposes of coordinating the relations with the Audit Committees of the subsidiaries of the
Holding, the Committee is entitled, following the approval of the Board of Directors of BEH EAD:
Bulgarian Energy Holding EAD
Consolidated corporate governance statement
31 December 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
14
- to request information from the Audit Committees of the subsidiaries in connection with the
performance of its activities and, if necessary, to inform the Board of Directors of BEH EAD
when it considers that there are facts and circumstances that are relevant for the activity of the
respective subsidiary;
- to carry out investigations within its powers in the respective subsidiaries of BEH EAD after
informing the management of BEH EAD and the management of the respective subsidiary. The
investigations may be carried out at the proposal of any member of the Committee. The decision
to conduct the investigation determines its term and subject, as well as the persons to conduct it.
7. INFORMATION PURSUANT TO ART. 100n, paragraph 8, item 6 of POSA
As a public enterprise, BEH EAD complies with the provisions of the Public Enterprises Act and its bylaws, and does
not implement a deliberate Diversity Policy. The Board of Directors of BEH EAD is appointed by an official decision
of the Minister of Energy after conducting a competition, under the conditions and order provided for in the Rules on
the Implementation of the Public Enterprises Act, according to which the principles of publicity, tra nsparency, free
and loyal competition, equality and proportionality have to be complied with upon conduction of the competition
procedures, and no discrimination should be allowed.
Signed with electronic signature
VALENTIN NIKOLOV
EXECUTIVE DIRECTOR
BULGARIAN ENERGY HOLDING EAD
15.05.2025
City of Sofia
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
0
Consolidated non-financial information
Pursuant to Art. 29, Para. 4 of the Public Enterprises Act
Bulgarian Energy Holding EAD
31 December 2024
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
1
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail .
CONTENTS
1. Brief description of the business model and general information 2
2. Information related to environmental issues 7
3. Information related to social matters 15
4. Issues related to human rights and the fight against corruption and bribery 21
5. Disclosures in connection with Art. 8 of Regulation (EU) 2020/852 establishing a framework to
facilitate sustainable investment and amending Regulation (EU) 2019/2088 (Taxonomy Regulation) 22
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
2
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
This consolidated non-financial information has been prepared in accordance with the requirements of Art. 29, Para.
4 of the Public Enterprises Act and contains a description of the policies of the companies within the Bulgarian Energy
Holding EAD with regard to the activities carried out in the field of ecology, social issues and those related to
employees, human rights and the fight against corruption.
1. Brief description of the business model and general information
Bulgarian Energy Holding Group (BEH) EAD includes companies operating in production and transmission of
electricity, transmission, transit and storage of natural gas, as well as lignite mining. The Group occupies a leading
position in the natural gas and electricity market in Bulgaria. The Group owns the main electricity generation
companies in the country, as well as the electricity transmission network and the natural gas transmission and transit
networks. The Group is also the public supplier of both electricity and gas in Bulgaria and is therefore a strategically
important state-owned company.
Holding structure
BEH EAD (parent company) and its subsidiaries form an economic group. The holding structure is presented in the
chart below:
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
3
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Main activities. Mission and goals
BEH EAD and the companies within BEH Group carry out their operations in compliance with the Bulgarian and
European legislation and in accordance with the licenses issued to them by the Energy and Water Regulatory
Commission (EWRC) and the Nuclear Regulatory Agency.
Brief description of the main activities Mission and goals
Bulgarian Energy Holding EAD operates as a
financial holding company with the companies
within its structure retaining their operational
independence.
The services provided to the subsidiaries are in the
areas of financial management, project management,
corporate governance and business planning, legal
and regulatory issues, public relations and
communication. These activities ensure the
application of a unified approach within the group
regarding the future development of the energy
companies, which is in line with the directions set out
in the Energy Strategy of Bulgaria.
The goals of Bulgarian Energy Holding EAD are focused
on the following main areas and priority areas:
• Financial sustainability of BEH Group and the
electricity sector in the country through:
⁻ Providing funding for key activities and projects;
⁻ Cost optimization at BEH Group;
⁻ Deficits elimination at BEH Group;
• Ensuring the security of the energy system through
project management for:
⁻ Diversification of sources and routes;
⁻ Security, reliability and continuity of gas supplies;
⁻ Investments for the nuclear energy development
and diversification of supplies of fresh nuclear fuel
(FNF);
⁻ Extending the life of the capacities guaranteeing
the security of the system, coupled with ensuring
long-term profitability;
⁻ Regional and European connectivity of the
systems
NPP Kozloduy EAD is the only nuclear power plant
in Bulgaria and the largest manufacturer of electricity
in the country, providing more than one third of the
national annual electricity production. The subject of
a company's activity also includes:
• heat generation;
• import and export of unused and spent
nuclear fuel;
• operation of a radioactive waste
management facility.
The mission of NPP Kozloduy EAD is to supply the
country and the region with energy in a reliable way with
safe, efficient and environmentally friendly production at a
reasonably low price.
The vision of the management of NPP Kozloduy EAD is to
continue to be a safe and secure nuclear power plant in the
long-term, to produce electricity with care for the
environment and to achieve a reasonable balance between
quantity, quality and prices.
The goal of the management of NPP Kozloduy EAD is safe,
efficient and environmentally friendly long-term energy
production with guaranteed quality and security of supply,
in accordance with national and international standards.
TPP Maritsa East 2 (TPP ME2) EAD is a basic
condensing plant with an installed capacity of 1,620
MW, located in Maritsa East Energy Complex. The
plant is a production source of strategic importance
for the country. It is a key element in the Bulgarian
The mission of TPP Maritsa East 2 is aimed at achieving
the following strategic goals:
• Increasing the security of energy supply;
• Strengthening the company position in the regional and
European markets;
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
4
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Brief description of the main activities Mission and goals
energy system, providing the main load for
consumption and regulating energy in the system for
securing the supplies for the power system.
• Increasing the investment attractiveness of the
Bulgarian energy sector;
Operational goals:
• Continuous enhancement of the environmental status of
the plant, the region and the country;
• Transparency and good management practices;
• Sustainable financial situation;
• Pursuance of a balanced investment policy;
• Enhancement of human resource quality.
The main activity of Natsionalna Elektricheska
Kompania (NEK) EAD is production and trading of
electric energy on the free and regulated market NEK
EAD owns and operates 31 hydropower plants
(HPPs) and pumped storage hydro power plants
(PSHPPs) with a total installed capacity of 2,737
MW in turbine mode and 937 MW in pumping mode.
Natsionalna Elektricheska Kompania EAD is a
public supplier of electricity and as such occupies a
key position in the regulated market in the country.
In the field of power supply and trade, Natsionalna
Elektricheska Kompania EAD considers the following as
its commitment and responsibility:
• To provide the required quantities of electricity for the
customers of the end suppliers in the regulated electricity
market;
• To fulfill its obligations for providing public interest
services;
• To be a competitive participant in the power trade in the
free market in the country and the region;
The strategic goals of NEK EAD include:
• Expansion of the company's market positions in the
domestic and foreign markets;
• Development of the business portfolio, ensuring
sustainability and competitiveness;
• Maintenance and development of the company
hydroelectric plants and hydro engineering facilities in
order to ensure the security of electricity supplies;
• Development and construction of new RES projects
with a view to support the energy transition to completely
green energy and decarbonization of the economy;
The main activities of Elektroenergien Sistemen
Operator (ESO) EAD include:
• Transmission of electricity through the
electricity transmission network;
• Power System Management (PSM);
• Administration of electricity transactions also on
the balancing energy market;
• Electricity metering;
The company is certified as an Independent Power
Transmission Operator.
Mission and goals:
Continuously increasing the safe and reliable operation of
the Bulgarian power system and optimizing the process of
its management, improving the quality of operation and
maintenance of the transmission network, to achieve
maximum security and economy of electricity supply.
Bulgargaz (BGAZ) EAD is mainly engaged in public
supply of natural gas, as well as its related purchases
and sales, purchase of natural gas for the purpose of
As a public supplier of natural gas, Bulgargaz EAD has as
its main strategic goal to guarantee the interests of the
public by providing long-term supplies of natural gas to the
country.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
5
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Brief description of the main activities Mission and goals
its storage in a gas storage facility, marketing
research and analysis of the natural gas market.
Bulgartransgaz (BTG) EAD is a combined gas
operator performing natural gas transmission and
storage activities; maintenance and development of
the objects and facilities of the gas transmission
system and the Chiren Underground Gas Storage.
The mission of Bulgartransgaz EAD, as a combined gas
operator holding licenses for transmission and storage of
natural gas, is to ensure these activities following the
interests of the state and society, to ensure conditions for
security and sustainable development of the gas market in
the country and the region, actively help the process of
liberalization in the spirit of pan-European energy policy.
Strategic goals:
• Ensuring the security and reliability of the gas
transmission system and the Chiren Underground Gas
Storage (UGS);
• Development, modernization and expansion of the gas
infrastructure for the transmission and storage of natural
gas in the country and increasing its connectivity with
neighboring gas transmission networks;
• Ensuring the necessary conditions for the establishment
of a competitive, efficient, liberalized and integrated gas
market, in accordance with the requirements of the
European legislation.
The main activity of Mini Maritsa Iztok (MMI) EAD
includes extraction and sale of lignite coal through
the development and operation of three open pit
mines - "Troyanovo-1", "Troyanovo-sever" and
"Troyanovo-3". Another significant activity carried
out by the company is transportation and disposal of
technological waste from TPP Maritsa East 2 EAD
and Contour Global Maritsa Iztok 3 AD;
Company strategy:
• Introduction of high-tech equipment and automation;
• Development and implementation of high-tech mining
solutions;
• Professional development of personnel at all levels;
• Ensuring the operational, repair and investment
activities of the company in accordance with the annual
engineering project for the development of mining
works;
• Subsequent implementation of measures to restore
disturbed areas and prepare for new economic activities
in the company, based on the conclusions in the Report
of the Energy Transition Commission where the final
date for the gradual cessation of the use of coal is
31.12.2038;
• Undertaking actions to preserve the energy profile of
the region, through investments in the field of clean
technologies, low-emission productions and scientific
research and development activities, using the potential
of the available infrastructure, human capital and land.
• Project development and adaptation to programs to
attract funding using external sources such as the Just
Transition Fund, the Modernization Fund, the Cohesion
Fund and the Social Climate Fund.
The main goal of Mini Maritsa Iztok EAD is to ensure the
smooth and secure supply of lignite coal to the thermal
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
6
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Brief description of the main activities Mission and goals
power plants in the region, and respectively to fully meet
their needs.
The main activity of National Energy Operator
(NEO) /) / (Natsionalen Energien Operator) EAD is
to develop and implement projects for the
construction and subsequent operation of systems for
the storage and/or utilization of electricity generated
from renewable energy sources, while in parallel the
Company will provide and contribute to maintain
balance of the national electricity system.
The main objective of National Energy Operator EAD is to
build and manage facilities for the production and storage
of green electricity.
The main activity of Minproekt (Minproekt) EAD is
related to investment design, feasibility studies and
the provision of consulting services.
The mission of Minproekt EAD is the design of structure-
determining energy and mining, civil and industrial objects
of international and national importance.
Management bodies
The sole owner of the capital of BEH EAD is the Republic of Bulgaria and the rights of a sole owner are exercised by
the Minister of Energy who has the capacity of a principal and is authorized to make all decisions in the competence
of the sole owner of the capital according to the law and the statute of the Company. The company is managed through
a one-tier management system. The management bodies are the sole owner of the capital in its capacity of General
Assembly – the Minister of Energy of the Republic of Bulgaria and the Board of Directors.
The subsidiaries NPP EAD, BGAZ EAD, MMI EAD, NEK EAD, TPP ME2 EAD, NEO EAD, Minproekt EAD of
BEH EAD are managed through a one-tier management system. The management bodies of the companies are the
sole owner of the capital - BEH EAD, which decides upon the issues within the competence of the General Meeting
and the Board of Directors of the respective company.
The management bodies of the subsidiaries of BEH Group – ESO EAD and BTG EAD, in their capacity of
independent transmission operators, include the Supervisory Board and the Management Board. The rights of the sole
owner of the capital of the companies are exercised by the Board of Directors of BEH EAD.
Detailed information is published in the Annual Consolidated Management Report of Bulgarian Energy Holding EAD
for 2024.
Rating in terms of the Environmental, Social and Governance Criteria (ESG rating)
For a public company that is actively involved in fundraising through the capital markets, such as BEH EAD, to attract
investors’ interest means to strictly adhere to social, governance and environmental criteria pertinent to the business
that the Holding carries out. The ESG rating is issued after an in-depth analysis of a company’s rules and policies
related to the environmental, social, and governance aspects of its business. After assessing the overall impact and the
environmental impact of the company when carrying out its business activities, as well as after a thorough review of
the available public information on the corporate website, articles, and news about the company.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
7
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
As of 31 December 2024, BEH Group’s ESG rating as determined by Sustainalytics is 35.5 points (“high risk”). The
rating was awarded by Sustainalytics — a company within the Morningstar structure that is a world-renowned provider
of ESG research, ratings, and data. The corporate ESG assessment provided for BEH EAD is one-time assessment,
valid at the moment of its delivery and has been provided based on information made available by BEH EAD. The
report for the ESG risk assessment includes an overall ESG risk rating, an assessment of the Company exposure and
an assessment of its management. Exposure refers to the extent to which the Company is exposed to various material
risks related to environmental, social, and governance aspects. The governance assessment shows how well the
Company manages these aspects. BEH has been assigned an exposure score of 53.8 (“medium risk”), whereas the
management score is 36.8 (“average performance”).
The rating has been published on the websites of Sustainalytics and BEH EAD.
2. Information related to environmental issues
As a socially responsible structure, the protection of human health and the protection of the environment from adverse
impacts, are key priorities for the Group. BEH EAD and the companies within BEH Group strictly observe the
environmental standards and the applicable legislation in this field, both within the country and in the EU.
Environmental protection policies have been developed, aimed mainly at achieving the goals for protection of the
atmosphere and the air cleanliness, safe management, minimization and recovery of waste, energy efficiency and
assessment of the impact of raw materials on the environment, minimizing the risk of environmental damage and
accidents.
All safety standards in the operation of production facilities are strictly observed, constant, systematic and
comprehensive control over the activities, products and services that have a detrimental impact on the environment
and human health is exercised, the best available techniques are applied and introduced.
Environmental protection systems, policies and rules.
Bulgarian Energy Holding EAD
Bulgarian Energy Holding EAD operates as a financial holding company and its activity does not imply violation of
the environmental norms and the applicable legislation, both within the country and in the EU. The specifics of the
company’s operation are such that its activities do not endanger the protection of the environment in any way.
NPP Kozloduy EAD
Environmental management is a process which forms part of the NPP Integrated Management System (IMS). Aspects
management of the nuclear power plant impact on the environment covers the entire site and all structural units
included in the organizational and management structure. It is carried out according to the requirem ents of the
international and Bulgarian standard BDS EN ISO 14001:2015.
To manage the significant aspects and comply with the regulatory requirements, as well as the requirements and
conditions of the permits and licenses issued to the NPP, programs are developed, the implementation of the activities
of which is controlled and reported.
The environmental policy is aimed at achieving the following objectives:
• Protection of the atmosphere and the purity of the atmospheric air.
• Reduction of the impact that the company’s business exerts on the water quality.
• Safe management and minimization of waste.
• Optimized use of raw and other materials.
• Reduction of emissions into the environment.
• Enhancement of energy efficiency.
• Minimization of the risk of environmental damage and accidents.
• Maintaining compliance of the Quality Management System with the requirements of GSR Part 2 –
Leadership and Management for Safety, BDS EN ISO 14001:2015, and the applicable legal, regulatory and
stakeholder-adopted requirements.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
8
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Environmental protection in the area of the NPP is based upon the following principles:
• Efforts to minimize the impact that the company business exerts on environment.
• Leadership and personnel engagement.
• Contamination prevention.
• Strict compliance with the instructions of the competent environmental authorities.
• Substantiated decision-making based on risk and opportunity assessment.
• Interaction with control authorities, local authorities, the public and other stakeholders on issues related to
environmental protection.
The implementation of the regulatory and other environmental requirements concerning the non-radiation monitoring
at the NPP is organized and controlled by designated structural units. The infrastructure related to environmental
protection includes facilities and means for:
• Maintenance of equipment, systems and apparatus that contain fluorinated greenhouse gases (FGG);
• Drainage, treatment, discharge and monitoring of wastewater;
• Collection, transportation, storage and disposal of non-radioactive waste;
• Safe storage and use of hazardous chemicals and mixtures, etc.
The condition of the environmental infrastructure is monitored during patrols, inspections and audits by responsible
officials, according to the internal company documents. The results are reported to the NPP Management and are taken
into account in the planning and organization of the activities.
The main competent environmental authorities with which the NPP maintains communications are the Ministry of
Environment and Water (MoEW), the Regional Inspectorate of Environment and Water (RIEW) - Vratsa, the Danube
Region Basin Directorate (BDR) - Pleven and the Executive Agency on Environment and Water (EAEW).
The management conducts annual reviews of IMS, and the results include a conclusion on the effectiveness of IMS,
including SLD, and decisions related to any need for changes in the policy, environmental objectives, resources and
activities, as well as opportunities for improvement.
The obligatory internal non-radiation monitoring of water in the NPP Kozloduy area, arising from water use and
discharge permits issued to the Company, includes:
• Measuring and reporting of the quantity of water used from the river Danube;
• Measuring of the quantity of waste water (by individual streams) and the concentration of the pollutants in
them, for which there are certain individual emission limitations in the permits;
• Measuring of the amount of groundwater extracted;
• Monitoring of water levels and chemical status of groundwater bodies used for water extraction;
• Monitoring of water levels and chemical status of groundwater on the industrial site, etc.
The non-radiation monitoring of water in NPP Kozloduy EAD is performed by the Testing Laboratory (TL) with the
Engineering Chemistry (EC) Sector, Quality Assurance Department. TLQ-EC is accredited according to BDS EN ISO
/ IEC 17025 by EA BAS under reg. No . 172 ЛИ. The management system (MS) of TLQ -EC is subject to annual
reviews by the management, internal audits and planned supervision by the Bulgarian Accreditation Service (BAS).
Environmental radiation monitoring of NPP Kozloduy EAD is carried out in compliance with the relevant national
statutory regulations (Bulgarian Nuclear Regulatory Agency, Ministry of Environment and Water, Ministry of Health)
and the guidelines of the EU and the International Atomic Energy Agency. The scope thereof and the arrangements
pertinent to its implementation are regulated by a long-term program developed in alignment with the BNRA, the
Ministry of Environment and Water, and the Ministry of Health. The main activities related to own radiation
monitoring of the environment and site of NPP Kozloduy include:
• Ensuring the conduct of reliable and safe environmental monitoring during the operation of the NPP, which
covers the following zones: the zone of the NPP’s industrial site, the surroundings thereof which fall within
a 2 km Precautionary Action Zone (PAZ), the checkpoints within a 30 km Urgent Action Zone (UAZ), the
reference points in the towns or Lom, Pleven and Berkovitsa and the routes thereto.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
9
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
• Control of the radiation status within the industrial zone and compliance with the rules and regulations on
radiation safety when handling radioactive materials. Control of the collection, transport and storage of all
kinds of radioactive waste. Control of the radioactive contamination of vehicles and materials that are
removed from the industrial site zone.
• Monitoring the equivalent gamma-radiation dose rate; the radioactivity of ambient air, soil, water, vegetation,
etc. environmental components; radioactivity of foodstuffs and agricultural products produced around the
town of Kozloduy.
• Model assessments of additional dose loads of the population within the 30 km UAZ as a result of the liquid
and gaseous waste from NPP Kozloduy.
• Maintenance of emergency preparedness through field measurements and radiation scanning with the use of
a mobile laboratory for environmental radiation monitoring.
• Recording and official operational reporting of results to the national competent authorities and the IAEA
(the ALMERA network).
Environmental radiation monitoring is carried out with the use of the resources of a designated unit at NPP Kozloduy
EAD. The radio-ecological monitoring at NPP Kozloduy EAD is performed by the Testing Laboratory of the Radio -
Ecological Monitoring (TL-REM) department, Safety Unit. TL-REM is accredited according to BDS EN ISO / IEC
17025 by EA BAS under reg. No. 154 ЛИ. The management system (MS) of TL -REM is subject to annual reviews
by the management, internal audits and planned supervision by the Bulgarian Accreditation Service (BAS).
TPP Maritsa East 2 EAD
The company has a built and constantly improving Environmental Management System (EMS) certified according to
the international standard ISO 14001:2015 by the authorized body TÜV Rheinland Cert GmbH with the field of
application ‘Production and sale of electrical energy, provision of availability, additional frequency and exchange
power regulation services, balancing energy and voltage regulation’.
The policy of TPP Maritsa East 2 EAD aims at curbing the detrimental impact on environmental components by
controlling the effects that it exerts thereon when conducting its principal business: power production and supply.
The main objective is to maintain and continuously improve the EMS in compliance with the requirements of EN ISO
14001, through: observing the applicable national and Community law in the field of environment; ensuring the
monitoring, measurement, analysis and assessment of the status of environmental components; ensuring transparency
of results; staff being trained in and motivated to actively engage in policy implementation.
In November 2024, the first supervisory audit to demonstrate compliance with the requirements of the ISO 14001:2015
standard was successfully completed. During the audit, no non-compliances were found and no recommendations for
improvement were given. Full compliance of the constructed Environmental Management System (EMS) with the
requirements of the EN ISO 14001:2015 standard has been reported. The management system is effective and ensures
that the organization may expect to achieve the goals it has set. As a result, a new certificate was issued with validity
from 02.03.2024 to 02.02.2027.
Comprehensive pollution prevention and control rules are followed by adhering to Integrated Permit No. 50/2005,
which includes rules on admissible emission levels based on the best techniques available aiming to prevent and
control emissions into the atmosphere, water and soil, waste management, energy efficiency and accident prevention.
Decision No. РР-4914/23.01.2023 extended the validity period of permit No. 31430010 (previous No.
0560)/28.09.2001, last extended by Decision No. РР -1366/14.11.2011, for water abstraction from a surface water
body, issued by the Minister of Environment and Water, continued by the Director of the East Aegean River Basin
Directorate (EARBD).
To prevent major accidents involving hazardous substances and to mitigate the effects thereof on human life and
health, and the environment, a classification has been made of the chemicals used and an updated Safety Report has
been approved by virtue of Resolution No. 60-А2/2019 of the executive director of the Executive Environment
Agency. An emergency plan and a safety management system are maintained.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
10
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
On 07.02.2024, in pursuance of the resulting obligations within the meaning of Art. 116f, para. 1 of the Environmental
Protection Act, a working group, formed by Order No. РД -17-145/25.01.2024 of the ED, was reviewed and approved
by the Decision No. 60-A2/2019. Safety report, including Major Accident Prevention Policy (MAPP) Report and
Safety Management System (SMS).
The policies and measures aimed at mitigating the effects of climate change are implemented by joining the EU
Emissions Trading System (EU ETS) targeted towards reduction of greenhouse gas emissions. The company holds
permit No.46-Н2/2020 and monitors and reports greenhouse gas emissions.
The main pollutants emitted into the atmosphere as a result of the combustion of East Maritsa lignite coal by MMI
EAD, characterized by a high content of moisture, ash and sulfur from the steam generators of TPP ME 2 EAD include:
sulfur dioxide, nitrogen oxides, carbon dioxide, carbon monoxide and dust.
By a Decision No. 46-H2-A2/2023 of the Executive Agency on Environment and Water (EAEW), the greenhouse gas
emission permit (GHGEP) No. 40-H2/2020 of TPP Maritsa East 2 EAD has been updated in accordance with the
requirements of Article 74 of Regulation (EU) No. 2018/6066, regarding the monitoring and reporting of greenhouse
gas emissions, and a new version has been published as of 15.02.2021 of the Monitoring Plan.
Natsionalna Elektricheska Kompania EAD
NEK EAD has a certified "Integrated system for the management of quality, environment and health and safety at
work" with the following scope "Construction and commissioning of HPP, PSHPP and HEP. Management of HEP.
Production of electricity in HPP and PSHPP. Public supply of electricity. Power trading and coordination of a standard
balancing group. Power supply from a supplier of a last resort and coordinator of a special balancing group.
Decommissioning of HEP, HPP and PSHPP". In the environmental part, T ÜV Rheinland Bulgaria OOD is issued a
certificate No. TRBA 110 0178 for compliance with the BDS EN ISO 14001:2015 standard with a validity period of
15.11.2025. The NEK’s policy is aimed at achieving and maintaining full compliance with the applicable regu latory
and other environmental requirements, reduction of risks and prevention of incidents related to the environment, as
well as reduction of the consequences of environmental impacts. The activities in the Company are carried out in strict
compliance with the internal instructions and rules regarding the environment. The company has published a
Declaration of the policy on Quality, DC, Biological Diversity Act (BDA) on its website.
Internal documents ensuring environmental protection include the following:
• Instruction for determining the environmental aspects.
• Work program for objectives about quality, environment and health and safety at work and measures to
achieve them.
• Program of NEK EAD for long-term environmental measures
• Methodology. Risk assessment at NEK EAD.
Instruction. Compliance assessment.
• Rules. Non-compliance management.
• Instruction. Safe storage and use of hazardous chemicals and mixtures.
• Instruction for administration of permits, according to the Water Act.
• Instruction on the procedure for carrying out waste management activities at NEK EAD.
• Emergency instruction and measures to reduce and prevent the consequences for the environment in case of
disasters, accidents and catastrophes, etc. at the facilities on the HPP Enterprise’s territory.
• Emergency instruction and ‘Measures for reduction and prevention of the consequences for the environment
in case of disasters, accidents, catastrophes etc. at the facilities on the territory of ‘Dams and cascades’
Enterprise.
• Instruction. Measures for reduction and prevention of the consequences for the environment in case of
disasters, accidents and other events in the headquarters.
• Plans for internal water monitoring in the PSHPP.
Electricity System Operator EAD
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
11
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In 2024, ESO EAD continued to implement an environmental policy aimed at reducing the consequences of
environmental impacts as a result of its operations. The company operates in strict compliance with environmental
requirements in accordance with Bulgarian legislation and in accordance with Directive 75/439/EEC as of 16.06.1975
on the disposal of waste oils.
• Activities involving treatment of waste oils and waste oil products
In fulfillment of the Ordinance on waste oils and waste oil products, adopted by Decision No. 352/27.12.2012 of the
Council of Ministers (promulgated SG, issue 2/08.01.2013) and on the grounds of Art. 3, para 1 of the same Ordinance
any used oils that result from the technological processes in the system of ESO EAD are primarily utilized through
reclamation at a transformer oil reclamation facility in the area of MED Plovdiv. Reclamation is carried out through
a technological line for the treatment of critically polluted oils by a sedimentation-absorption method using bleaching
earth for transformer oils. In this type of technological treatment, spent bleaching earth is treated as hazardous waste.
By virtue of Art. 7. (1) and Art. 8 (1) of the WMA, the waste is handed over for collection, transportation and treatment
to persons who have the right to carry out these activities in accordance with this act.
To minimize the amount of released waste, ESO EAD has invested significant resources and procured an innovative
computerized plant for the processing of low and medium contaminated transformer oils. The specialized percolation
treatment plant uses a granular adsorbent, which can be made to undergo repeated recovery /over 300 work cycles/,
during which operation practically no dangerous waste is generated.
By virtue of Art. 6, Art. 7 and Art. 8 of the Waste Management Act (WMA), (SG, issue No. 53/13.07.2012), as well
as in connection with Art. 35, the holders of waste shall be obliged to provide the necessary financial means for the
fulfillment of their obligations, specified in this act.
• Maintaining of an energy management system for the management of the final power consumption by
operational and maintenance activities at facilities - substations owned by ESO EAD.
The aim is to maintain the developed, documented and implemented energy management system, recertification,
according to the requirements of ISO 50001:2018.
ESO EAD continues to fulfill the requirements and maintain the implemented energy management system. In October
2024, a recertification audit was conducted in accordance with the system requirements. No inconsistencies were
found and ESO EAD successfully passed the audit of an implemented energy management system, according to the
requirements of ISO 50001:2018.
• Performing activities for modernization or replacement of energy facilities containing environmentally
hazardous components with facilities of a new type, which do not contain such components.
The company performs activities for modernization or replacement of energy facilities containing environmentally
hazardous components with facilities of a new type, which do not contain such components. These activities include:
1. Gradual replacement of oil-filled circuit breakers;
2. Continuation of the policy of installation and commissioning of new high-efficiency LED lighting
in the facilities;
3. Upgrading the existing and constructing new oil collection pits at the sites where no such facilities
have been provided so far.
ESO EAD continues its targeted implementation of its policy on the modernization or replacement of energy
equipment containing environmentally hazardous components with equipment of a new type. In 2024, during the
reconstruction and refurbishing of electri cal equipment in the company’s substations, 40 oil -filled circuit breakers
were replaced. At the same time, 12 new oil collection sewers and pits with the installation of highly efficient mud/oil
traps (catchers) were built.
The implementation of the policy on installation and commissioning of new high-efficiency lighting fixtures in the
facilities continues, with lighting based on new energy-saving LED lighting fixtures installed in 237 facilities.
• Practices for limiting the environmental impact of polluting substances resulting from the disposal and/or use
and decommissioning of products and services.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
12
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
1. Organization of the fulfillment of the requirements of the Clean Air Act was organized, the requirements
of Regulation (EC) No. 1005/2009 on substances that deplete the ozone layer and Regulation (EU) No.
517/2014 on fluorinated greenhouse gases and associated regulations, as well as any regulations thereto.
Annual reports are prepared in accordance with the Annexes to the Regulations implementing Regulation
(EC) No. 1005/2009 and Regulation (EU) No. 517/2014;
2. Coordinating the implementation of the requirements of Ordinance No. 1 of 17 February 2017 was
organized on the procedure and method of training and issuing documents for qualification of persons
performing activities involving equipment containing fluorine-containing greenhouse gases, as well as on the
documentation and reporting of fluorine-containing emissions greenhouse gases, issued by the Minister of
Environment and Water and the Minister of Interior - promulgated, SG, issue No. 20 of 7 March 2017,
effective 07.03.2017.
Bulgargaz EAD
Bulgargaz EAD, as a public supplier of natural gas, does not carry out production activities and does not have any
production sites exerting an impact on the environment. The company does not own any infrastructure sites (linear
and on-site), while only using services related to the operation of the same, provided to it by the operator of these sites
– Bulgartransgaz EAD. Bulgargaz EAD carries out only commercial activities - purchase of natural gas for the purpose
of its sale to customers.
Bulgartransgaz EAD
Bulgartransgaz EAD has developed a high culture in the field of environmental protection, in all activities and at all
levels in the Company’s structure. The main rule is to avoid any accidents or negative impacts on the environment by
adopting an environmentally friendly behavior in compliance with regulatory requirements. To fulfill the
commitments aimed at ensuring environmental protection, the following activities related to the company's
environmental policy are performed:
• Ensuring the necessary actions to maintain the environmental management system in accordance with the
regulatory requirements of environmental legislation and all other compliance obligations. The company has
developed, implemented and certified an environmental management system (EMS), which is in full
conformity with the requirements of ISO 14001:2015 “Environmental management systems”. In 2022,
Bulgartransgaz EAD successfully passed the recertification audit according to the requirements of the
standard in connection with the operation of the EMS, which was performed by TÜV NORD Bulgaria
EOOD;
• The company applies the best available techniques in the installations with effective complex permits - the
Lozenets, Strandzha, Rasovo and Nova Provadia compressor stations with installed low-emission gas turbine
compressor units, as well as in the Ihtiman and Petrich installations with revoked complex permits. Low-
emission gas turbine equipment is to be installed at the Chiren UGS, which also has a valid complex permit.
• The Company implements plans and programs to reduce and prevent environmental pollution. The annual
program for investments and maintenance of Bulgartransgaz EAD includes events for which the necessary
funds are provided for the implementation of activities to bring operational areas into compliance with
environmental regulations.
• The policy is implemented to prevent and control the risk of major accidents and limit their consequences
through a safety measures management system. In 2022, an updated Safety Report of the Chiren UGS for the
operation of an enterprise with a high risk potential, necessary for the expansion and modernization of the
above-ground part of the gas storage facility, was updated and approved by the competent authorities.
Organizational and technical measures for the prevention and control of accidents and an em ergency plan
have been developed for all site and linear parts of the company's gas transmission system. The necessary
organization has been created and maintained for the implementation of the measures/plan, as well as for
updating them, if necessary.
• Improving the qualification of the employees in relation to the issues of the environmental protection,
according to the existing personnel training program.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
13
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
• Monitoring of key environmental parameters that exert significant environmental impact – in accordance
with set monitoring plans, which include monitoring of the greenhouse emissions into the atmosphere,
monitoring of waters, noise level, soils etc. Assess compliance with applicable regulatory requirements;
• Efficient management of the waste generated by the production activity, according to the regulatory
requirements. Preparation of plans for construction waste management when the company is involved in
investment activities related to construction;
• Maintaining communication with control bodies and all stakeholders in resolving environmental protection
issues related to applicable environmental legislation;
• Continuous improvement of the environmental management system in order to increase its effectiveness in
relation to environmental protection.
Mini Maritsa Iztok EAD
Mini Maritsa Iztok EAD is certified under ISO 14001:2015 - an international standard that defines the requirements
for the environmental management systems. It allows the organization to develop and implement policies, common
goals, instructions, regulations and programs, taking into account the legal and other requirements that the organization
should comply with towards minimizing the impact of significant aspects on the environment.
The following is achieved through the environmental management system, which forms part of the IMS:
• Supporting and improving the environmental management and performance;
• Assisting the achievement of compliance with the regulatory obligations for environmental management;
• Improving the image of the organization;
• Environmentally-friendly waste management across the Company.
Written documents for managing the activities related to the environment area have been approved and are being
applied, and the company policy in this area is set out in the general Statement by the Management and forms part of
the general policy of the Company.
All waste is treated according to the “Program for waste management activities on the territory of Mini Maritsa Iztok
EAD for the period 2021-2026”, as endorsed by the Executive Director of the Company.
Mini Maritsa Iztok EAD owns two Complex Permits (CP): No. 398-Н0/2010, updated with Decision No. 398-НО-
ИО-А1-ТГ1/2022 and No. 403-НО/2О1О respectively. They have the status of landfills for non-hazardous waste due
to the fact that they are used for the mixed disposal of overburden from mining activities and production non-hazardous
waste from TPP Maritsa East 2 EAD and Contour Global Maritsa Iztok 3 AD. The permits are in compliance with
Directive 2008/1/EU for complex prevention and control of pollution transposed in chapter seven of the Environmental
Protection Act.
Landfill for non-hazardous waste "Obedineni Severni Nasipishta”: For the period 01.01.2024 - 31.12.2024, 1,434,317
tons of waste from the TPP Maritsa East 2 EAD (slag ash and gypsum from slag dump) and 3,387,130 tons of
overburden were dumped in the landfill “Obedineni Severni Nasipishta” through Overburden Transport Embankment
Complex 3 (OTEC 3) of Troyanovo-1 Mine. The waste:overburden ratio is 23.3 %, which fulfills the requirement that
the amount of waste does not exceed 25% of the total deposited materials.
Landfill for non-hazardous waste “Nasipishte Mednikarovo”: In the reporting period, 216,738 tons of waste from
Contour Global Maritsa East 3 AD and 1,521,520 tons of overburden were dumped through OTEC 5 of Troyanovo -3
mine at the landfill “Nasipishte Mednikarovo”. The waste:overburden ratio is 12.5 %, which fulfills the requirement
that the amount of waste does not exceed 15% of the total deposited materials.
As of 21.02.2024, no landfilling of non-hazardous waste generated by the activities of TPP Contour Global Maritsa
East 3 AD is carried out on the territory of the landfill for non-hazardous waste “Nasipishte Mednikarovo”.
For the reporting period, the foreseen measures for the prevention, limitation and minimization of unorganized dust
emissions from the activities of the landfills are applied. In dry weather with high temperatures and wind, the transport
roads are sprinkled with sprinkler equipment. In the spring of 2024, an accredited laboratory carried out monitoring
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
14
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
of the groundwater in order to control and prevent the contamination of the water bodies of the surface/rain/water and
of the underground water from the landfills. Surface water monitoring was carried out in June and December 2024.
During the four internal inspections carried out during the reporting period of 2024, no violations related to waste
management activities were found. During the reporting period, no spills or other accidents related to immediate
danger to people and the environment occurred during the activities of the landfills.
Monitoring of environmental indicators and resources used in the production process.
The following results have been reported regarding the BEH Group companies producing electricity:
Indicators for NPP Kozloduy EAD Unit Amount
Radiation indicators:
RBG activity in discharges ТBq 0.71
JA activity in discharges МBq 3.96
I-131 activity in discharges МBq 16.2
Unbalanced water activity (without tritium) МВq 50.7
Emitted pollutants in the atmospheric air:
СО 2 t 442
Resources used:
Water resources, of which:
Cooling water (the river Danube) m 3 2,586,232,014
Water for CPW production (the river Danube) m 3 1,298,500
Drinking water (WSS) m 3 220,601
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
15
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Indicators for TPP Maritsa East 2 EAD Unit Amount
Emissions into the environment:
СО 2 t CO 2 e 5,091,214
SO 2 t/y 9,970.342
NOx t/y 3,303.952
Particulates t/y 111.323
Resources used:
Lignite coal t/y 7,163,246.800
Water resources m 3 /y 556,780,000
Electricity for internal needs MWh 725,148.249
Indicators for Natsionalna Elektricheska Kompania EAD Unit Amount
Resources used:
Water resources m 3 4,307,065,914
Electricity MWh 10,544.225
3. Information related to social matters
Human Resource Management (HRM) at BEH Group is defined as a strategic approach for managing the most
valuable resource of the Group - the people who achieve the goals and provide a sustainable competitive advantage
through their ability to create uniqueness and value.
Social responsibility to employees
BEH Group invests in its employees in the belief that they are its most valuable asset. As a responsible employer, the
Group follows certain principles of workplace relations:
• No discrimination in the workplace;
• Ensuring occupational health and safety;
• Providing development opportunities based on gender and age equality;
• Ensuring the right of association and labor protection of employees.
Human resources management plays a leading role in the successful implementation of the goals and priorities of the
corporate strategy of BEH EAD. With regard to human resources management, BEH EAD applies the Human
Resources Management Policy (the Policy) implemented in the Group. The policy regulates the general framework
for the human resources management processes, while at the same time enabling the companies within the holding
structure to apply the established approach, taking account of the specifics of the companies and the existing applicable
regulations. Internal code of conduct at work and internal renumeration rules have been developed.
BEH Group strives to select the most suitable employees, organize their training and motivate them thus offering them
opportunities for development in order for them to effectively perform the work. To achieve all this, the company
maintains a working environment and working conditions which guarantee job security, good remuneration, in line
with achieved results, opportunities for training and development and, above all, good working relationships.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
16
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
BEH Group does not tolerate any form of discrimination based on sex, race, nationality, ethnicity, citizenship, origin,
religion or belief, education, convictions, political affiliation, disability, age, property status, or other criteria. Equal
rights and opportunities for work, development and career growth are provided based solely on the professional
qualification, acquired experience, personal qualities and achieved work results.
The main areas of corporate social responsibility of the companies within the Group are focused on transparent
corporate governance, sustainable development and guaranteed quality and safety of employees. The companies
within the Group cooperate with and are members of various organizations thus supporting the adequate and effective
implementation of the strategy for corporate social responsibility.
Joint initiatives with municipalities and voluntary initiatives have been undertaken as a result of the personal
commitment of employees to ensure lasting benefits for the local community: helping people in need, providing
support for the development of public works, infrastructure and healthcare, as well as in the fields of education,
science, culture and sports. The companies contribute to a number of donation programs.
Personnel allocation
The number of employees in BEH EAD and the companies within the Group, as of the end of 2024, is 19,066. The
allocation of employees by category in the main companies of the holding is as follows:
• according to the national classification of occupations and positions:
BEH NPP TPP NEK ЕSО BGAZ BTG MMI
Managers 26 466 92 143 271 13 77 189
including women 12 118 13 37 30 7 17 2
Specialists 64 1,142 227 419 944 32 90 464
including women 38 520 73 191 291 24 45 164
Technicians and application specialists 2 863 895 403 554 1 235 438
including women 2 210 198 46 58 - 65 145
Assistant administrative staff 6 208 92 91 114 2 37 203
including women 4 181 83 70 69 2 30 179
Staff engaged in services of the
population, trade and security - 90 2 56 1 - 12 60
including women - 40 2 43 - - 9 50
Skilled workers and similar craftsmen - 786 617 378 1,077 - 179 1,859
including women - 75 68 19 8 - 8 105
Machine operators and installers 3 152 210 132 134 3 269 2,570
including women - 31 23 - - - 1 132
Professions not requiring special
qualifications - 106 110 260 91 3 34 575
including women - 75 52 88 62 3 22 76
• according to completed education:
BEH NPP TPP NEK ЕSО BGAZ BTG MMI
Higher education 94 2,410 905 792 1,833 47 518 1,541
including women 51 941 256 297 364 33 153 340
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
17
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
College education 2 - 43 - - - - -
including women 2 - 12 - - - - -
Secondary education 5 1,389 1,256 1,058 1,290 7 414 4,713
including women 3 305 244 193 104 3 44 517
Primary education - 14 35 32 63 - 1 104
including women - 4 9 4 50 - - 14
No education - - 6 - - - - -
including women - - 1 - - - - -
• according to age:
BEH NPP TPP NEK ЕSО BGAZ BTG MMI
Age 18 - 30 years 7 330 86 55 148 4 21 315
including women 2 94 10 9 11 3 6 23
Age 31 - 40 years 24 968 477 331 501 14 136 1,139
including women 14 301 93 79 95 8 37 114
Age 41 - 50 years 41 1,098 841 538 984 17 282 2,091
including women 28 367 185 144 162 13 64 280
Age 51 - 60 years 22 1,264 794 716 1,195 16 397 2,626
including women 11 432 210 232 203 9 82 417
Age over 60 years 7 153 47 242 358 3 97 187
including women 1 56 14 31 47 3 8 37
Health and safety at work
Health and safety at work is the main priority of the holding. Given the specifics of their activities, the companies
within BEH Group purposefully follow a policy of strict compliance with the requirements of the laws and regulations
on health and safety at work in force in the country. In this regard, the main objectives relate to the protection of life,
safety and working capacity of employees in the company, as well as maintaining the health of staff and the public in
carrying out activities related to the use of nuclear energy, eliminating or minimizing existing risks associated with
the production process, adopting and implementing decisions for the implementation of legal, socio-economic,
organizational-technical, sanitary-hygienic and treatment-and-prophylactic measures to ensure safe and healthy
working environment.
The factors of the working environment are regularly measured and the risks for each work activity assessed in order
to successfully eliminate or mitigate the risks for the health and safety of workers.
Each employee receives adequate training in and is briefed on healthy and safe conditions of work in accordance with
the specifics of their position and workplace. The employees of the Group are offered a wide range of social services
related to medical check-ups, proper recreation, rehabilitation and recovery from the work process.
The key component of health and safety at work is prevention – prior implementation of measures pertinent to health
and safety at work to prevent adverse effects, should any hazardous and harmful factors present.
Given the specifics of the activity in NPP Kozloduy EAD, a set of organizational and technical measures for ensuring
a safe working environment have been introduced for the protection of life, safety and working capacity of the
employees. For the safe realization of the labor process, appropriately trained and instructed persons, possessing the
necessary qualification and legal capacity, are admitted to the respective labor activities. Employees are presented
with continuous information through instructions for safe work, examples of good practice, supportive training and
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
18
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
opportunities for professional development. Means of collective protection are provided. The workplaces are designed
in accordance with the ergonomic requirements and the anthropometric characteristics of the workers. All workers are
provided with personal protective equipment depending on the specifics of the workplace, the possible dangers and
risks at work. Constant monitoring and analysis of the health status of employees is ensured, as well as the provision
of emergency care. Preventive medical examinations are organized, as the frequency is determined by the nature of
the work, the working conditions and the age of the employees. Prophylaxis is provided to strengthen the health and
working capacity of workers, as well as preventive care for workers with frequent or chronic illnesses. Reduced
working hours, regulated work and rest regime, as well as free food have been introduced.
An important aspect of ensuring safety at the nuclear power plant is maintaining and increasing the emergency
preparedness of the personnel in accordance with the requirements of national legislation and European and global
standards.
In order to improve and increase the level of emergency preparedness of the personnel, a national full-scale emergency
exercise “Protection 2024” was conducted in 2024 with the participation of teams from the unified rescue system of
the Republic of Bulgaria, the management of the National Headquarters, the Nuclear Regulatory Agency, the
Bulgarian Red Cross, the National Institute of Meteorology and Hydrology, the State Agency for National Security,
“Gendarmerie, Special Operations and Combating Terrorism” and “Fire Safety and Protection of the Population” main
directorates, the regional and district subdivisions of the Ministry of Internal Affairs, Kozloduy and Mizia municipal
administrations, etc. The reactions and actions of the national emergency teams protecting the population in disasters,
accidents and catastrophes were tested in real time. Additionally, in 2024, 6 emergency drills with the Nuclear
Regulatory Agency and the State Enterprise for Radioactive Waste and one general emergency exercise were
conducted.
In 2024, a new version of the internal emergency plan of NPP Kozloduy EAD was put into effect.
Operating as a dedicated unit, responsible for ensuring safety and health at work at TPP ME2 EAD, is the “Department
for safety and health at work” (DSHW). Each newly appointed employee at TPP ME 2 EAD receives training in Safety
and Health at work according to the specifics of their workplace and profession. The officials who manage, control or
are immediately involved in the technical operation of the plants, machinery and equipment are periodically tested for
their awareness of Ordinance No. 9 of 9.06.2004 on the technical operation of power plants and grids, and the HSW
Regulations for non-electrical/electrical installations in power plants.
In order to achieve efficiency in ensuring health and safety at work, the management of TPP Maritsa East 2 EAD has
built its own company policy on health and safety, where the Occupational Health and Safety Management System
takes a leading place. The policy in the field of occupational health and safety is aligned with the business policy of
the enterprise and it is aimed at achieving economic growth, creating high-quality jobs, modernizing social protection
and promoting sustainable development, rethinking working conditions and work organization, with an emphasis on
promoting “well-being at work”. The Company conducts an active social policy regarding occupational conditions,
which is aimed at:
• A comprehensive approach to promoting “well -being at work”;
• Increasing the culture of protection among workers and further development of the prevention system, via:
training and social dialogue;
• Implementation of comprehensive and effective control of compliance with labor legislation;
• Ensuring the necessary quality of training in the field of occupational health and safety;
• Expanding the infrastructure of services for consulting and assisting employers and increasing the quality of
this activity;
• Development of social security systems and insurance activity and their effective inclusion in the activities
to ensure and maintain healthy and safe working conditions in the enterprise.
Achievement of the strategic objectives for health and safety at work announced in the Declaration of the management
of TPP MI 2 EAD for 2024 is ensured by approval of the program for Management of Health and Safety at Work for
2024, which includes a total of 61 measures aimed at:
• Improvement of working conditions, normalization of the parameters of the working environment and
improvement of work hygiene in the work premises;
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
19
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
• Ensuring safety at the workplaces by applying effective means of collective protection;
• Improvement of sanitary and hygienic services.
Consultation and participation of workers and workers’ representatives in the activities to ensure the BDA is ensured
through the functioning of the Working Conditions Committee (WCC), whose activities include:
• Discussing quarterly the overall activity of protecting the health and ensuring the safety of workers and
proposing measures for its improvement;
• Discussing the results of the occupational risk assessment and analyzes of the workers’ health status, the
reports of the occupational medicine service, etc. matters of ensuring and protecting the health and safety of workers
and officers;
• Carrying out checks on compliance with the requirements for OHS;
• Monitoring the state of occupational injuries and occupational morbidity;
• Participation in the development of programs for information and training of workers on the problems of
OHS.
The workers and employees who service the machines and equipment have the necessary qualifications and legal
capacity. Training and upgrading of personnel’s qualifications in occupational safety and health is carried out annually.
Workers are informed about the risks, PPE and the methods of using, storing and checking their proper functioning.
The implementation of written instructions when using work equipment that poses a risk to safety and health is
ensured, which specify the conditions for using the relevant equipment and the requirements for safety and health at
work, as well as the measures taken to eliminate, reduce or evade that risk.
Ensuring safe and healthy conditions of work forms part of the overall concept for the future development of MMI
EAD. The employees of the Company are provided with: special work clothing and personal protective equipment;
free food; refreshing and invigorating drinks for night shift workers; medical staff on round-the-clock duty;
ambulances and first aid materials; measuring the parameters of the working environment by an accredited body;
The policy that the company has adopted and follows in relation to occupational health and safety is the application
of the regulations, the uniform, industrial and internal rules in this area. By controlling the compliance with labor
legislation in the field of occupational health and safety, prevention of work-related accidents, prevention of
occupational risks and compliance with the introduced anti-epidemic measures the management of the Company aims
to safeguard and protect the health of workers.
In 2024, in MMI EAD, town of Radnevo, by orders of the Territorial Division of the National Labor Insurance
Institute, a total of 19 accidents were recorded as occupational, of which 8 accidents were under Art. 55, para. 1. By
location, the accidents occurred in:
• Troyanovo-1 mine - 2;
• Troyanovo-sever mine - 6;
• Troyanovo-3 mine - 11;
• Mini Maritsa Iztok EAD - Management - 0;
In order to limit and minimize occupational injuries in 2024, the actions of the company were aimed at carrying out
enhanced control activities in compliance with the requirements of regulatory documents and internal rules for safety
and health at work and prevention of work-related accidents.
Professional development
The purpose of training for and development of employees is to improve their knowledge, skills and personal qualities,
and to provide opportunities for their development, so that the employees meet the requirements for the position as
fully as possible and adapt to the changing environment external to the company.
Taking into account of the specifics of the operations and in accordance with the international standards and national
requirements, a system for personnel training and qualification has been put in place at NPP Kozloduy EAD which
forms an integral part of the plant’s management system. The Plant has its own instructional and training center (ITC)
providing conditions for specialized training and featuring a full-scale simulator for units equipped with ВВЕР-1000
reactors. The Company conducts mandatory initial and supportive specialized training in activities taking place in
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
20
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
nuclear facilities and such involving sources of ionizing radiation. The scope, topics covered and sequence of training
are set out in training programs, training schedules, schedules for initial and supportive specialized training featuring
a full-scale simulator.
The employer encourages the enhancement of staff qualification and to that end provides additional paid leave to
workers and employees who continue their education by pursuing programs that allow for professional development
at the Company. Employees are given the opportunity to take part in various professional meetings, forums and
workshops to exchange experience and enhance their qualification.
A Key Position Vacancies Plan has been developed for NPP Kozloduy EAD to provide additional information in
support of the timely recruitment and training of employees to be hired at the Company in order to secure safe and
long-term operation of nuclear equipment.
The main priority of the human resources management in ESO EAD is the appointment of young specialists in the
company; a number of measures are have been taken in this aspect. A Scholarship Program aimed at students studying
at technical universities in the country is being successfully implemented aiming at attracting young specialists who
want to work in the field of the electric power industry. This practice aims to establish sustainable partnerships with
educational institutions, which is a prerequisite for eliminating the gap between business and education. The desired
result from the Program for the company is hiring successful students after completing their studies. For another year,
the company’s internship program has aroused significant interest among young people. The program is attended by
interns from the country and abroad, including the Technical Universities in Sofia, Ruse, Plovdiv, Varna, UNWE,
Sofia University, NBU, American University, as well as students from Germany and the Netherlands.
In 2024, guided by the policy of promoting the Company’s activities among young people with the aim of attracting
future specialists in the energy industry, ESO EAD successfully implemented a policy of hands on learning under the
dual training system for students from electrical engineering vocational high schools in the country.
The educational qualification activity at Mini Maritsa Iztok EAD fully corresponds to the structure and organization
of the production process in the Company, as carried out in several directions, such as the organization of trainings,
seminars, qualifications and acquisition of legal capacity in professions related to the Company activities.
Collective labor agreements
Collective labor agreements (CLAs) have been concluded between the trade unions and some of the companies in
BEH Group, which regulate specific labor, social security and social relations that are not regulated by mandatory
legislative provisions. CLAs guarantee compliance with the Employer's commitments to guarantee the rights of the
staff. The typical arrangements in the collective labor agreements are also aimed at maintaining the social peace in the
companies, a prerequisite for effective conduct of negotiations and a form of conflict prevention. The agreements
establish a framework for social activity in part of the companies, and the conditions reached have the following basic
guidelines, such as: safety and health of workers and employees in the companies, provision of favorable conditions
for rest and recovery of the workforce of the staff, social and household benefits, financial assistance and benefits, etc.
Reported results
The reported data in the companies with an active CLAs are presented in the table below. The companies where no
operating CLAs are available are Bulgargaz EAD, NEO EAD and Minproekt EAD.
Indicator: BEH NPP TPP NEK ЕSО BTG MMI
Existence of a valid CLA Yes Yes Yes Yes Yes Yes Yes
Number of members as of 31.12.2024 101 3,813 2,244 1,882 3,186 933 6,358
% of the number of employees as of
31.12.2024 100% 100% 99.9% 100% 100% 100% 100%
Newly joined members in 2024 101 276 26 1,882 189 22 -
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
21
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Employees who renounced the terms of
CLA in 2024 - - - 226 311 - -
The following results have been reported in relation to implemented social policies:
Indicators / th. of BGN / BEH NPP TPP NEK ЕSО BGAZ BTG MMI
Trainings, qualifications and
workshops 76 775 140 - 230 18 219 49
Donations and social events 99 5,805 399 - 587 12 20 234
Social costs 2,340 49,666 25,506 26,727 37,060 1,509 26,931 62,022
incl. free food - 20,998 8,838 - 4,175 545 5,726 21,494
Medical care - 1,290 481 1,188 251 30 84 398
4. Issues related to human rights and the fight against corruption and bribery
Anti-corruption plan for the energy sector
The companies in BEH Group implement the Sectoral Anti-Corruption Plan for the energy sector 1 (Sectoral anti-
corruption plan), approved by Order No. Е -РД-16-536/30.10.2015 of the Minister of Energy. This plan elaborates on
and makes more specific the priority areas for prevention of and cracking down on corruption in the energy sector,
ensuring transparent management and accountability in the conduct of activities at the Ministry of Energy and at the
companies with more than 50% state-ownership of equity.
BEH EAD and its subsidiaries apply internal rules and procedures for registration and taking action upon complaints
of corruption and/or conflict of interest and such of a more general nature, and for the protection of persons who have
submitted such information. The examination of the received complaints is carried out on the principle of
confidentiality of the information and protecting the anonymity of the persons who have submitted such complaints.
In 2024, no cases of corruption were identified in the BEH Group companies.
The following results have been reported in connection with the implementation of the Sectorial Anti-Corruption Plan
in the energy sector in 2024:
Indicators / number / BEH NPP TPP NEK ЕSО BGAZ BTG MMI
Corruption reports received 1 2 - - - - - -
Identified cases of corruption - - - - - - - -
Protected persons that have
submitted corruption reports - - - - - - - -
Code of Conduct
BEH EAD and the companies in BEH Group have adopted a Code of Conduct, which aims to define the ethical norms
and rules of conduct in the corporate culture of employees, sets out the framework in which all employees operate,
guides them in their daily contacts with colleagues and external contractors and reflects the norms of proper corporate
behavior. The purpose of the Code of Conduct is to achieve a more comfortable working environment that leads to a
higher level of commitment of each employee in the work process.
https://www.me.government.bg/files/useruploads/files/inspektorat/sektoren_anti_korupzionen_plan_energetikata.pdf
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
22
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
5. Disclosures in connection with Art. 8 of Regulation (EU) 2020/852 establishing a framework to facilitate
sustainable investment and amending Regulation (EU) 2019/2088 (Taxonomy Regulation)
The Paris Agreement adopted under the United Nations Framework Convention on Climate Change (UNFCCC) was
approved by the European Union (EU) on 5 October 2016. Art. 2, para. 1, letter "c" of the UNFCCC sets out a target
to redirect capital flows to ecologically sustainable and/or neutral activities with regard to the impact on the
environment with a view to achieving the goals of reducing greenhouse gas emissions and achieving sustainable
ecological development. In addition, the adopted European Green Pact (so-called Green Deal) by the European
Commission (EC) in 2019 aims to transform the EU into a society with a modern, resource -efficient and competitive
economy in which in 2050 there will be no net emissions of greenhouse gases and economic growth will no t depend
on the usage of the natural resources.
In order to increase the share of investments in climate-neutral technologies, the EU adopted a package of measures
to finance sustainable growth. In this regard, on 18 June 2020, the Regulation (EU) 2020/852 of the European
Parliament and of the Council of 18 June 2020 for establishing a framework to facilitate sustainable investments and
amending he Regulation (EU) 2019/ 2088) entered into force. “ Taxonomy” definition has been presented, which is a
key component of the European Commission action plan to meet these targets and it is an important step towards
achieving carbon neutrality by 2050 in line with the EU set climate targets. Taxonomy in essence is a classification
system for environmentally sustainable economic activities.
The current legislation in relation to the application of the requirements laid down in the Taxonomy Regulation
includes:
➢ Directive 2013/34/EU of the European Parliament and of the Council of 26 June 2013 on the annual financial
statements, consolidated financial statements and related reports of certain types of undertakings, amending
Directive 2006/43 of the European Parliament and of the Council and repealing Directives 78/660/EEC and
83/349/EEC of the Council;
➢ Regulation (EU) 2020/852 of the EP and of the Council as of 18 June 2020 establishing a framework for
sustainable investments and amending Regulation (EU) 2019/2088;
➢ Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852
of the European Parliament and of the Council by establishing the technical screening criteria for determining
the conditions under which an economic activity qualifies as contributing substantially to climate change
mitigation or climate change adaptation and for determining whether that economic activity causes no
significant harm to any of the other environmental objectives, according to Art. 9 of the Tax onomy
Regulation, amended by Delegated Regulation (EU) 2023/2485 ;
➢ Commission Delegated Regulation (EU) 2021/2178 of 6 July 2021 supplementing Regulation (EU) 2020/852
of the European Parliament and of the Council by specifying the content and presentation of information to
be disclosed by undertakings subject to Articles 19a or 29a of Directive 2013/34/EU concerning
environmentally sustainable economic activities, and specifying the methodology to comply with that
disclosure obligation;
➢ Commission Delegated Regulation (EU) 2022/1214 of 9 March 2022 amending Delegated Regulation (EU)
2021/2139 as regards economic activities in certain energy sectors and Delegated Regulation (EU)
2021/2178 as regards specific public disclosures for those economic activities;
➢ Commission Delegated Regulation (EU) 2023/2485 of 27 June 2023 amending Delegated Regulation (EU)
2021/2139 establishing additional technical screening criteria to determine the conditions under which
economic activities are qualified as contributing substantially to climate change mitigation or adaptation and
whether those economic activities do not cause significant harm in relation to the achievement of any of the
other environmental objectives;
➢ Commission Delegated Regulation (EU) 2023/2486 of 27 June 2023 supplementing Delegated Regulation
(EU) 2020/852 of the European Parliament and of the Council by establishing the technical screening criteria
to determine the conditions under which an economic activity qualifies as contributing substantially to the
achievement of 6 (six) environmental objectives, and for determining whether that economic activity does
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
23
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
not cause significant harm in relation to the achievement of any of the other environmental objectives, and
amending the Commission Delegated Regulation (EU) 2021/2178 as regards the specific public disclosure
of information on those economic activities.
Disclosure of environmentally sustainable economic activities
Environmentally sustainable economic activities are defined in the Taxonomy Regulation. Within the meaning of
Delegated Regulation (EU) 2021/2178 , as well as on the basis of the Accounting Act and the Public Enterprises Act
(with regard to the companies in the corporate structure that carry out consolidation), the subsidiaries of Bulgarian
Energy Holding EAD, as non-financial companies are required to disclose non-financial information in their annual
activity report for 2024 containing the activities of the relevant company related to the economic activities that are
classified as environmentally sustainable according to Articles 3 and 9 of the Taxonomy Regulation, the taxonomy
non-eligible activities and key performance indicators according to Annexes I and II of Delegated Regulation
2021/2178.
The disclosure information relating to the implementation of the provisions of the Regulation on taxonomy covers the
financial year 2024.
Classification of economic activities according to the Taxonomy Regulation
Taxonomy-eligible economic activity
The Taxonomy Regulation and its delegated regulations provide a definition of a taxonomy-eligible economic
activity. In accordance with Art. 1, item 5 of Delegated Regulation (EU) 2021/2178 , an economic activity is
taxonomy-eligible regardless of whether it meets some or all of the technical verification criteria established in
Delegated Regulation (EU) 2021/2139 . The eligibility of a given economic activity under the taxonomy does not
guarantee its alignment and sustainability with the requirements of Art. 3 of the Taxonomy Regulation. In the event
that an economic operator generates revenue or invests in capital expenditure (CapEx) or in operating expenditure
(OpEx) corresponding to an economic activity described in Delegated Regulation (EU) 2021/2139 , the activity may
be considered consistent in terms of the taxonomy eligibility disclosure. Otherwise, if an activity is not included in
the Delegated Act, it should not be considered eligible.
Taxonomy-aligned economic activity
A given economic activity is considered a “taxonomy-aligned economic activity” if:
• it contributes substantially to one or more environmental objectives;
• it does not significantly harm any of the six environmental objectives;
• it is carried out in accordance with the minimum requirements ensuring compliance with the OECD
Guidelines for Multinational Enterprises and the UN Guiding Principles on Business and Human Rights,
including the principles and rights established in the eight core conventions set out in the International
Labor Organization's Declaration on Fundamental principles and rights at work and in the International
Charter of Human Rights;
• it meets the technical verification criteria set out in the Delegated Climate Act and its annexes ( Delegated
Regulation (EU) 2021/2139 and Delegated Regulation (EU) 2023/2486 ).
Transitional economic activity
Any economic activity for which there is no technologically and economically feasible low-carbon alternative is
classified as contributing substantially to mitigating the effects of climate change if it supports the transition to a
climate-neutral economy in line with measures to limit the temperature increase to 1.5 C above pre-industrial levels.
In addition, in order to meet the definition of a transitional economic activity, it needs to fulfill the following specific
criteria:
• has greenhouse gas emission levels that correspond to the best in the sector or industry;
• does not impede the development or implementation of low-carbon alternatives;
• does not lead to a commitment to carbon-intensive assets considering their economic life cycle.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
24
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Enabling economic activity
Any economic activity that directly enables other activities to contribute substantially to one or more environmental
objectives, provided that this economic activity:
• does not result in a tie-up with assets that undermine the achievement of long-term climate objectives
over the economic life cycle of those assets;
• has a significant positive impact on the environment based on life cycle considerations.
Environmental objectives
The same are specified in Art. 9 of the Taxonomy Regulation as follows:
• climate change mitigation;
• climate change adaptation;
• sustainable use and protection of water and marine resources;
• transition to a circular economy;
• prevention and control of environmental pollution;
• protection and restoration of biodiversity and ecosystems.
The degree of environmental sustainability of the activities carried out by a given company and their compliance with
the taxonomy is determined based on an analysis of the contribution of the given activity to the achievement of stated
environmental objectives:
Taxonomy-eligible economic activities of the BEH Group companies
After an assessment has been carried out to identify the taxonomy-eligible economic activities of BEH Group
subsidiaries, in accordance with the technical verification criteria in Commission Delegated Regulation (EU)
2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852 of the EP and of the Council, Regulation (EU)
2022/1214 of 9 March 2022 amending Delegated Regulation (EU) 2021/2039 9 as regards economic activities in
certain energy sectors, Commission Delegated Regulation (EU) 2023/2486 of 27 June 2023 amending Delegated
Regulation (EU) 2020/852 of the European Parliament and of the Council and Delegated Regulation (EU) 2021/2178
as regards specific public disclosures for those economic activities in accordance with the specified environmental
objectives of the EU, the main group-level economic activities covered by the Delegated Climate Act, respectively
eligible for the taxonomy, were summarized and identified as follows:
BULGARIAN ENERGY HOLDING EAD
Bulgarian Energy Holding EAD has a scope of activity: Acquisition, evaluation and sale of participations in trading
companies operating in the fields of production, extraction, transmission, transit, storage, management, distribution,
sale and/or purchase of natural gas, electricity, thermal power, coal, as well as any other types of energy and raw
materials for the production and participation in the management of such companies, their financing, acqu isition,
evaluation, issuance and sale of bonds, acquisition, evaluation and sale of patents, concession of licenses for use of
the above companies as well as performance of own production or trade activities.
The company is a financial holding and it provides financial services, therefore its activity falls outside the scope of
the taxonomy - hence, no holding activities have been identified that are taxonomy-eligible.
NPP Kozloduy EAD
NPP Kozloduy EAD, a parent company, has reviewed and evaluated the economic activities of the companies in the
group in connection with the operation of Regulation (EU) 2020/852 of 18 June 2020 and the applicable delegated
regulations thereto.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
25
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In view of the specified environmentally sustainable activities related to production of energy from nuclear and gas
plants according to Delegated Regulation (EU) 2022/1214 , the license activities performed by NPP Kozloduy EAD
fall within the scope of item 4.28 Electricity or heat generation from nuclear energy in existing installations and
are classified as eligible under the taxonomy. This type of activity is included in Annexes I and II of the Commission
Delegated Regulation (EU) 2022/1214 of 9 March 2022 amending Delegated Regulation (EU) 2021/2139 as regards
economic activities in certain energy sectors and of Delegated Regulation (EU) 2021/2178 as regards specific public
disclosures for those economic activities.
HPP Kozloduy EAD (a subsidiary) operates a hydroelectric plant with an installed capacity of 5 MW. In accordance
with the statistical classification of the economic activities established by Regulation (EC) No. 1893/2006, the
operation of a facility for the production of electricity from hydropower refers to the following NACE code, namely
D35.11. The performed activity is classified as taxonomy eligible and it falls within the scope of Item 4.5. Electricity
generation from hydropower of Annex I of Delegated Regulation (EU) 2021/2139 supplementing the Taxonomy
Regulation.
In view of the specified environmentally sustainable activities related to the construction and safe operation of new
nuclear power plants for the production of electricity according to Delegated Regulation (EU) 2022/1214 of 9 March
2022 (amending Delegated Regulation (EU) 2021/2039 as regards economic activities in certain energy sectors and
of Delegated Regulation (EU) 2021/2078 as regards specific public disclosures for those economic activities) the
license activities carried out by NPP Kozloduy - New Capacities EAD (a subsidiary) do not fall within the scope of
Item 4.27. Construction and safe operation of new nuclear power plants, for the generation of electricity or
heat, including for hydrogen production, using best-available technologies as no construction permit has been
issued yet by the competent authority of the new nuclear facility in accordance with the requirement of Commission
Regulation EU 2020/1214 of 9 March 2022.
The remaining companies within the Group carry out activities related to the exercise of construction supervision in
design and construction, assessment of the compliance of investment projects, servicing of automation tools, software
technical complexes, automated technical complexes and instrumentation, which are fully aimed at serving the parent
company.
After an analysis and evaluation of the activities within the Group, the below activities have been distinguished -
environmentally sustainable and taxonomy eligible (group A1), taxonomy eligible but not environmentally sustainable
(group A2) and taxonomy non-eligible (group B):
A. Taxonomy Eligible Activities
А.1. Environmentally sustainable activities (taxonomy-aligned)
4.5. Electricity generation from hydropower
Description of the activity:
Operation of an existing facility for the production of electricity from hydropower - HPP of warm corridor 1 with
an installed capacity of 5 MW.
4.28. Electricity generation from nuclear energy in existing installations
Description of the activity:
Electricity and heat generation from nuclear energy in existing installations.
5.3. Construction, expansion and operation of waste water collection and treatment systems and operation of waste
water collection and treatment systems
Description of the activity:
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
26
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The activity includes the collection of domestic waste water from the company’s activities, through its own sewage
system, its treatment in a treatment facility for treating domestic waste water and its discharge to a water body.
The activity has a substantial contribution to pollution prevention and control.
For the discharge of treated wastewater, the company has been issued a permit under the Water Act, with individual
emission limits for pollutants defined in the national legislation.
The activity contributes to not causing significant harm. The activities are carried out in accordance with the issued
wastewater discharge permit.
The economic activity to which the activity can be attributed is E37.00
7.4. Installation, maintenance and repair of charging stations for electric vehicles in buildings (and parking spaces
attached to buildings)
Description of the activity:
The activity includes the installation and maintenance of charging stations and parking spots and charging electric
vehicles that belong to the company.
The activity has a substantial contribution to mitigating climate change, as it is an enabling activity according to
Art. 10, para. 1, letter (i) of Regulation (EU) 2020/852.
The economic activity to which the activity can be attributed is F42.99.
А.2. Taxonomy eligible but not environmentally sustainable activities (non -taxonomy aligned activities)
3.10. Hydrogen production
Description of the activity:
The production of hydrogen in the plant is intended for cooling the turbo generator, therefore it is considered non -
taxonomy aligned.
The activity is included in the taxonomy, but in cases where hydrogen is used as a fuel or is involved in mixtures
with other gases that are used for fuels.
The economic activity to which the activity can be attributed is C20.11 according to NACE.
4.12. Hydrogen storage
Description of the activity:
The hydrogen storage in the plant is intended for cooling the turbo generator.
The stored hydrogen does not meet the technical criteria under item 3.10, therefore it is considered not to meet the
technical criteria of the taxonomy.
The economic activity does not meet the criteria under Art. 3 of the Regulation EU 2020/852 and it is considered
non-taxonomy aligned.
5.1. Construction, expansion and operation of water collection, purification, and delivery systems
Description of the activity:
The activity is related to the production of chemically desalinated water for technical needs. The Danube water is
purified from chemical and mechanical impurities through appropriate installations.
The activity does not meet the criteria under Art. 3 of Regulation EU 2020/852 and it is considered non -taxonomy
aligned.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
27
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The economic activity to which the activity can be attributed is E37.00 according to NACE.
5.5. Collection and transport of non-hazardous waste into fractions, separated at the source
Description of the activity:
The waste generated in the enterprise is collected separately according to the written company rules. The waste is
stored in warehouses in individual cells, after which it is transferred to enterprises having the necessary permits for
subsequent safe treatment or recycling.
The activity has a substantial contribution to climate change mitigation, since all separately collected and
transported non-hazardous fractions of waste, which are separated at the source, are transferred for preparation for
reuse or recycling.
The activity contributes to the mitigation of climate change, according to an additional “does not significant harm”
criterion, item 4) “Transition to a circular economy” as the separately collected fractions of waste are not mixed
with other waste or materials with different properties in the waste storage and transfer facilities.
Economic activities in this category can be assigned to NACE code E38.11
6.5. Transport by motorcycles, passenger cars, and light commercial vehicles
Description of the activity:
The company provides mobility between the individual sites by electric cars and electric scooters.
The electric mopeds, cars and trucks are entirely electric and have zero CO2 emissions, but they are a small part of
the company's vehicle fleet. Therefore, the activity is considered non-taxonomy aligned.
Economic activity in this category can be assigned to NACE code Н49.41
7.2. Repair (renovation) of existing buildings
Description of the activity:
Renovation of existing buildings according to a previously prepared investment plan.
The activities in this category partially cover the technical criteria of Annexes I and II and therefore the activity is
considered non-taxonomy aligned.
Economic activities in this category can be assigned to NACE codes F41 and F43.
7.3. Installation, maintenance, and repair of energy-efficiency equipment
Description of the activity:
Repair of existing buildings according to a previously prepared plan for energy efficiency activities.
The activity is an enabling activity according to Art. 10, para. 1, letter (i) of Regulation (EU) 2020/852.
The activities in this category partially cover the technical criteria of Annexes I and II and therefore the activity is
considered non-taxonomy aligned.
Economic activities in this category can be assigned to NACE codes F41 and F43.
B. Taxonomy non-eligible activities
Other educational activities not elsewhere classified
Technical tests and analyses
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
28
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Hotels and similar accommodation
Activity of restaurants and quick service establishments
In connection with Delegated Regulation (EU) 2021/2178, NPP Kozloduy EAD, as a non-financial enterprise, is
required to disclose non-financial information in the annual activity report for 2024 in respect of the enterprise’s
activities related to the economic activities classified as environmentally sustainable pursuant to Articles 3 and 9 of
the Taxonomy Regulation, taxonomy non-eligible activities and key performance indicators (Annexes I and II to
Regulation 2021/2178).
In the disclosed KPIs for the financial year 2024, all economic activities of the Group, defined as environmentally
sustainable and falling into group A1, meet the requirement of the minimum safeguards in accordance with the
European regulatory framework.
The information disclosed under the Taxonomy Regulation covers the reporting annual period of 2024.
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 2,068,064 99.3% - 0.7%
Capital Expenditure (CAPEX) 251,139 72.0% 1.7% 26.3%
Operating Expenditure (OPEX) 134,686 95.3% 4.5% 0.2%
NATSIONALNA ELEKTRICHESKA KOMPANIA EAD
The main activity of Natsionalna Elektricheska Kompania EAD (NEK EAD) for production of electric energy from
hydroelectric power plants (HPP) and pumped-storage hydroelectric power plants (PSHPP) is taxonomy eligible and
aligned. PSHPP is not considered a separate energy storage activity, but is part of the main activity - production of
electric energy from hydroelectric power plants and PSHPPs.
NEK EAD carried out an assessment of the economic activities in 2024 for taxonomic alignment, as follows:
Substantial contribution - In order to determine whether an economic activity is aligned with the taxonomy, it is
necessary for it to have a substantial contribution to one or more of the environmental objectives defined in the
Taxonomy Regulation.
“Does Not Significantly Harm”(DNSH) criteria - For all economic activities with proven substantial contribution to
climate change mitigation, the DNSH criteria are further analyzed. This assessment usually starts with the respective
sites where the respective economic activity is performed.
Minimum safeguards - The final step for taxonomy alignment is compliance with the minimum safeguards (MS). The
minimum safeguards include all procedures applied to ensure that the economic activities are carried out in alignment
with:
• The OECD Guidelines for Multinational Enterprises
• The UN Guiding Principles on Business and Human Rights (UNGPs), including the principles and rights laid
out in the eight core conventions included in the International Labor Organization's Declaration on
Fundamental Principles and Rights at Work; and
• The International Charter of Human Rights.
The results from the eligibility assessment performed are summarized in the table below:
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
29
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
A. Taxonomy eligible activities
А.1. “Environmentally sustainable” activities (taxonomy -aligned)
No activities within group A.1. have been identified.
А.2. Taxonomy eligible but not environmentally sustainable activities (non -taxonomy aligned activities)
4.1. Electricity generation using solar photovoltaic technology (Annex I and/or II)
Description of the activity:
Construction or operation of facilities for the production of electricity through solar photovoltaic technology.
4.5. Electricity generation from hydropower (Annex I and/or II)
Description of the activity:
Construction and operation of facilities for the production of electricity from hydropower - impoundment HPPs
and PSHPPs.
4.10. Electricity storage (Annexes I and/or II)
Description of the activity:
Construction and operation of electricity storage facilities that subsequently return it to the electricity network. The
activity includes storing hydroelectric energy through pumped storage facilities.
Economic activities in this category have no defined NACE code - the statistical classification of economic
activities established by Regulation (EC) No. 1893/2006.
6.5 Transport with motorcycles, passenger cars, and commercial vehicles
Description of the activity:
Purchase, financing, leasing and operation of vehicles classified in categories M1 (499) and N1 (500), which are
within the scope of Regulation (EC) No. 715/2007, or category L (two-, three- and four-wheeled vehicles) (501).
7.2. Repair (renovation) of existing buildings
Description of the activity:
Construction and installation works of buildings and construction equipment or preparation for such.
Repair of existing buildings in accordance with the current legislation.
Economic activities in this category can be assigned to NACE codes F41 and F43.
The activities in this category partially cover the technical criteria of Annex II and therefore the activity is
considered non-taxonomy aligned.
7.3. Installation, maintenance, and repair of energy-efficiency equipment
Description of the activity:
Separate repair measures consisting of installation, maintenance and repair of energy-efficiency equipment. The
economic activities of this category consist of the following individual measures:
• Adding insulation to existing components of the external building envelope such as external walls (including
green facades), roofs (including green roofs), attics, basements and ground floors (including measures to ensure
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
30
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
sealing against ingress of external air, measures to reduce the effects of thermal bridging and scaffolding) and
products for attaching insulation to the exterior building envelope (including mechanical fixings and
adhesives);
• Replacement of existing windows with new energy-efficient ones;
• Replacement of existing exterior doors with new energy-efficient ones;
• installation and replacement of energy-efficient light sources;
• Installation, replacement, maintenance and repair of heating, ventilation and air conditioning (HVAC) and
water heating systems, including equipment related to regional (central) heat supply services, with high-
efficiency technologies.
7.7. Acquisition and ownership of buildings
Description of the activity:
Purchase of real estate and exercise of ownership rights over them.
The economic activities of this category can be referred to code L68 under NACE - the statistical classification of
economic activities established by Regulation (EC) No. 1893/2006
NEK EAD, as a non-financial enterprise of public interest, discloses the proportion of turnover, capital expenditure
(CAPEX) and operating expenditure (OPEX) for the reporting period of 2024, related to taxonomy-aligned economic
activities in accordance with Article 8 of the Taxonomy Regulation.
In the process of preparing and presenting the taxonomy key performance indicators, the company uses the templates
provided in Annex II to the Delegated Disclosure Act. The following table presents a summarized information
regarding the calculated KPIs of NEK EAD for 2024, as well as comparative relevant data for the reporting year 2023.
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 2,124,341 - 15.48% 84.52%
Capital Expenditure (CAPEX) 37,465 - 56.76% 43.24%
Operating Expenditure (OPEX) 4,511 - 35.78% 64.22%
Financial year 2023 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,774,737 16.26% - 83.47%
Capital Expenditure (CAPEX) 33,008 65.82% 8.81% 25.38%
Operating Expenditure (OPEX) 2,481 36.40% 14.57% 49.03%
Elektroenergien Sistemen Operator EAD
The taxonomy information in the report has been prepared in accordance with EU Regulation 2020/852, Delegated
Regulation (EU) 2021/2178, Delegated Regulation (EU) 2021/2139, Delegated Regulation (EU) 2023/2485 and
Delegated Regulation (EU) 2023/2486.
Companies in the corporate structure of ESO fall within the scope of Article 8 of the Taxonomy Regulation and
prepare non-financial information in accordance with the Accounting Directive 2013/34/EU and the Accounting Act
transposing Directive 2014/95/EU. The disclosure of substantial accounting policies is presented in the explanatory
notes to the Annual Consolidated Financial Statements as of 31.12.2024.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
31
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
ESO EAD is the holder of license No. Л-419- 04/18.12.2013, according to which the parent company carries out:
transmission of electricity through the electricity transmission network, management of the electricity system,
administration of electricity deals and the balancing energy market and electricity metering. In addition, ESO Group
also includes the companies ESO Engineering EOOD, ESO Project EOOD and ESO Charge EAD with the following
scope of activity:
• main activity of the subsidiary ESO Engineering EOOD
Designing, consultancy, construction of technologies and projects for energy facilities, project management,
construction, commercial representation and mediation, domestic and foreign trade, purchase and sale of real estate,
transport and forwarding activities, as well as any other commercial activity that is not expressly legally prohibited.
• main activity of the subsidiary ESO Proekt EOOD
The subject of activity of the company is the design of energy sites, including the preparation of technical and
conceptual projects by virtue of the Spatial Planning Act, consulting activity, as well as any other commercial activity
that is not legally prohibited.
• main activity of the subsidiary ESO Charge EAD
The scope of the company’s activities includes construction, commissioning, operation and maintenance of electric
energy and hydrogen charging systems, hydrogen production systems, development of software products, design and
consulting activities, as well as any other activity not prohibited by the laws of the Republic of Bulgaria.
Assessment of the compliance with the Taxonomy Regulation (Regulation (EU) 2020/852
In accordance with Regulation (EU) 2020/852 and the supplementary delegated acts thereto, the non-financial
information shall include the reporting of the Group’s taxonomy -aligned turnover, CAPEX and OPEX for 2024. This
eligibility disclosure applies to the environmental objectives for climate change mitigation and adaptation currently
reviewed in the European Taxonomy on the grounds of Art. 27, para. 2, letter (a) of the Taxonomy Regulation
(Regulation (EU) 2020/852).
In the Commission Delegated Regulation (EU) 2021/2139 of 4 June 2021 supplementing Regulation (EU) 2020/852
of the European Parliament and of the Council by establishing the technical criteria for verification in order to
determine the conditions under which a given economic activity qualifies as contributing substantially to climate
change mitigation or climate change adaptation, and for the purpose of determining whether this economic activity
does no significant harm in relation to the achievement of any of the other environmental objectives (supplemented
and amended by Delegated Regulation (EU) 2022/1214 and Delegated Regulation (EU) 2023/2835) the technical
verification criteria are established for a wide range of activities related to the power supply chain - from electricity
and heat generation from various sources, through the transmission and distribution networks, to electricity storage
and the use of heat pumps and the production of biogas and bio-liquid fuels.
After an analysis of the Group’s activities for compliance with the technical criteria in the above -mentioned delegated
acts, it has been established that, pursuant to Article 10, letters (a) and (g) of the Taxonomy Regulation, the activity
of electricity transmission and distribution has been identified as an eligible economic activity.
According to the technical verification criteria, electricity transmission and distribution activities are classified as
enabling activities in accordance with Article 10, para. 1, letter (i) of the Taxonomy Regulation (Regulation (EU)
2020/852). In addition, enabling eligible activities directly related to the electricity transmission and distribution
activity were identified, as follows:
A. Taxonomy Eligible Activities
А.1. “Environmentally sustainable” activities (taxonomy -aligned)
4.9. Electricity Transmission and Distribution
- transmission of electricity through the electricity transmission network
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
32
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- power system management (PSM)
7.2. Repair (renovation) of existing buildings
7.5. Installation, maintenance and repair of instruments and devices for measuring, regulating and controlling the
energy performance of buildings
8.1. Data processing, hosting and similar activities
8.2. Data-driven solutions for GHG emissions reductions
2.1. Hotels, holiday homes, campsites and similar accommodation
А.2. Taxonomy eligible but not environmentally sustainable activities (non -taxonomy aligned activities)
4.9. Electricity Transmission and Distribution
7.1. Construction of new buildings (construction and engineering, construction of industrial facilities)
7.2. Repair (renovation) of existing buildings
7.3. Installation, maintenance and repair of energy-efficient facilities (construction of energy and communication
networks, construction of industrial facilities)
7.5. Installation, maintenance and repair of instruments and devices for measuring, regulating and controlling the
energy performance of buildings
8.1. Data processing, hosting and similar activities
8.2. Data-driven solutions for GHG emissions reductions
2.1. Hotels, holiday homes, campsites and similar accommodation
In order to avoid double reporting of taxonomy-eligible economic activities that are already accounted for under the
climate change mitigation objective, the Group does not report eligible activities related to the environmental objective
of climate change adaptation.
In relation to the calculation of the key performance indicators for turnover, CAPEX and OPEX, the methodology
used by the ESO Group is in accordance with Sections 1.1.1, 1.1.2 and 1.1.3 of Annex I to Delegated Regulation (EU)
2021/2178.
A summary of the calculated key performance indicators for 2024 and comparable reporting information for 2023 is
contained in the tables below.
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,383,007 45.19% 0.02% 54.79%
Capital Expenditure (CAPEX) 257,490 83.77% 0.10% 16.13%
Operating Expenditure (OPEX) 30,505 1.92% 91.39% 6.68%
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
33
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Financial year 2023 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,363,075 50.67% 0.01% 49.32%
Capital Expenditure (CAPEX) 411,593 53.34% 0.31% 46.35%
Operating Expenditure (OPEX) 23,398 0.06% 87.05% 12.89%
BULGARGAZ EAD
A review of the Company economic activities was carried out with the technical eligibility criteria for the taxonomy
and for alignment with Annexes I and II to Delegated Regulation (EU) 2021/2139 (the Delegated Climate Act). As a
result, a justified conclusion was reached that the main economic activity of Bulgargaz EAD, i.e. public supply of
natural gas, is not covered by the Delegated Climate Act and is therefore taxonomy non-eligible.
BULGARTRANSGAZ EAD
The parent company Bulgartransgaz EAD is a combined gas operator holding licenses for the transmission and storage
of natural gas on the territory of the Republic of Bulgaria, according to Art. 39 of the Energy Act. The company
develops the gas transmission system of Bulgaria, maintains the sites and facilities of the gas transmission network in
accordance with the technical requirements and safety rules at work, in accordance with the environmental protection
requirements.
According to the subject of the Company activity and its classification under the National Classification of Economic
Activities - H 49.50, the activities carried out by the Company may contribute to achieving the environmental goal to
“mitigating climate change” (according to Article 9a) of the Regulation (EU) 2020/852 and fall within the scope of
Article 10.1g of the Regulation - “establishing energy infrastructure required for enabling the decarbonization of
energy systems”.
In compliance with the eligibility criteria, the activity of the parent company Bulgartransgaz EAD is described and
falls within the scope of item 4.14 - “Transmission and distribution networks for renewable and low -carbon gases” of
Annex No. 1 of the Commission Delegated Regulation (EU 2021 /2139). More specifically, the activity is indicated
as - transformation, change of purpose (redevelopment) or modernization of gas pipeline networks for gases from
renewable and low-carbon sources; construction or operation of transmission and distribution gas pipelines for
transporting hydrogen or other gases from low-carbon sources.
The main activity of the parent company Bulgartransgaz EAD (Development of the country gas transmission system
and maintenance of the objects and facilities of the gas transmission network) is in full compliance with the
requirements laid down in Art. 16 of the Taxonomy Regulation, meeting the definition of “enabling economic activity”
in relation to the activities stated above.
Taken into attention the aforementioned, the activity of the parent company Bulgartransgaz EAD has been identified
as an ‘economic activity eligible for the taxonomy’.
The main activity of Bulgartransgaz EAD is the transmission and storage of natural gas, and in this sense the
complementary economic activity defined for the purposes of the taxonomy, which is related to the development and
maintenance of the objects of the gas transmission network, has no realized turnover in 2024, which could be
recognized for taxonomy purposes.
Considering that the companies of the corporate structure of Bulgartransgaz are non-financial enterprises, the parent
company presents consolidated key performance indicators - turnover, capital expenditure (CAPEX) and operating
expenditure (OPEX), according to Annex I of Delegated Regulation (EU) 2021/2178.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
34
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In accordance with Art. 8 of the aforementioned Delegated Regulation KPIs have been submitted for the reporting
period 01.01 –31.12.2023. The parent company Bulgartransgaz EAD discloses information in the same currency that
it uses in the financial statements - Bulgarian leva (BGN). In the process of calculating the key performance indicators,
the most up-to-date data has been used and the Methodology for the calculation of these results has been used in
accordance with sections 1.1.1, 1.1.2 and 1.1.3 of Annex I to the Delegated Regulation (EU) 2021 /2178.
The following table presents consolidated information about the proportion of taxonomy-eligible and non-eligible
activities for 2024:
Financial year 2024 Total (BGN
000).
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,080,500 - - 100.00%
Capital Expenditure (CAPEX) 120,752 52.04% - 47.96%
Operating Expenditure (OPEX) 9,800 8.00% - 92.50%
MINI MARITSA IZTOK EAD
Mini Maritsa Iztok EAD, as a non-financial enterprise, presents the proportion of the total turnover, capital expenditure
(CapEx) and operating expenditure (OpEx) for the reporting period of 2024, related to taxonomy eligible economic
activities in connection with the first two environmental objectives (climate change mitigation and climate change
adaptation) in accordance with Art. 8 of the Taxonomy Regulation and Art. 10, Para. 2 of the Delegated Regulation
(EU) 2021/2178.
The scope of Regulation (EU) 2020/852 includes the environmental objectives specified by Art. 12 to Art. 14 – a
substantial contribution to the sustainable use and protection of water and marine resources , a substantial
contribution to the transition to a circular economy , a substantial contribution to the prevention and control of
pollution.
A taxonomy eligibility review and alignment with Annexes I and II to the Delegated Regulation (EU) 2021/2139 (the
Delegated Climate Act) of the company’s economic activities was carried out. The Delegated Climate Act focuses on
those economic activities and sectors that have the greatest potential to achieve the climate change mitigation objective
– i.e. the need to avoid the production of greenhouse gas emissions, reduce these emissions or increase greenhouse
gas removals and long-term carbon capture and storage. The sectors covered include energy, selected manufacturing
activities, transport and buildings.
After a thorough review of all economic activities for taxonomy eligibility and alignment with Annexes I and II to
Delegated Regulation (EU) 2021/2139 (the Delegated Climate Act), it has been reasonably concluded that the main
economic activity of Mini Maritsa Iztok EAD – coal mining and trading – is not covered by the Delegated Climate
Act and is therefore taxonomy non-eligible.
Moreover, an analysis was implemented of all additional and accompanying activities generating income in the
Company, which are classified as taxonomy-eligible economic activities, with the exception of freight rail transport
of goods on the national railway infrastructure.
The activity of providing freight rail services on the national railway infrastructure is included in item 6.2. Freight rail
transport from Annex 1 of Delegated Regulation (EU) 2021/2139 (Delegated Climate Act) and is therefore a taxonomy
eligible economic activity, NACE code 49.20 Freight rail transport - freight transport on mainline rail networks as
well as short line freight railroads.
Part of the transport of coal to customers in the East Maritsa Basin area is carried out by rail with separate rail transport
services also being carried out.
In the mines Troyanovo-1 and Troyanovo-sever there are sections along the Railway Transport with the respective
units necessary for the implementation of the transport process. Each unit has a specific scope of activity with the
main goal being the safety of the shunting activity and the provision of train movement in strict compliance and
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
35
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
implementation of the regulations. All orders, guidelines, and other ordinances related to cargo and transportation
safety are coordinated with the Railway Transport Departments in the Management of Mini Maritsa Iztok EAD.
Through the rail transportation business, the Company generates revenue and generally incurs both capital
expenditures and operating expenditures related thereto. Although the Company’s activities are aimed at mitigating
climate change, the freight rail transport activity does not fully meet the technical screening criteria to determine the
conditions under which it is classified as contributing substantially to climate change mitigation and/or adaptation and
therefore it could not be defined as a taxonomy-aligned economic activity.
A. Taxonomy Eligible Activities
А.1. “Environmentally sustainable” activities (taxonomy -aligned)
А.2. Taxonomy eligible but not environmentally sustainable activities (non-taxonomy aligned activities)
6.2. Freight rail transport
In the process of calculating the KPI of Mini Maritsa Iztok EAD for 2024, the samples included in Annex II to the
Delegated Act under Art. 8 of the Taxonomy Regulation. A summarized information about the percentage of
taxonomy eligible (environmentally sustainable and non-taxonomy aligned) and non-eligible economic activities in
the total turnover, capital expenditure and operating expenditure is presented in the tables below.
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 317,451 - 0.67% 99.33%
Capital Expenditure (CAPEX) 52,012 - 2.33% 97.67%
Operating Expenditure (OPEX) 20,027 - 13.84% 86.16%
Financial year 2023 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 442,346 - 1.00% 99.00%
Capital Expenditure (CAPEX) 103,374 - 1.00% 99.00%
Operating Expenditure (OPEX) 19,270 - 26.00% 74.00%
TPP MARITSA EAST 2 EAD
In accordance with Article 8 of the Taxonomy Regulation, the company in its capacity of a non -financial enterprise
of public interest, discloses the proportion of turnover, capital expenditure (CAPEX) and operating expenditure
(OPEX) for the reporting period of 2024, related to taxonomy-aligned economic activities, relevant to the
environmental objectives - climate change mitigation and climate change adaptation.
After an analysis and review of the economic activities, carried out by the enterprise for compliance with the technical
verification criteria defined in the Delegated Climate Act (Annex I and II thereto), it has been established that the
activities performed by TPP Maritza East 2 EAD are taxonomy non-eligible.
The company has calculated the key performance indicators in accordance with the requirements in Annex II to the
Delegated Disclosure Act.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
36
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
A summarized information about the proportion of taxonomy-eligible and taxonomy-aligned economic activities in
total turnover, capital expenditure and operating expenditure for 2024, as well as comparable reporting information
for 2023, are presented in the tables below:
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,211,168 - 0.09% 99.91%
Capital Expenditure (CAPEX) 99,511 - 0.08% 99.92%
Operating Expenditure (OPEX) 35,731 - 0.91% 99.09%
Financial year 2023 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 1,422,103 - 0.04% 99.96%
Capital Expenditure (CAPEX) 141,190 - 0.08% 99.92%
Operating Expenditure (OPEX) 49,379 - 0.37% 99.63%
After an analysis of the economic activities has been carried out by the enterprise for the eligibility criteria, as per the
requirements of the Delegated Regulation, Annexes I and II, no taxonomy eligible activities have been found.
National Energy Operator EAD
For 2024, a review was carried out for compliance of the Company’s economic activities with the technical eligibility
criteria for the taxonomy and for alignment with Annexes I and II to the Delegated Regulation (EU) 2021/2139 (the
Delegated Climate Act). After a thorough review, including all relevant subdivisions and functions, a justified
conclusion was made that the main economic activity of National Energy Operator EAD (NEO EAD) is not taxonomy
non-eligible.
Minproekt EAD
For 2024, a review was carried out for compliance of the Company’s economic activities with the technical eligibility
criteria for the taxonomy and for alignment with Annexes I and II to the Delegated Regulation (EU) 2021/2139 (the
Delegated Climate Act). After a thorough review, including all relevant subdivisions and functions, a justified
conclusion was made that the main economic activity of Minproekt EAD is not taxonomy non-eligible.
CONSOLIDATED KEY PERFORMANCE INDICATORS – BEH GROUP
Key performance indicators (KPIs)
Only non-financial enterprises are included in the corporate structure of BEH EAD. Considering the above, the
companies in the Group disclose the proportion of turnover, capital and operating expenditure, for the year 2024,
related to economic activities that qualify as environmentally sustainable depending on their contribution to the first
two environmental objectives set out in the Taxonomy Regulation. The information from the subsidiaries is
consolidated on a group level, and the amount and proportion of the KPIs relating to the eligible (taxonomy aligned
and non-aligned) economic activities, as well as non-eligible economic activities according to Annexes I and II to
Delegated Regulation (EU) 2021/2139 and Delegated Regulation (EU) 2022/1214. The disclosed information on the
key indicators is presented in table form as required in the Delegated Regulations for each applicable key performance
indicator (KPI). This document presents the key performance indicators covering the reporting period 01.01 –
31.12.2024 and comparable information for the previous reporting period.
The tables below present summarized information on key performance indicators for 2024 and comparable reporting
information for 2023:
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
37
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Financial year 2024 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 8,841,436 24.56% 3.76% 71.68%
Capital Expenditure (CAPEX) 1,283,141 35.81% 2.11% 62.09%
Operating Expenditure (OPEX) 228,285 56.85% 16.75% 26.40%
Financial year 2023 Total
(BGN 000)
Proportion of environmentally
sustainable activities
(taxonomy-aligned)
Proportion of taxonomy
eligible but not
environmentally sustainable
activities (non-taxonomy
aligned activities)
Proportion of taxonomy non-
eligible activities
Turnover 11,522,622 27.54% 0.04% 72.43%
Capital Expenditure (CAPEX) 1,009,220 47.99% 1.09% 50.91%
Operating Expenditure (OPEX) 224,152 56.71% 13.82% 29.47%
The disclosed information in financial aspect is presented in BGN and all indicators are rounded to the nearest
thousand BGN.
The following actions have been taken for the preparation of the consolidated information on the taxonomy-aligned
economic activities in 2024:
• reviewing the business activities of the companies and identifying those that could be eligible and brought
into compliance;
• a detailed analysis of the individual taxonomy-eligible economic activities and of the applicable technical
verification criteria in close cooperation with the key experts;
• consultation with technical experts related to the specific activities and criteria;
• conducted trainings for responsible persons;
• responsible persons have been appointed to summarize the results of the analyzes and prepare the report.
Key indicator of turnover
The proportion of taxonomy-aligned economic activities (group A1) in the total turnover of the Group is calculated
as the part of the net turnover obtained from products and services related to taxonomy-aligned economic activities
(numerator) divided by the total net turnover (denominator), in each case, for the financial year from 1 January 2024
to 31 December 2024.
The numerator of the key turnover indicator is defined as the consolidated net turnover obtained from products and
services related to economic activities corresponding to the taxonomy.
The denominator of the key turnover indicator is based on the sum of the Group's revenue as disclosed in the following
notes to the consolidated statement of profit or loss and other comprehensive income for 2024:
- note 7 “Revenue from sales” – BGN 7,458,276 thousand for 2024
- note 8 “Other operating income” – BGN 1,383,160 thousand for 2024
Key indicator of capital expenditure
The proportion of the taxonomy-aligned economic activities (group A1) in the consolidated total capital expenditure
is calculated as the part of the capital expenditure for the acquisition of tangible and intangible assets related to
taxonomy-aligned economic activities (numerator) divided by the total capital expenditure (denominator), in each
case, for the financial year from 1 January 2024 to 31 December 2024. Only capitalized expenditure on non -current
assets that is taxonomy eligible is included in the numerator.
The denominator of the key indicator for capital expenditure is defined as the total amount of newly acquired non -
current assets, both property, plant and equipment (PPE) and intangible assets during the financial year, before
depreciation and amortization and all revaluations, including those arising from revaluations and impairments, and
excluding changes in fair value relating to the performance of activities aligned with the taxonomy of the Group’s
subsidiaries as disclosed in the 2024 annual consolidated financial statements in:
- note 19 “Property, plant and equipment” - newly acquired assets BGN 1,270,933 thousand in 2024
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
38
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- note 20 “Intangible assets” - newly acquired assets BGN 11,985 thousand in 2024 respectively
Key indicator of operating expenditure
The share of taxonomy-aligned economic activities (group A1) in the total consolidated operating expenditure is
calculated as the part of the realized operating expenditure for the activities related to taxonomy -aligned economic
activities (numerator) divided by the total operating expenditure (denominator), in each case, for the financial year
from 1 January 2024 to 31 December 2024.
The numerator is defined as the sum of the expenses of carrying out taxonomy-eligible economic activities determined
by the companies within the Group.
The denominator of the key indicator for the operating expenditure includes the costs of repair (renovation) and
maintenance of buildings, short-term leases (rents) and all other direct costs related to the ongoing maintenance of the
assets of the property, plant and equipment category, by the Group or by an external contractor that is assigned
activities needed to ensure the continuous and efficient operation of these assets. The total amount of operating
expenses used in the denominator is disclosed in the consolidated statement of profit or loss and other comprehensive
income for 2024, note 10 “Expenses for materials” – in the part about spare parts expenses in the amount of BGN
57,081 thousand, and note 11 “Hired services expenses” – repair expenses incurred in the amount of BGN 171,204
thousand. The consolidated key performance indicators at Group level are presented in the tables below:
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
39
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail .
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
40
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Bulgarian Energy Holding EAD
CONSOLIDATED NON-FINANCIAL INFORMATION
For the year ending 31 December 2024
41
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
VALENTIN NIKOLOV
EXECUTIVE DIRECTOR Signed with electronic signature
15.05.2025, Sofia
Consolidated Report on Payments to Governments
Bulgarian Energy Holding EAD
31 December 2024
BULGARIAN ENERGY HOLDING EAD
Annual Consolidated Report on Payments to Governments for 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail. 1
This consolidated report on payments to governments was prepared in compliance with the requirements of Art.
58 of the Accountancy Act, according to which parent enterprises operating in the field of mining, quarrying or
logging of primary forests, which are required to prepare consolidated financial statements, shall draw up a
consolidated report on payments to governments in accordance with the requirements of Section V of the
Accounting Act.
Bulgarian Energy Holding EAD is a parent company in which structure a company Mini Maritsa-Iztok EAD is
included.
Mini Maritsa-Iztok EAD operates in the mining industry, CEA 2008 05.20 ‘Mining of brown and lignite coal’.
1. Payments on concession contract
Pursuant to Decision No.655 as 13 July 2005 of the Council of Ministers (promulgated in SG, issue 61 of 26 July
2005) the Group, through the subsidiary company Mini Maritsa-Iztok EAD, was granted a concession the mining
of underground resources in the Maritsa Iztok coal basin. The concession contract was signed on 11 August 2005
between the Concedent – Council of Ministers of the Republic of Bulgaria and the Concessionaire – the Group
through its subsidiary Mini Maritsa-Iztok EAD.
Pursuant to the contract, the Group through its subsidiary Mini Maritsa-Iztok EAD is granted the exclusive right
to conduct exploration and mining of coal from the Maritsa Iztok coal basin within the concession area and to
acquire the extracted coal.
The coal extraction from the deposit is performed by an open mining within the concession area including
transport and sale of the extracted coal under the following conditions:
• concession area – 473,685,540.87 square meters
• for a 35-years period, and the period starts from the date of entry into force of the Contract with an option
the Contract to be extended for another 15 years provided that the mining continues in commercial
quantities and in the event there are proven reserves in the Coal deposit and the Concessionaire requests
in written form such extension.
For the period from 01.01.2024 to 31.12.2024, concession contributions were paid to the Ministry of Energy in
the amount of BGN 5,538 thousand as follows:
• Paid liability for the second half of 2023 in the amount of BGN 3,142 thousand excluding VAT, or paid
amount with VAT in the amount of BGN 3,771 thousand.
• The amount of the accrued concession fee for the first half of 2024 is BGN 1,472 thousand excluding
VAT or BGN 1,767 thousand including VAT.
The amount of the accrued concession fee for the second half of 2024 is BGN 3,138 thousand excluding VAT,
with payment due by 31.01.2025.
The development of the operational mining activities of the Group through its subsidiary Mini Maritsa-Iztok EAD
based on the concession contract is the reason for occurrence of the following payments to different entities
(governments).
BULGARIAN ENERGY HOLDING EAD
Annual Consolidated Report for Payments to Governments for 2024
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail. 2
2. Payments to Radnevo Municipality
In connection with the development of the mining activities of the Group through the subsidiary Mini Maritsa -
Iztok EAD, payments were made for the following projects to the municipality of Radnevo:
Mini Maritsa - Iztok EAD has concluded a contract for financing and carrying out rescue archaeological research
on 17.07.2023 with the Maritsa-Iztok Archaeological Museum, owned by the Municipality of Radnevo. The
amount paid in 2024 is BGN 140 thousand.
Signed with electronic signature
VALENTIN NIKOLOV
EXECUTIVE DIRECTOR
BULGARIAN ENERGY HOLDING EAD
15.05.2025
City of Sofia
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Annual Consolidated Financial Statements
Bulgarian Energy Holding EAD
31 December 2024
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF PROFIT OR LOSS
For the year ending 31 December 2024
1
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Notes 2024 2023
BGN’000 BGN’000
Revenue from sales 6 7,458,276 9,674,766
Other operating income 7 1,383,160 1,847,856
8,841,436 11,522,622
Cost of natural gas, electricity and other current assets sold 8 (3,405,516) (5,340,727)
Change in finished goods and work in progress 52,340 60,243
Costs for acquisition of property, plant and equipment in an economic way 9 71,495 58,440
Expenses for materials 10 (396,515) (356,918)
Hired services expenses 11 (439,958) (412,471)
Depreciation, amortisation and impairment 19, 20 (932,505) (899,903)
Personnel expenses 13 (1,387,563) (1,293,645)
Reversal of/(expenses for) impairment of financial and other non-financial
assets, net Costs for greenhouse gas emissions and other provisions 12 32 (110,332) (799,369) 36,085(729,942)
Other operating expenses 14 (1,037,185) (1,315,074)
Operating profit 456,328 1,328,710
Profit from business combination 22 - 14,446
Profit from sale of investment in joint venture 21 - 271
Profit from investments accounted for using the equity method 21 3,716 44,496
Finance income 15 69,535 60,397
Finance costs 16 (173,286) (192,759)
Profit before tax 356,293 1,255,561
Income tax expenses 17 (110,116) (145,129)
Profit for the year 246,177 1,110,432
Profit for the year attributable to:
The shareholder of the parent company 246,177 1,110,432
246,177 1,110,432
BGN BGN
Earnings per share 18.1 0.0711 0.3206

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on
its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
For the year ending 31 December 2024
2
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Notes 2024 2023
BGN’000 BGN’000
Profit for the year 246,177 1,110,432
Other comprehensive income
Items that will not be reclassified in profit or loss:
Revaluation of property, plant and equipment 19 1,823,340 (404,368)
Remeasurement of defined benefit plans 31 2,294 (18,555)
Change in fair value of equity instruments at fair value throughother comprehensive income 26 166 63
Income tax relating to items not reclassified 24 (182,299) 42,561
1,643,501 (380,299)
Items that will be reclassified in profit or loss:
Exchange rate differences from recalculation of foreign activities 23 (15)
23 (15)
Share of other comprehensive income of associates
Items that will not be reclassified in profit or loss:
Remeasurement of defined benefit plans (9) (87)
Financе income on issued insurance contracts - 26
Net change in the fair value of financial assets (equity instruments) 320 643
Income tax related to items that are not reclassified in profit or loss 24 (31) (58)
280 524
Other comprehensive income for the year, net of tax 1,643,804 (379,790)
Total comprehensive income for the year 1,889,981 730,642
Total comprehensive income/(loss) for the year attributable to:
The shareholder of the parent company 1,889,981 730,642
1,889,981 730,642

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on
its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
For the year ending 31 December 2024
3
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Notes 31 December2024 31 December2023
BGN’000 BGN’000
Assets
Non-current assets
Property, plant and equipment 19 21,083,539 19,084,434
Intangible assets 20 47,403 44,828
Investments accounted for using the equity method 21 225,901 241,492
Related party receivables 34Error! Referencesource notfound. 235,592 230,633
Trade and other receivables 23 41,421 41,431
Financial assets at fair value through other comprehensiveincome 26 507 507
Deferred tax assets 24 324,888 293,644
Non-current assets 21,959,251 19,936,969
Current assets
Trade and other receivables 23 2,652,535 2,125,883
Inventories 25 1,395,001 1,576,777
Related partiy receivables Error! Referencesource notfound. 378,017 183,192
Overpaid income tax 5,993 6,484
Financial assets at fair value through other comprehensiveincome 26 885 719
Cash and short-term deposits 27 3,699,884 3,878,394
Assets included in disposal groups - 667
Current assets 8,132,315 7,772,116
Total assets 30,091,566 27,709,085

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on
its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
(CONTINUED)
For the year ending 31 December 2024
4
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Notes 31 December2024 31 December2023
BGN’000 BGN’000
Equity and liabilities
Equity
Share capital 28.1 3,463,942 3,463,942
Other reserves 28.2 2,063,693 2,059,589
Reserve from revaluation of financial assets at fair value through othercomprehensive income 28.3 1,649 1,212
Revaluation reserve of non-financial assets 28.4 11,727,347 10,109,838
Translation reserve 28.5 28 5
Reserve from remeasurement of defined benefit plans 28.6 (201,790) (204,090)
Hedging reserve (1) (1)
Retained earnings 2,891,337 2,906,199
Equity of the shareholder of the parent company 19,946,205 18,336,694
Non-controlling interest - (26)
Total equity 19,946,205 18,336,668
Non-Current liabilities
Loans and lease liabilities 29 1,744,429 3,182,039
Deferred financing 30 687,667 670,969
Retirement employee benefit obligations 31 319,060 271,416
Provisions 32 331,090 263,933
Deferred income 33 730,544 670,308
Trade and other payables 35 378,676 397,466
Liabilities to related parties 34 - 800,000
Deferred tax liabilities 24 1,113,451 952,931
Non-Current liabilities 5,304,917 7,209,062
Current liabilities
Loans and lease liabilities 29 1,694,998 347,001
Trade and other payables 35 1,559,190 1,301,696
Liabilities to related parties 34 827,214 237,342
Provisions 32 623,580 148,134
Retirement employee benefit obligations 31 50,256 64,706
Deferred income 33 34,288 30,126
Deferred financing 30 24,952 23,471
Income tax liability 25,966 10,143
Liabilities included in disposal groups - 736
Current liabilities 4,840,444 2,163,355
Total liabilities 10,145,361 9,372,417
Total equity and liabilities 30,091,566 27,709,085

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on
its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY (CONTINUED)
For the year ending 31 December 2024
5
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Sharecapital Otherreserves Reserves fromrevaluation tofair value Hedgingreserve Revaluationreserve of non-financial assets Translationreserve Reservefromremeasure-ment ofdefinedbenefit plans Retainedearnings Totalshareholder’sequity of theparentcompany Non-controllinginterest Totalequity
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Balance at 1 January 2024 3,463,942 2,059,589 1,212 (1) 10,109,838 5 (204,090) 2,906,199 18,336,694 (26) 18,336,668
Distribution of dividends - - - - - - - (280,529) (280,529) - (280,529)
Transactions with the soleshareholder - - - - - - - (280,529) (280,529) - (280,529)
Profit for the year - - - - - - - 246,177 246,177 - 246,177
Other comprehensive income - - 437 - 1,641,044 23 2,300 - 1,643,804 - 1,643,804
Total comprehensive income for theyear - - 437 - 1,641,044 23 2,300 246,177 1,889,981 - 1,889,981
Derecognition of non-controllinginterest - 4,003 - - (1,847) - - (2,002) 154 26 180
Allocation of profit to reserves - 100 - - - - - (100) - - -
Derecognized revaluation reserve - - - - (21,688) - - 21,688 - - -
Other changes in equity - 1 - - - - - (96) (95) - (95)
Balance at 31 December 2024 3,463,942 2,063,693 1,649 (1) 11,727,347 28 (201,790) 2,891,337 19,946,205 - 19,946,205

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY (CONTINUED)
For the year ending 31 December 2024
6
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Sharecapital Otherreserves Reserves fromrevaluation tofair value Hedgingreserve Revaluationreserve of non-financial assets Translationreserve Reservefromremeasure-ment ofdefinedbenefit plans Retainedearnings Totalshareholder’sequity of theparentcompany Non-controllinginterest Totalequity
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Balance as of 1 January 2023 3,462,942 2,059,566 576 (1) 10,492,464 20 (187,279) 3,216,775 19,045,063 (26) 19,045,037
Increase in share capital throughcontribution in kind 1,000 - - - - - - - 1,000 - 1,000
Distribution of dividends - - - - - - - (1,439,706) (1,439,706) - (1,439,706)
Transactions with the soleshareholder 1,000 - - - - - - (1,439,706) (1,438,706) - (1,438,706)
Profit for the year - - - - - - - 1,110,432 1,110,432 - 1,110,432
Other comprehensive income - 23 636 - (363,623) (15) (16,811) - (379,790) - (379,790)
Total comprehensive income for theyear - 23 636 - (363,623) (15) (16,811) 1,110,432 730,642 - 730,642
Derecognized revaluation reserve - - - - (19,003) - - 19,003 - - -
Other changes in equity - - - - - - - (305) (305) - (305)
Balance on 31 December 2023 3,463,942 2,059,589 1,212 (1) 10,109,838 5 (204,090) 2,906,199 18,336,694 (26) 18,336,668

Signed with electronic signature Signed with electronic signature
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025.
The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May 2025 and signed on its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Bulgarian Energy Holding EAD
CONSOLIDATED STATEMENT OF CASH FLOWS
For the year ending 31 December 2024
7
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Valentin Nikolov Marieta Velikova
CEO Chief Accountant
Prepared on 15 May 2025. The consolidated financial statements were approved for issue by resolution of the Board of Directors on 29 May
2025 and signed on its behalf on 30 May 2025.
The accompanying notes from 1 to 43 are an integral part of these consolidated financial statements.
With the independent auditors’ report:
Grant Thornton Ltd., audit firm, reg. No.032 Zaharinova Nexia Ltd., audit firm, reg. No.138
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Manager Dimitrina Zaharinova, Manager
Signed with electronic signature
Stoycho Milev, registered auditor, responsible for the audit
Signed with electronic signature
Silvia Dinova, registered auditor, responsible for the audit
Notes 2024 2023
BGN’000 BGN’000
Cash flows from operating activities
Cash receipts from customers, including: 8,307,413 10,712,766
Cash receipts from sales of electricity 5,801,975 7,009,329
Cash receipts from sales of natural gas and related services 2,288,634 3,267,804
Cash receipts from sale of lignite (coal) 157,226 278,749
Cash receipts from other sales 59,578 156,884
Proceeds from the Security of the Electricity System Fund 1,114,115 1,844,434
Payments to the Security of the Electricity System Fund (486,345) (711,064)
Proceeds for natural gas deliveries compensation 156,775 -
Payments to suppliers (4,896,218) (6,933,332)
Payments to personnel and social security institutions (1,390,573) (1,299,873)
Payments to state funds (215,913) (407,573)
Interest paid (164,979) (130,505)
Payments of fees, commissions and others (13,124) (23,576)
Other payments, net, including: (831,016) (1,224,095)
Income tax paid (132,787) (162,949)
Payments to the state budget (657,728) (967,166)
Other payments for operating activities (40,501) (93,980)
Net cash flows from operating activities 1,580,135 1,827,182
Cash flows from investment activities
Payments for property, plant and equipment and intangible assets (1,123,228) (990,347)
Acquisition of equity accounted investments - (3,953)
Acquisition of/(Disposal of) Subsidiaries, net of Cash (Paid)/Received - 41
Proceeds from sales of property, plant and equipment 3,229 71
Interest received 16,035 4,785
Dividends received and other proceeds from equity accounted investments 22,075 10,473
Financing of non-current assets 43,136 16,404
Cash provided as collateral (1,446) (31,929)
Proceeds from cash provided as collateral and deposits 86,768 76,448
Cash provided as deposits (375,000)
Proceeds from interest on deposits and cash provided as collateral 17,731 12,776
Net cash flows used in investing activities (1,310,700) (905,231)
Cash flows from financial activities
Proceeds from bank loans 29 758,073 153,764
Repayment of bank loans 29 (849,313) (291,472)
Lease payments 29 (1,136) (1,255)
Payments for issued bank guarantee - (702)
Dividends paid 18.2 (280,529) (1,439,706)
Net cash flows used in financing activities (372,905) (1,579,371)
Net change of cash and cash equivalents (103,470) (657,420)
Cash on 1 January 3,634,166 4,291,586
Gross amount of cash on 31 December 3,530,696 3,634,166
Effect from expected credit losses (6,119) (12,118)
Cash on 31 December 27 3,524,577 3,622,048
including cash in disposal groups (102) (102)
Cash for continuing operations on 31 December 27 3,524,475 3,621,946

Signed with electronic signature Signed with electronic signature
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
8
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
1. Corporate information

The consolidated financial statements of Bulgarian Energy Holding EA D (BEH EAD, the parent company) and its

subsidiaries (the Group) for the year ending 31 December 2024 were approved for issue by a Decision of the Board

of Directors with Protocol №38-2025/ 29.05.2025.

The Group`s main activities comprise:

- The production, extraction, transmission, storage, management, distribution, sale and/or purchase of natural

gas, electricity, heat, coal, as well as all other types of energy and raw materials, used for production;

- The organization of power exchange market for trading in the field of energy and energy consumption;

- investment activity in the field of energy.

The number of employees in the system of Bulgarian Energy Holding EAD as of 31 December 2024 is 19,066

employees (31 December 2023: 19,604 employees).

The parent company Bulgarian Energy Holding EAD is a so le proprietorship trading company established in the

Republic of Bulgaria. The company is the successor of the Neft i Gas (Oil and Gas) State Company, founded in 1973,

renamed in December 1975 to Gazosnabdyavane (Gas Supply). In accordance with the Decree on Business Activities,

in the beginning of 1990, the Company was renamed to Bulgargaz. Bulgargaz was transformed into a sole -owner

joint-stock company by order of the Council of Ministers of 12 May 1993. With a transformation plan dated 27

October 2006 and annexes thereto, Bulgargaz EAD was transformed into Bulgargaz Holding EAD by establishing

two sole proprietorships - Bulgartransgaz EAD and Bulgargaz EAD under the terms of Article 262 (d) of the

Commercial Law. Bulgartransgaz EAD and Bulgargaz EAD are legal successors of the respective portion of the

property (rights and obligations) of Bulgargaz Holding EAD. The transformation was registered in the court with

decision No.45 dated 15 January 2007 of the Sofia City Court.

With protocol No.РД-21-305 dated 18 September 2008 of the Minister of Economy and Energy the company name

was changed from Bulgargaz Holding EAD to Bulgarian Energy Holding EAD and the capital through was raised

through an in-kind contribution at par value of all shares of the capital of Natsionalna Elektricheska Kompania EAD,

NPP Kozloduy EAD, TPP Maritsa East 2 EAD and Mini Maritsa Iztok EAD.

The headquarters of Bulgarian Energy Holding EAD are in the Republic of Bulgaria, Sofia city -1000, Oborishte

District, 16 Veslets Str.

The registered address is the same : Bulgaria, Sofia city-1000, Oborishte District, 16 Veslets Str. The main place of

business of the parent company is in the city of Sofia.

The scope of operation of the Bulgarian Energy Holding EAD is acquisition, evaluation and sale of shares in

commercial companies operating in the fields of production, extraction, transmission, transit, storage, management,

distribution, sale and/or purchase of natural gas, electricity, thermal energy, coal, as well as and all kinds of energy

and raw materials for production and participation in the management of such companies, their financing, acquisition,

evaluation, issuance and sale of bonds, acquisition, evaluation and sale of patents, sub licensing of the use o f patents

of the aforementioned companies, as well as carrying out of its own production or commercial activity.

As of 31 December 2024, Bulgarian Energy Holding EAD has been managed by a Board of Directors (BOD) with the

following members: Veselina Lachezarova Kanatova-Buchkova – Chairperson of the Board of Directors, Kalin

Boyanov Filipov – Vice-Chairperson of the Board of Directors, Valentin Aleksiev Nikolov - Executive Member,

Galina Tsvetanova Todorova - Executive Member, and Ivo Ivanov Todorov – Member of the Board of Directors. The

Company is represented by the Executive Directors.

The sole and ultimate owner of the parent company is the Bulgarian state through the Minister of Energy.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
9
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
As of 31 December 2024, the subsidiaries, joint ventures and associates included in the consolidated annual financial

statements are as follows:

Company Country of incorporation Main activity 31 December 2024 31 December 2023
% %
Subsidiaries
Natsionalna Elektricheska Kompania EAD Bulgaria generation and public supplier of electricity 100% 100%
Bulgargaz EAD Bulgaria public supply of natural gas 100% 100%
Bulgartransgaz EAD Bulgaria storage and transmission of natural gas 100% 100%
Bulgartel EAD Bulgaria implementation of telecommunications 100% 100%
NPP Kozloduy EAD Bulgaria generation of electricity and thermal energy 100% 100%
TPP Maritsa East 2 EAD Bulgaria generation of electricity and thermal energy 100% 100%
Mini Maritsa-Iztok EAD Bulgaria coal extraction and sale 100% 100%
Electricity System Operator EAD Bulgaria transmission of electricity 100% 100%
National Energy Operator EAD Bulgaria Construction of projects and subsequent operation of systems for storage and utilization of electricity from RES 100% 100%
Minproekt EAD Bulgaria Design, research and development engineering activity 100% 100%
Bulgartel Skopje DOOEL Macedonia implementation of telecommunications 100% 100%
HPP Kozloduy EAD Bulgaria Generation and distribution of electricity from a hydroelectric power plant 100% 100%
Interpriborservice OOD - in bankruptcy Bulgaria installation and maintenance of automated systems 63.96% 63.96%
NPP Kozloduy – New Builds EAD Bulgaria operation of a nuclear facility for generation of electricity 100% 100%
NPP Construction Supervision EOOD Bulgaria assessing the compliance of investment projects and exercising construction supervision in design and construction 100% 100%
NPP Service LTD Bulgaria repair of general and special purpose machines and equipment construction and operation of an electronic 100% 100%
Balkan Gas Hub EAD Bulgaria platform for trade with natural gas, energy products, green and white certificates, 100% 100%
ESO Engineering EOOD Bulgaria carbon-gas emissions construction of technologies and projects for energy facilities and project management 100% 100%
ESO Proekt EOOD Bulgaria conceptual projects in accordance with the Spatial Development Act, consulting activity 100% 100%
ECO Charge EAD Bulgaria Construction, commissioning, operation and maintenance of electric energy and hydrogen charging systems, hydrogen production systems, development of software products, design and consulting activities etc. 100% -

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
10
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Company Country of incorporation Main activity 31 December 2024 31 December 2023
% %
Joint companies
ICGB AD Bulgaria construction and operation of a gas transmission system 50% 50%
South Stream Bulgaria AD Bulgaria construction and operation of a gas transmission system 50% 50%
Southeast Electricity Network Coordination Center (SeleNe CC) Greece Regional Security Coordinator for Southeast Europe with the purpose of 33.33% 33.33%
Gastrade S.A. Greece maintaining the electricity system Development, exploitation, operation and management of natural gas systems 20% 20%
Associated companies ContourGlobal Maritsa Iztok 3 AD Bulgaria generation of electricity 27% 27%
Contour Global Operations Bulgaria AD Bulgaria operation and maintenance of a thermal power plant 27% 27%
ZAD Energy AD Bulgaria insurance and reinsurance 48.08% 48.08%
Allianz Bulgaria Pension Company AD Bulgaria Pensions 34% 34%
Hydro Power Company Gorna Arda AD Bulgaria construction of hydroelectric power plants 24% 24%

2. Statement of compliance with IFRS Accounting Standards and application of the going concern principle

These consolidated financial statements of the Group have been prepared in accordance with IFRS Accounting

Standards as developed and published by the International Accounting Standards Board (IASB) and adopted by the

European Union (EU). Within the meaning of paragraph 1, item 8 of the Additional Provisions of the Accounting Act

applicable in Bulgaria, they are the International Accounting Standards (IAS) adopted in accordance with Regulation

(EC) 1606/2002 of the European Parliament and the Council, including the International Accounting Standards,

International Financial Reporting Standards and related interpretations, subsequent amendments to those standards

and related interpretations, future standards and related interpretations issued or adopted by the International

Accounting Standards Board.

These consolidated financial statements are presented in Bulgarian Leva (BGN), which is the functional currency of

the parent company. All amounts are reported in thousands of BGN (including comparative information for 2023),

unless otherwise stated.

The parent company Bulgarian Energy Holding EAD has prepared and presented an individual financial statement for

the year ending 31 December 2024, where investments in subsidiaries, associates and joint ventures are presented at

acquisition cost. The separate financial statements of Bulgarian Energy Holding EAD were approved for issue by

resolution of the Board of Directors of BEH EAD on 2 May 2025 and signed on 9 May 2025.

Impact of the ongoing military conflict between Russia and Ukraine

The nearly two-year-old military conflict between Russia and Ukraine continues to have an economic impact on all

sectors of the global economy. Multiple countries are imposing additional sanctions on assets and operations owned

by the Russian state and certain individuals.

In order to avoid ambiguities regarding the effect of the imposed sanctions and restrictions, the Group's management

has made a review of activities, counterparties and economic relationships that could expose the Group to significant

risk. As of the date of approval of the financial statements, they can be summarized as follows:

- The natural gas market in Europe, and in particular in Bulgaria and the region, has undergone significant

changes over the last 3 years, mainly as a result of the suspension of supplies from Russia to some European

countries, including Bulgaria. This led to active actions and efforts by EU countries to reduce energy
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
11
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
dependence on Russia. In parallel, natural gas consumption in the European Union is also decreasing, with

most member states reported to have met the European Commission's target of a 15% reduction in natural

gas consumption compared to average consumption over the previous 5 years for the period August 2022 to

March 2024. According to Eurostat, the achieved decrease in natural gas consumption for Bulgaria is around

6% in 2024 compared to consumption in 2023. In 2024, there is a downward trend in natural g as prices on

European gas markets due to:

• Filled gas storage facilities;

• Provision of alternative supplies of liquefied natural gas;

• Construction of new LNG re-gasification terminals for liquified gas at more European ports;

• Relatively warm winter;

• Restriction of economic activity in Asian markets;

• Continued local and regional supplies of Russian natural gas quantities.

- A serious risk for the Group from the conflict between Ukraine and Russia may arise in relations with certain

counterparties. The Group's key supplier is the Russian company AO TVEL, with which the parent company

has a long-term contract for the supply of fresh nuclear fuel (FNF) until 2025. Two deliveries of FNF were

made in accordance with the terms of Appendix 52 to the contract with AO TVEL. On 25 March 2025, the

first delivery of 42 TVSA-12 cartridges and 12 pcs. of PP SUS, and on 23 April 2025, the second delivery

of 42 TVSA-12 cartridges was made. On 10 April 2025, 42 RWFA nuclear fuel assemblies manufactured by

Westinghouse Electric Sweden AB were delivered. This will ensure supplies of FNF for continuous

operation;

- Another negative effect is the inability to ship spent nuclear fuel to Russia for technological storage and

reprocessing under contract with the company FGUP PO MAYAK. The removal of SNF shall be carried out

in accordance with the Safe Use of Nuclear Energy Act, its implementing regulations and the national policy

defined in the Strategy for Spent Nuclear Fuel and Radioactive Waste Management until 2030. At the time

of preparation of this report, the subsidiary NPP Kozloduy EAD is behind the plans for SNF removal for the

period from 2021 to 2024. The NPP Kozloduy site has a ‘wet’ type spent nuclear fuel storage facility (SNF

storage facility) where spent nuclear fuel is stored in pools under water;

- The group has contractual relations also with other Russian and Ukrainian counterparties for the supply of

specific spare parts and long term manufacturing equipment and specific services for the plant. In the event

that no other alternatives are found, there is a serious risk of delay and/or non-performance of key supplies

and services. Deliveries from counterparties from Ukraine whose production is temporarily or permanently

suspended (Kharkov) are not urgent and pressing. The spare parts and equipment they produce have

analogues and negotiations are currently underway with other contractors.

With decision No.695 of the Council of Ministers dated 23.09.2022 and No.200 dated 22.03.2023, the Council of

Ministers approved a derogation from the sanctions of the European Union, which prohibit the import of certain parts,

materials and services in connection with the war in Ukraine. The government granted a derogation so that the NPP

Kozloduy could purchase the necessary materials and spare parts to ensure the planned annual maintenance and

operation of the nuclear plant. In addition, the management of the Group, with the support of the Ministry of Energy,

continued with the process of selecting new contractors.

As the situation is extremely dynamic, the management of BEH EAD refrains from specific and categorical

assessments regarding the impact of the war on the future financial situation and the results of its activities in 2025.

The event already has reported effects on the national economy, inflation processes, the prices of energy resources,

household expenditure and disrupted supply chain elements, which in all cases are negative. This, in turn, could lead

to a change in the carrying amounts of the Group's assets, which in the financial statements are determined by making

a number of judgments and assumptions by management and taking into account the most reliable information

available as of the date of the estimates, as well as have an impact on the forecasts made for the future development,

cash flows and results of the Group's operations.

Climate-related matters

In 2024, the Group presents information on climate-related matters, and considers such reporting as a long-term

commitment, which will be further developed and expanded in the future. The legislation, the regulatory bodies, the

partners of the Group and the users of non-financial information pay great attention to the climate change. The

European Union adopted the European Green Deal as a transition to more sustainable economic and financial system
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
12
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
and in the following years the detailed requirements for reporting the climate change will become applicable as a part

of the European standards for reporting sustainability. The group is in the process of analyzing the business and the

activities carried out and their degree of impact, possible risks and ways to actively participate in decision-making

related to climate change. As of 31 December 2024, the Group has not identified any major risks caused by the climate

changes that could have a direct negative and material impact on the consolidated financial statements, but in the long

term may adversely affect the revenues of the Coal segment companies and their profits or losses.

Environmental, social and governance (ESG) rating

For a public company actively involved in raising funds through capital markets, such as Bulgarian Energy Holding

EAD, attracting investor interest is associated with strict compliance with of social, governance and environmental

aspects of activities within the holding. The ESG rating is awarded after thorough analysis of the rules and policies of

a particular company, related to the ecological, social, and governance aspects; after assessing the overall impact and

environmental footprint left by the company through its business activities, as well as after a thorough review of the

available public information on the corporate website, articles, and news about the company

The rating was assigned by Sustainalytics – a company, part of the Morningstar structure, which is a globally

recognized supplier of ESG researches, ratings, and data The corporate ESG assessment given to Bulgarian Energy

Holding EAD is a one-time assessment that is valid at the time of its assignment and it is prepared on the basis of the

information provided by Bulgarian Energy Holding EAD. The ESG risk assessment report includes a general ESG

risk rating, an assessment of the Company’s exposure and an assessment of its governance. Exposure refers to the

extent to which the Company is exposed to various material risks related to environmental, social, and governance

aspects. The governance assessment shows how well the Company manages these aspects.

As of 31 December 2024, BEH Group's ESG rating, determined by Sustainalytics is 35.5 points (“high risk”). BEH's

ESG Risk Score, which refers to the extent to which the company is exposed to various material risks related to

environmental, social, and governance aspects, is 53.8 points (“medium risk”). The governance score reflecting how

well the company manages these aspects is 36.8 points (“average performance”).

Going concern principle

These consolidated financial statements have been prepared in accordance with the going concern principle, taking

into account the possible effects of the continuing military conflict between the Russian Federation and the Republic

of Ukraine, the Bulgaria Recovery and Resilience Plan approved by EC and the dynamics of the energy market

worldwide and in Bulgaria. The future development of the Group is related to the implementation of the energy

strategy of the country to increase and ensure security of energy supply, the implementation of priority energy projects

and ensuring the financial participation of our country in them. The management has analyzed the validity of the going

concern principle, taking into account the plans, estimates and the business programs of the companies within the

Group. As a result, they have concluded that the application of the going concern principle is appropriate.

3. Changes in the accounting policy

3.1. New standards, amendments and interpretations to IFRS effective from 1 January 2024

Amendments to IAS 1 Presentation of Financial Statements: Classification of liabilities as current and non -

current, effective from 1 January 2024, adopted by the EU

The amendments in the classification of liabilities as current or non-current affect only the presentation of liabilities

in the statement of financial state, but not their amount, the time of assets, liabilities, income or expenses, or the

information recognition, which the companies disclose concerning these items. The amendments are intended to

clarify the following:

• classification of liabilities as current or non-current should be based on rights existing at the end of the

reporting period, and all affected paragraphs of the standard now use the same term, namely the ‘right’ to

defer settlement of the liability by at least twelve months. It is expressly stated that only available rights ‘at

the end of the reporting period’ should affect the classification of the liability;

• classification is not affected by the entity's expectation of whether it will exercise its right to defer settlement

of the liability; and

• the liabilities settlement may be effected by transferring cash, equity instruments, other assets or services to

the counterparty.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
13
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Amendments to IAS 1 Presentation of Financial Statements: Non-current liabilities linked to financial

indicators, effective from 1 January 2024, adopted by the EU

IAS 1 is amended as follows:

• It is specified that if the right to defer settlement for at least 12 months is subject to conditions being met by

the entity after the reporting period, then those conditions shall not affect whether the right to defer settlement

exists at the end of the reporting period (the reporting date) for the purposes of classifying the liability as a

current or a non-current one; and

• for non-current liabilities, subject to conditions, the entity is required to disclose information about:

o the conditions (e.g. the nature and date by which the entity must comply with the condition);

o whether the entity would have complied with the conditions based on the circumstances at the

reporting date; and

o whether and how the entity expects to comply with the conditions by the date on which the financial

measures are to be calculated under the contract.

Amendments in IFRS 16 Leases: Lease liabilities on sale and leaseback effective from 1 January 2024, adopted

by the EU

The amendments to IFRS 16 require an entity that is a seller-lessee to subsequently measure lease liabilities arising

from a leaseback in a way that does not recognise any amount of profit or loss that relates to the right of use that it

retains. The new requirements do not prevent the seller-lessee from recognizing the gain or loss associated with the

partial or full termination of the lease contract in the current profit or loss. The amendments to IFRS 16 do not prescribe

specific measurement requirements for lease liabilities arising from a leaseback.

Amendments to IAS 7 Statement of cash flows and IFRS 7 Financial instruments: Disclosures: Agreements for

funding suppliers, effective from 1 January 2024, adopted by the EU

The amendments to IAS 7 and IFRS 7 add disclosure requirements as well as guidance within existing disclosure

requirements related to the provision of qualitative and quantitative information about supplier obligation financing

arrangements. These amendments add two disclosure objectives that will require entities to disclose in the notes

information that enables users of financial statements to assess how supplier financing arrangements affect an entity's

liabilities and cash flows and to understand the effect of supplier financing arrangements on an entity's exposure to

liquidity risk and how an entity may be affected if the arrangements are no longer available to it.

3.2. Standards, amendments and clarifications that have not yet entered into force and have not been applied

by the Group from an earlier date

The following standards, amendments and interpretations to existing standards that are not effective or have not been

adopted by the EU for the financial year beginning 1 January 2024 and have not been applied by the Group from an

earlier date:

IFRS 18 Presentation and Disclosures in Financial Statements, effective 1 January 2027, not yet adopted by the

EU

IFRS 18 aims to improve the way entities disclose their financial statements, with a focus on financial performance

information in the income statement. IFRS 18 is accompanied by limited amendments to the requirements in IAS 7

Statement of Cash Flows. IFRS 18 is effective from 1 January 2027. Companies are permitted to apply IFRS 18 before

that date. IFRS 18 replaces IAS 1 Financial statements presentation. The requirements described in IAS 1 that have

not changed have been transferred to IFRS 18 and other standards. IFRS 18 will affect all entities in all industries.

Although IFRS 18 will not affect how companies measure financial performance, it will affect how companies present

and disclose financial performance. IFRS 18 aims to improve financial reporting by:

• requirement for additional defined subtotals in the profit and loss statement; The addition of defined subtotals

to the profit and loss statement facilitates the comparison of entities' financial performance and provides a

consistent point of reference for investor analysis.

• requirement to disclose performance measures determined by management. Requiring companies to disclose

information on management-defined performance indicators increases discipline in their use and

transparency in their calculation.

• adding new principles for grouping (aggregation and disaggregation) information. Specifying requirements

for whether information should be in the main financial statements or in the notes and providing principles

for the level of detail required improves the effective communication of information.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
14
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
At the date of approval of this separate financial statement, the following new standards, amendments and

interpretations to existing standards have also been issued but are not effective or adopted by the EU for the financial

year beginning 1 January 2024 and have not been previously adopted by the Group. They are not expected to have a

material impact on the Company's financial statements:

- Amendments to IAS 21 Effects of Changes in Foreign Exchange Rates: No convertibility, effective from 1

January 2025, not yet adopted by the EU;

- Annual improvements, effective from 1 January 2026, not yet adopted by the EU;

- Amendments to the classification and measurement of financial instruments (amendments to IFRS 9 and

IFRS 7), effective from 1 January 2026, not yet adopted by the EU;

- IFRS 19 Subsidiaries without public reporting: Disclosures, effective from 1 January 2027, not yet adopted

by the EU.

4. Material Accounting Policy Information

4.1 General provisions

The most significant accounting policies applied in the preparation of these consolidated financial statements are set

out below.

These consolidated financial statements are prepared in accordance with the principles for valuing certain types of

assets, liabilities, income and expenses, in accordance with IFRS. The evaluation bases are disclosed in detail further

in the accounting policy to the consolidated financial statements.

It should be noted that accounting estimates and assumptions have been used in preparing the consolidated financial

statements. Although they are based on information provided to the management as of the date of preparation of the

consolidated financial statements, the actual results may differ from the estimates and assumptions made.

4.2 Presentation of the consolidated financial statements

These consolidated financial statements have been presented in accordance with IAS 1 “Presentation of Financial

Statements”.

The consolidated statement of financial position presents two comparative periods when the Group applies accounting

policies retrospectively, recalculates retrospectively positions in these consolidated financial statements or reclassifies

positions in the consolidated financial statements.

4.3 Basis for consolidation

The financial statements of the Group consolidate the financial statements of the parent company and all subsidiaries

as of 31 December 2024. Subsidiaries are all entities controlled by the parent company . Control is when the parent

company is exposed to, or has rights to, the variable return on its interest in the investee and has the potential to

influence that return by its powers over the investee. All subsidiaries prepare their financial statements for the reporting

period that ends on 31 December.

All intragroup transactions and balances are eliminated, including the unrealized gains and losses from transactions

between the companies in the Group. When the unrealized losses on intragroup sales of assets are eliminated, the

respective assets are reviewed for impairment from the Group’s point of view. The amounts reported in the financial

statements of the subsidiaries have been adjusted where necessary to ensure their compliance with the accounting

policy applied by the Group.

Profit or loss and other comprehensive income of subsidiaries acquired or disposed of during the year are recognized

from the date of acquisition or until the date of disposal.

Non-controlling interest, presented as part of equity, represents the share of profit or loss and the net assets of the

subsidiary that are not held by the Group. The total comprehensive income or loss of the subsidiary is attributed to the

owners of the parent and the non-controlling interest based on their relative share in the equity of the subsidiary.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
15
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
If the Group loses control over a subsidiary, any investment retained in that entity is recognized at fair value at the

date that control is lost, and the change in the carrying amount is recognized in the profit or loss. The fair value of

each investment retained in the entity as of the date when control is lost is regarded as the fair value of the financial

asset on initial recognition in accordance with IFRS 9 Financial Instruments or, when appropriate, as the cost of an

investment in an associate or a jointly controlled entity upon initial recognition . Furthermore, all amounts recognized

in other comprehensive income with respect to that subsidiary are accounted for on the same basis as if the Group had

directly disposed of the related assets or liabilities (e.g. reclassified in profit or loss or carried directly to retained profit

in accordance with the requirements of the respective IFRS).

The profit or loss from the derecognition of an investment in a subsidiary is the difference between the fair value of

the consideration received and the fair value of any retained investment in the former subsidiary and the carrying

amount of the subsidiary's assets (including goodwill) and any non-controlling interest.

4.4 Business combinations

All business combinations are accounted for using the purchase method. The consideration transferred in a business

combination is measured at fair value calculated as the sum of the fair values of the assets at the date of the acquisition,

transferred by the acquirer, the liabilities to the former owners of the acquiree assumed by the acquirer and the equity

interests issued by the Group. The transferred consideration includes the fair value of any assets and liabilities arising

as a result of the contingent considerations. The acquisition-related costs are accounted for in the profit or loss in the

period in which the costs are incurred.

The purchase method includes the recognition of the acquiree's identifiable assets and liabilities including contingent

liabilities, whether or not they were recognized in the acquiree's financial statements prior to the business combination.

Upon initial recognition, the assets and liabilities of the acquired subsidiary are included in the consolidated statement

of financial position at their fair value, which serves as a basis for subsequent measurement in accordance with

Group’s accounting policies.

For each business combination, the Group measures each non-controlling interest in the acquiree, which represents a

share of its equity and entitles it to a liquidation share, either at fair value or in proportion to the non -controlling

interest in the acquiree's identifiable net assets. The other types of non-controlling interests are measured at fair value

or, if applicable, on a basis specified in another IFRS.

Goodwill is recognized after all identifiable intangible assets have been identified. It represents the excess of the fair

value of the transferred consideration at the acquisition date and the amount of each non-controlling interest in the

acquiree, and in a business combination achieved in stages, the fair value at the acquisition date of Group’s previously

held interest in the acquiree, over the fair value of the identifiable net assets of the acquiree at the acquisition date.

Any excess of the fair value of the identifiable net assets over the above calculated amount is recognized in the profit

or loss immediately after the acquisition.

In a business combination achieved in stages, the Group remeasures the previously held equity interest in the acquiree

at fair value at the acquisition date (i.e. at the date when control was obtained) and recognizes the resulting profit or

loss, if any, in profit or loss. The amounts recognized in other comprehensive income from equity interest in the

acquiree prior to the date of obtaining control, are recognized on the same basis as if the Group had disposed directly

from the previously held equity interest.

If the initial accounting of the business combination is not completed by the end of the reporting period in which the

combination occurs, the Group reports provisional amounts for the items for which the accounting has not been

completed. During the measurement period, which may not exceed one year from the date of acquisition, the Group

retrospectively adjusts these provisional amounts or recognizes additional assets or liabilities to reflect new

information received about the facts and circumstances that existed at the acquisition date and, if known, would have

affected the estimate of the amounts recognized at that date.

All contingent considerations owed by the acquirer arerecognized at fair value as of the acquisition date and are

included as part of the consideration transferred in exchange for the acquired entity. Subsequent changes in the fair

value of the contingent considerations classified as an asset or liability are recognized in accordance with IAS 39

Financial Instruments: Recognition and Measurement either in profit or loss or as a change in other comprehensive

income. If the contingent consideration is classified as equity, it is not revalued until its final settlement within the
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
16
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
equity. Changes in the fair value of contingent consideration that represent provisional amounts during the

measurement period are presented retrospectively at the expense of goodwill.

In case of a commitment to a sales plan involving loss of control over a subsidiary, the Group classifies all consolidated

assets and liabilities of that subsidiary as held for sale, nothwithstanding whether or not it will retain a non-controlling

interest in its former subsidiary after the sale. Assets (and disposal groups) classified as held for sale are presented

separately in the consolidated statement of financial position and are measured at the lower of their carrying amount

(initially, cost of acquisition) and their fair value less expected direct selling expenses (net selling price). Any

impairment loss is allocated among these assets of an disposal group.

4.5 Transactions with non-controlling interests

Changes in the Group’s share in the equity of a subsidiary that do not result in loss of control are treated as transactions

with owners of the Group. The carrying amounts of Group’s share and of the non -controlling interests are adjusted to

reflect changes in their relative share in the equity of the subsidiary. Any difference between the amount by which the

non-controlling interests are adjusted and the fair value of the consideration received or paid is recognized directly in

equity and is attributed to the owners of the parent company.

4.6 Segment reporting

The management determines the operating segments on the basis of the main products and services offered by the

Group:

- Electricity segment

- Natural Gas segment

- Coal segment

- Administrative activity segment.

The Administrative Activity segment combines the activities of the non-energy companies, the holding and the

subsidiary, from the telecommunications sector.

Each of these operating segments is managed separately since various technologies, resources, and distribution

approaches are used for each product or service. All transactions between the segments are conducted at prices

corresponding to transactions between independent parties, where appropriate, while the transaction in the Electricity

and Natural Gas segments are reported at prices set by the regulatory body Energy and Water Regulatory Commission

(EWRC). In the reporting per segment, the Group applies a measurement policy consistent with the measurement

policy used in the consolidated financial statements.

Financial revenue and expenses are not included in the results of the operating segments, which are regularly reviewed

by the persons responsible for making operational decisions.

4.7 Investments in joint ventures and associates

A joint venture is a contractual arrangement by the virtue of which the Group and other independent parties engage

in a business activity, which is the subject of joint control and the parties in the joint venture are entitled to the net

assets of the entity. Investments in joint ventures are reported using the equity method.

Associates are those entities over which the Group has significant influence, but which are neither subsidiaries nor

joint ventures. Investments in associates are initially recognized at cost price and subsequently reported using the

equity method. The cost price of the investment includes the costs incurred at its acquisition.

Goodwill or fair value adjustments of the Group’s share in the associate are included in the cost of the investment.

All subsequent changes in the amount of Group’s interest in the equity of the associate are recognized in the carrying

amount of the investment. Changes due to the profit or loss realized by the associate are reflected in the consolidated

statement of profit or loss of the line "Share of profit in associates and jointly controlled entities". These changes

include the subsequent depreciation or impairment of the fair value of the assets and liabilities of the associate

determined on acquisition.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
17
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Changes in the other comprehensive income of the associate, as well as in items recognized directly in the equity of

the associate, are recognized in the other comprehensive income or in the equity of the Group, respectively. In cases

where the Group’s share in the realized losses of the associate exceeds the amount of its interest in the associate,

including unsecured receivables, the Group does not recognize its share of the associate's further losses unless the

Group has assumed contractual or actual obligations or has made payments on behalf of the associate. If the associate

subsequently makes a profit, the Group recognizes its share to the extent that the share of the profit exceeds the

cumulative share of losses that were not previously recognized.

Unrealized profits and losses on transactions between the Group and its associates and joint ventures are eliminated

to the extent of Group’s interest in those entities. When unrealized losses on the sale of assets are eliminated, the

respective assets are tested for impairment from the Group’s point of view.

The amounts recognized in the financial statements of associates and joint ventures are recalculated, where necessary,

to ensure their compliance with Group’s accounting policies.

In case of loss of significant influence over an associate, the Group measures and recognizes any retained investment

at its fair value. Any difference between the carrying value of the investment in the associate in the event of a loss of

significant influence and the amount of the fair value of the retained interest and the proceeds of the derecognition is

recognized in profit or loss.

If the share interest in the associate is reduced but without loss of significant influence, only a proportionate part of

the amounts recognized in other comprehensive income is reclassified in profit or loss.

4.8 Foreign currency transactions

Transactions in foreign currency are reported in the functional currency of the respective company by the Group at

the official exchange rate as of the date of the transaction (the announced fixing of the Bulgarian National Bank). The

foreign exchange gains and losses resulting from the settlement of such transactions and the revaluation of foreign

currency monetary items at the end of the reporting period are recognized in profit or loss.

Non-monetary items that are measured at historical cost in a foreign currency are translated using the exchange rates

as of the dates of the transactions. Non-monetary items measured at fair value in a foreign currency are translated at

the exchange rate at the date that the fair value was determined.

The functional currency of the separate companies of the Group was not changed during the reporting period.

When consolidated, all assets and liabilities are translated into BGN at the closing exchange rate as of the date of the

consolidated financial statements. Income and expenses are translated into the presentation currency of the Group at

the average exchange rate for the reporting period. Foreign exchange differences lead to an increase or decrease in

other comprehensive income and are recognized in the translation reserves in the equity. On disposal of a net

investment in a foreign operation, the accumulated foreign exchange differences from revaluations recognized in

equity are reclassified in profit or loss and recognized as part of the profit or loss from the sale. Goodwill and

adjustments related to the determination of fair values at the acquisition date are treated as assets and liabilities of the

foreign enterprise and are translated into BGN at the closing exchange rate.

4.9 Revenue recognition

4.9.1. Revenues from contracts with customers

Recognition of revenue under contracts with customers

Revenue from contracts with customers is recognized when the control of the goods and/or services promised in the

contract is transferred to the customer in an amount that reflects the consideration to which the Group expects to be

entitled in exchange for those goods or services.

The control is transferred to the customer when (or as) he/she meets the obligation to perform, according to the terms

of the contract, by transferring the promised goods or services to the customer. An asset (good or service) is transferred

when (or as) the customer gains control over that asset.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
18
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Evaluation of a contract with a customer

A contract with a customer exists only when upon its entry into force: (a) it has a commercial nature and a motive, (b)

the parties have approved it (verbally, in writing or on the basis of "established and generally recognized business

practice") and are committed to perform it, (c) the rights of each party can be identified; and (d) the terms of payment

can be identified; and (e) the remuneration to which the Group is entitled in the performance of its obligations is likely

to be received.

In the initial evaluation of its contracts with customers, the Group assesses whether two or more contracts should be

considered in their combination and accounted for as one, and whether the promised goods and / or services in each

individual and / or combined contract should be accounted for. as one and / or more performance obligations.

Any promise to transfer goods and / or services that are distinguishable (in themselves and in the context of the

contract) is accounted for as a single performance obligation.

The Group recognizes revenue for each separate performance obligation at the level of an individual contract with a

customer by analyzing the type, term and conditions for each specific contract. In the case of contracts with similar

characteristics, revenue is recognized on a portfolio basis only if grouping it in a portfolio would not have a materially

different effect on the financial statements.

Contracts with customers usually involve a single performance.

When another (third) party is taking part in the performance obligations, the Group determines whether it acts as a

principal or agent by assessing the nature of its promise to the customer: to independently provide the specified goods

or services (principal) or to arrange for another party to provide them (agent). The Group is the principal and

recognizes as income the gross amount of remuneration if it controls the promised goods and / or services before

transferring them to the client. If the Group does not receive control over the promised goods and/or services and its

only obligation is to arrange for a third party to provide those goods and/or services, than the Group is an agent and

recognizes the proceeds of the transaction in at the net amount it retains for the provided services as an agent.

The Group has come to the conclusion that it is the principal of its main contracts with customers.

Estimation of revenue under contracts with customers

Revenue is measured on the basis of the transaction price specified for each contract. When setting the transaction

price, the Group takes into account the terms of the contract and its usual business practices.

The transaction price is the amount of the consideration that the Group expects to be entitled to in exchange for the

transfer of the promised goods or services to the customer, except for amounts collected on behalf of third parties (e.g.

value added tax). The remuneration promised in the contract with the customer may include fixed amounts, variable

amounts, or both.

When (or as) a performance obligation is met, the Group recognizes as income the cost of the transaction (which

excludes estimates of variable remuneration containing limitations) that is attributable to that performance obligation.

The Group considers whether there are other promises in the contract that are separate performance obligations for

which a portion of the transaction price should be allocated.

When determining the transaction price, the impact of variable remuneration, the existence of significant components

of financing, non-monetary remuneration and the remuneration due to the customer are taken into account.

Performance obligations and recognition approach to main types of revenue under customer contracts

Sale of electricity

Revenue from the sale of electricity include the following:

‒ public procurement, including a special balancing group coordinator;

‒ trade in electricity;

‒ supply of electricity as a supplier of last resort, a special balancing group coordinator;
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
19
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The revenues from the sale of electricity are recognized over time, as the deliveries are a series of a separate good,

which is a promise to supply electricity that is essentially the same and has a uniform pattern of transfer to the

customer.

Revenue is recognized in the consolidated statement of profit or loss when the electricity is supplied through the

transmission and distribution networks to the end suppliers, the electricity distribution companies, the transmission

system operator (ESO EAD), the supplier of last resort, customers of the supplier of last resort. and on the free market.

Revenue from sales are recognized on the basis of electricity meter readings for consumed electricity or on registered

schedules.

The selling prices of the electricity realized by the Group can be: sale at a regulated price, sale at a fixed price under

a contract, sale on power exchange (fixed price under a certain transaction). The transaction price can be defined as a

fixed remuneration for the delivery of individual quantities of the series of goods (electricity).

Allocation of the transaction price to the performance obligations is made on the basis of unit selling prices (regulatory,

contractual or market).

At the end of each billing period, the Group measures its progress towards full settlement of the performance

obligation that is met over time. The measurement is done by confirming the trading schedules, i.e. an assessment is

made of the quantities of delivered energy, for which the Group recognizes revenues from supply of electricity, except

for the situations in which the company operates as an agent. Sales prices are fixed (regulated price, fixed contract

price, fixed price under a specific transaction) . The usual credit period is from 10 to 30 days. In certain cases, the

Group collects short-term advance payments from customers who do not have a significant component of funding.

The collected advance payments from the customers are presented in the consolidated statement of financial position

as liabilities under contracts with customers.

Revenue from access to the electricity transmission grid

The performance obligation is to provide access to the transmission grid. Revenue is recognized in the consolidated

statement of profit or loss when electricity is delivered through the electricity transmission network to the customers'

sites.

The performance obligation is met over time by the Group measuring the progress of the promised performance using

the practical expedient under paragraph B16 of IFRS 15. This practical expedient enables the Group to recognize

revenue equal to the amount it is entitled to invoice. As the transaction price is determined by access prices approved

by the regulator multiplied by the amount of energy received, which is measured by the commercial metering devices,

entered in the state register of the approved for the country types of commercial metering devices, the Group can

prove that the invoiced amount directly corresponds to the value the customer receives. The latter is a prerequisite for

the use of the "billing right" practical expedient.

Revenue from transmission of electricity through the electricity transmission grid

The performance obligation is to ensure the transmission of electricity. Revenue from the electricity transmission

service is recognized in the consolidated statement of profit or loss for the transmission of electricity through the

electricity transmission grid to the customers' sites.

The performance obligation is met over time by the Group measuring the progress of the promised performance using

the practical expedient under paragraph B16 of IFRS 15. This practical expedient enables the Group to recognize

revenue equal to the amount it is entitled to invoice. As the transaction price is determined by the transmission price

approved by the regulator multiplied by the amount of transmitted electricity, which is measured by commercial

metering devices, entered in the state register of approved for the country types of commercial metering devices, the

Group can prove that invoiced amount corresponds directly to the value the customer receives. The latter is a

prerequisite for the use of the "billing right" practical expedient.

Revenue from the sale of electricity from the balancing market

The performance obligation is to provide a balancing service. The performance obligation is met over time, and the

aggregated settlement statements for the relevant reporting period are recognized each month at the time the Group
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
20
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
receives confirmation by the market participants. The Group measures the progress of the implementation of the

promise using the practical expedient under paragraph B16 of IFRS 15.

Revenue from connection of sites to the electricity transmission network

Revenue from the grid connection service provided to customers in exchange for the transfer of sites built by them

and recognized as transmission grid assets is recognized in the current financial result for the year in which the

connection fee is invoiced.

Natural gas sales

The Group sells natural gas in two main directions, namely:

• on a regulated market - at prices regulated by EWRC;

• on the free market - at freely negotiated prices in several segments:

o - to customers directly connected to the gas transmission network;

o - on an organized stock market - in the country;

o - on an organized stock market - in countries where the Group has a Trading License

o - outside the organized stock market (domestic and international markets).

As a public supplier, the Group provides a service of public interest - supply of natural gas to a group of persons

specified in the Energy Act at prices approved by EWRC ("regulated prices"). The regulated prices are determined in

accordance with Ordinance No.2 of 19.03.2013 on the regulation of natural gas prices, issued by the State Commission

for Energy and Water Regulation, prom. SG No.33 dated 05.04.2013.

From 1 January 2020, the Group supplies natural gas at regulated prices only to end suppliers of natural gas and to a

person who has been issued a license for production and transmission of thermal energy (EA, art. 30, para. 1, item 7).

The Energy Act obliges the Group to supply natural gas to the heating and gas distribution companies, but they are

not obliged to purchase gas from the Group and may prefer other suppliers, as well as to purchase gas from the gas

exchange.

For all other customers connected to the gas transmission grid - production enterprises, thermal power plants,

greenhouses, etc. ("industrial customers"), the Group supplies natural gas at freely negotiated prices. According to the

contracts with customers at freely negotiated prices, the Group performs the function of natural gas trader under

competitive conditions.

The Group uses the following 5 steps to determine whether and how to recognize revenue:

1. Identifying the contract with a customer.

2. Identifying the performance obligations.

3. Determining the transaction price.

4. Allocation of transaction price to performance obligations.

5. Revenue recognition when performance obligations are satisfied.

The revenue is recognized either at a point in time or over time, when or until the Group satisfies performance

obligations by transferring promised goods or services to its customers.

The Group recognizes revenue for each separate performance obligation at the level of an individual contract with a

customer by analyzing the type, term and conditions for each specific contract. In the case of contracts with similar

characteristics, revenue is recognized on a portfolio basis only if grouping it in a portfolio would not have a materially

different effect on the financial statements.

Revenue from sale of natural gas for balancing

Balancing is of continuous and the customer receives and consumes the benefits at the same time. Revenue is

recognized over time as in the sale of natural gas described above. The compensation by the customer for the sale of
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
21
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
natural gas for balancing includes fixed amounts and is based on the price for sale of natural gas for the current month

plus the cost component for balancing, determined and fixed by the EWRC for the gas year.

There is no funding component in the sales of natural gas for balancing, as the payment for the sales is due within a

period of up to 20 - 25 days from the issuance of the invoice, which is in line with the market practice.

A receivable is recognized when the assets are delivered, as this is the moment when the right to remuneration becomes

unconditional and only the expiration of the time before the payment is due is required.

Access to and transmission of natural gas, balancing of the natural gas market, storage of natural gas, provision

of access to and use of an electronic platform for natural gas trading

Transit of natural gas to third countries, access and transmission of natural gas

Revenues from the transmission of natural gas to third countries include the transmission of natural gas from the

border with Turkey to the borders with Greece, Northern Macedonia and Serbia.

Revenues from access and transmission of natural gas include access and transmission of natural gas at entry and exit

points/zones on the national gas transmission network in the country, as well as exit and entry points/zones on the

transit gas transmission network.

Balancing the natural gas market

In connection with the Rules for balancing the natural gas market in force since 01.10.2017, the Group, in its capacity

as a balancer, performs trade balancing on the natural gas market, which is a compensation for differences between

the quantity of natural gas supplied by a given user of the gas transmission network at the entry points, and the quantity

of natural gas withdrawn by this user through the exit points of the network. The obligation of the balancer is to cover

the individual imbalances of the users of the gas transmission networks. The price for the balancing service is

determined by the terms and conditions of the Methodology for determining the daily imbalance fee and the balancing

neutrality fee, approved by the EWRC. The price-forming elements - the price of natural gas set by the public supplier,

the price for sale of natural gas to end suppliers of natural gas and to customers connected to the gas transmission

network, "small adjustment", which is a correction in the price of natural gas for balancing, expressed as a percentage,

applied with a positive or negative sign, depending on the sign of the imbalance in order to determine the daily

imbalance charges and imbalance charges calculated on a daily basis which the network user pays or rec eives

depending on the amount of its daily imbalance. In order to achieve neutrality from the balancing activity, the Group

charges a balancing neutrality fee, which can be a positive or negative value, depending on the distributed quantities

of natural gas at each entr /exit point/zone of the gas transmission system owned by the Group.

Natural gas storage

The activity "Natural gas storage" is carried out in the only underground gas storage facility in the country - Chiren

(Chiren UGS), owned by Bulgartransgaz EAD. Chiren UGS is a complex of underground and aboveground facilities

- operating wells, collection gas pipelines (loops) to them, a compressor station with total installed capacity of 10

MW, facilities for preparation, processing, control and measurement of gas and other appurtenant facilities. The

technological process related to the natural gas storage service is seasonal (cyclical) and is expressed in the extraction

and pumping of gas from/into the underground gas storage.

All revenues from the transmission of natural gas to third countries, access and transmission, balancing and storage

of natural gas are recognized over time as deliveries, as the deliveries are a sequence of a separate service, which is a

promise to supply natural gas and which is essentially uniform and has a homogeneous pattern of transfer to the

customer.

Revenue is recognized in the consolidated statement of profit or loss when natural gas is transferred through the

transmission network to the relevant point of the customer. Revenue from sales is recognized on the basis of the

quantities reported by measuring instruments or registered schedules.

The selling prices of the access and transmission service, provided by the Group, can be on the basis of a regulated

price and on the basis of a fixed price under a contract. The transaction price can be defined as a fixed remuneration
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
22
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
for the transfer of individual quantities of the series of goods (quantities of transferred natural gas). The selling prices

of the storage service are based on a regulated price. The transaction price can be defined as a fixed remuneration for

the storage of individual quantities of the series of goods (quantities of stored natural gas).

Allocation of the transaction price to the performance obligations is made on the basis of unit selling prices (regulatory,

contractual or market).

At the end of each billing period, the Group measures its progress towards full settlement of the performance

obligation that is met over time. The measurement is carried out by verifying the transmitted quantities and/or the

requested quantities as per the schedule, i.e. an assessment of the transmitted quantities of natural gas for which the

Group recognizes revenues from access and transmission of natural gas is made.

The selling prices are fixed (regulated price, fixed price under contract). The usual credit period is from 10 to 30 days.

In certain cases, the Group collects short-term advance payments from customers who do not have a significant

component of funding. The collected advance payments from the customers are presented in the consolidated

statement of financial position as liabilities under contracts with customers.

Revenue from the service of providing access to and use of an electronic platform for natural gas trading

Gas Hub Balkan EAD was established as an operator of a natural gas trading platform in accordance with the Bulgarian

Energy Act. In 2024, the Group, through Gas Hub Balkan EAD, offers the following services for access to its e -

commerce platform:

• Short-term (spot) segment of the platform, which offers short-term standardized products “Intraday”, “day

ahead”, as well as time and local products for the needs of balancing the network of the transmission system operator.

The trade is carried out on an anonymous basis in accordance with the provisions of Regulation (EU) No.312/2014.

• Long-term segment of the trading platform, which offers products traded on a medium-term and long-term

basis — weekly, monthly, quarterly and annual.

1. Standardized products traded on screen on an anonymous basis for the periods of a week, a month, a quarter, a

year/up to five years ahead.

2. Non-anonymous bilateral contracts for a standardized period, traded on the GHB market through their registration

in Trayport Transactions module.

3. GHB Brokerage Services - through which products and services are offered to end-use customers - natural gas

consumers and end-use suppliers directly connected to the natural gas transmission system who do not have access to

the natural gas transmission networks and the VTT, but wish to purchase natural gas at exit points from registered

GHB members for their own use. In this case, the end customer/end supplier has non-trading user status and is not

subject to billing under the applicable price list. Non-trading user is entitled to use GHB's brokerage services by

signing a Brokerage Services Use Agreement and is granted special access rights to a dedicated section of GHB's

website.

Revenue from the provision of the service for access to and use of an electronic platform for natural gas trading is

recognized in the period during which the services are provided. The Group transfers the control over the services

over time and therefore it meets the performance obligation and recognizes revenues over time. When recognizing

revenues from the service provided, the Group applies a method of measuring progress that takes into account the

resources invested.

Segment for offering quantities under the Gas Release Program provides the public supplier with software and

commercial environment for release of the quantities in accordance with the amended and supplemented Energy Act

of the Republic of Bulgaria. Following the amendments to the Transitional and Final Provisions of the Corporate

Income Tax Act voted by the National Assembly, i.e. the repeal of item 4 and item 5 of Art. 176a of the Energy Act,

i.e. the suspension of the Natural Gas Release Program for 2023, no auctions were held under the Release Programme

for 2023.

Gas Hub Balkan (GHB) started active operation in 2020. To be able to operate the platform, GHB customers initially

pay a registration fee of BGN 5,000. The Group enters into termless contracts with its customers to provide services

for access to and use of the electronic natural gas trading platform. Contracts have standard terms that are the same

for all customers. The contract requires from the customer to pay an advance fee for the initial registration of the
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
23
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
customer in the platform. The fee is non-refundable. The initial administrative registration activities of the Group do

not transfer goods or services to the customer and therefore do not give rise to an obligation to perform.

The advance fee is an advance payment for future services for access to and use of the electronic platform for natural

gas trading. Therefore, the Group determines the transaction price, which includes a non -refundable advance fee, and

recognizes revenue for the services for access to and use of the electronic natural gas trading platform in the course

of their provision.

The timing of deferral and recognition as current income of non-refundable amounts collected by the Group is subject

to management's judgement. In making this judgement, management analyses the current state of the stock market,

expectations of changes and developments in the market, the applicable regulatory framework, pending legislative

changes, intentions to enter into agreements with external parties - providers of clearing services and other relevant

factors. In this regard, and taking into account the circumstances that have arisen, the Group's management has made

a judgement that the registration fee income should be deferred over a period of 18 months from the date of its

occurrence.

In connection with the implementation of the clearing mechanism and the expectations that it will come into effect by

the end of the second quarter of 2025, in 2024 the Group's management conducted a thorough analysis of the deferral

period of the registration fee revenue and assessed that it should be until the expected implementation date of the

mechanism.

Revenue from the use of additional screens

In addition to the main contracts, the Group provides its customers with the option to use more than one screen to

access and operate the natural gas trading platform.

The Group determines that the option to use additional screens does not provide a material right that the customer

would not have received without concluding these basic contracts. The prices for the use of additional screens reflect

the unit selling prices for these services. To the extent that the option to use additional screens does not provide the

client with a substantive right, the Group concludes that this is not an obligation to perform in the contract. As a result,

the Group does not allocate any part of the transaction price to the option to use additional screens. The Group

recognizes revenue from the use of additional screens if and when it provides these services.

Revenue from the use of an additional screen is recognized in the period in which the services are provided. The

Group transfers the control over the services over time and therefore it meets the performance obligation and

recognizes revenues over time. When recognizing revenues from the service provided, the Group applies a method of

measuring progress that takes into account the resources invested.

Revenue from the provision of a data provision and reporting service and disclosure of inside information

In relation to the implementation of Regulation (EU) No.1227/2011 and Implementing Regulation (EU)

No.1348/2014, the Group offers a choice of the following services for reporting bids and offers and transactions

entered into or registered through the GHB system:

• Reporting service - where GHB carries out the transmission to ACER of data on the relevant market participant's

wholesale energy product transactions executed on the GHB organized market, including matched and unmatched

orders. Reporting is done through a Third-party Registered Reporting Mechanism (RRM). The Service includes

the reporting of data to ACER and the customer's access to the reported data and the reporting confirmations sent

by ACER.

• Self-reporting data access service - for customers using another reporting organization, GHB offers access to

ready-to-report XML documents containing transaction data for the relevant market participant in the GHB

organized market, prepared in the format and according to ACER requirements. The data shall be made available

through web-based client profiles in the GHB information system.

• Inside Information Disclosure Service ( BGH IIP ) - the service has been approved and included by ACER in

the official register of insider information disclosure platforms, which certifies that BGH IIP meets the

requirements of REMIT and ACER, and guarantees market participants an efficient and in full compliance with

the regulatory requirements for disclosure of inside information.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
24
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The BGH IIP allows market participants to publish inside information in accordance with the requirements of

Regulation (EU) No.1227/2011 and the ACER Guidelines for implementation of REMIT. Access to the published

information is free, without the need to register or pay a fee.

The BGH IIP Inside Information Publishing Services are available both to members of the BGH Organized Market

and to third-party market participants who do not use the BGH Trading Platform.

Revenue from data reporting services and disclosure of inside information is recognized in the period in which the

services are provided. The Group transfers the control over the services over time and therefore it meets the

performance obligation and recognizes revenues over time. When recognizing revenues from the service provided,

the Group applies a method of measuring progress that takes into account the resources invested.

Revenue from services provided to the Group for a fixed amount is recognized when the Group transfers the control

over the assets to the customer. The invoices for transferred services are issued monthly, which reflects the linear

method of their recognition, i.e. upon receipt of the assets from the customer.

The rnvoices are due for payment by the tenth day of the month following the transaction.

Revenue from API services

The Group offers a 24/7 web API communication channel for access to public and private information. The public

part contains information that is used without payment of fees and relates to the members of the market of the Group,

the traded quantities and achieved prices, which are publicly available on the company’s website. Private information

is available only to members of the Group’s market in addition to the public information. Private information contains

data on offers and transactions, as well as other commercial information about the market segments in which the

respective customer is active. Private information is used on a fee payment basis.

Revenue from sales of coal

Lignite supplies are made year-round under continuous operation. The customer receives and consumes the benefits

at the same time, the Group transfers control of the coal over time and therefore satisfies the performance obligation

and recognizes revenue over time.

The control over the assets sold is transferred when they are delivered to customers and there are no outstanding

payables that could affect the acceptance of the coal by the buyer. Delivery occurs for each shipment of coal at a

specific point specified by the customer (plant) when the risks of potential losses are transferred to the customer and

he has accepted the assets in accordance with the sales contract.

For each performance obligation (delivery accepted by the customer), the Group recognizes revenue, by measuring

the progress made, to fully meet the performance obligation.

The quantity of coal delivered for a certain period of time (according to the contractual terms), for which control has

been transferred to the customer, has been accepted by the management as an appropriate measure of the performance

of the obligation and reporting on the progress. Revenue is recognized for the relevant quantity delivered for the

relevant period and accepted by the customer.

Sales prices are fixed (fixed price under contract). The usual credit period is from 10 to 30 days. In certain cases, the

Group collects short-term advance payments from customers who do not have a significant component of funding.

The collected advance payments from the customers are presented in the consolidated statement of financial position

as liabilities under contracts with customers.

Revenue from other services

Revenue from the provision of services is recognized in the period in which the services are provided. The Group

transfers the control over the services over time and therefore it meets the performance obligation and recognizes

revenues over time. If at the end of the reporting period the service under the contract is not fully performed, revenue
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
25
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
i s recognized on the basis of the actual service provided by the end of the reporting period, as a proportion of the total

services to be provided because the client receives and consumes benefits simultaneously. This is determined on the

basis of the actual time spent on work performed, relative to the total expected time to perform the service.

The customer pays for the services provided on the basis of the clauses set out in the specific contract. The usual credit

period is from 10 to 30 days after the provision of services. In the event that the services provided by the Group exceed

the payment, an asset is recognized under the contract. If the payments exceed the services provided, a liability under

the contract is recognized.

Revenue from sales of goods

Revenue from sales of goods and materials is recognized when control of the assets sold is transferred. Delivery occurs

when the assets have been sent to the customer, the risks of potential losses have been transferred to the buyer and

he/she has accepted the assets in accordance with the sales contract. The usual payment term is up to 30 days after

delivery.

Costs under contracts with customers

The Group recognizes as costs under contracts with customer the additional and directly related costs, incurred when

concluding a contract with a customer and which would not have arisen if the contract had not been concluded and

expects such costs to be recovered for a period longer than twelve months.

In its usual practice, the Group does not undertakes direct and specific costs incurred for obtaining contracts with

customers and costs for performance of such contracts, which would not have arisen if the relevant contracts had not

been concluded.

Balances on contracts with customers

Trade receivables and assets under contracts

The receivable is the right of the Group to receive remuneration in a certain amount, which is unconditional (i.e.,

before the payment of the remuneration becomes due, it is only necessary that a certain period of time to expire).

The contractual asset is the right of the Group to receive remuneration in exchange for goods or services that it has

transferred to the customer, but which is not unconditional (accrual for receivable). If by transferring the goods and/or

providing the services the Group fulfills its obligation before the customer pays the relevant remuneration and/or

before the payment becomes due, an asset under the contract is recognized as earned remuneration (which is

conditional). Recognized assets under a contract are reclassified as a trade receivable when the right to remuneration

becomes unconditional.

Contract liabilities

As a contract liability, the Group presents the payments received from the customer and/or an unconditional right to

receive payment before it has fulfilled its obligations to perform under the contract. Contract liabilities are recognized

as income when (or as) the performance obligations are met.

Assets and liabilities arising from a contract are presented net in the consolidated statement of financial position, even

if they result from different contractual obligations under the contract.

After the initial recognition, trade receivables and contract assets are subject to an impairment review in accordance

with the rules of IFRS 9 Financial Instruments.

4.9.2. Other income

Other income includes transactions that are incidental to the main activities of the Group and is revenue or income

that is recognized under other standards and is outside the scope of IFRS 15.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
26
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Other income Recognition approach

Revenue from the Security of the

Electricity System Fund

The amount of payments to the public supplier is determined in accordance with the decisions

of the EWRC on the costs of the public supplier, which should be compensated by means of

the Fund, within the costs approved by the EWRC and the budget adopted by the Board. The

funds provided by the SES Fund are recognized in the profit or loss on a systematic basis over

the periods during which the entity recognizes as an expense the relevant costs that the funds

are intended to compensate until the approved EWRC budget for the relevant price period is

exhausted.

Net profit from sale of property,

plant and equipment

Profit or losses arising on the derecognition of property, plant and equipment or an intangible

asset as a result of a sale are included in profit or loss when the asset is derecognized. The

asset is derecognised when the control over the sold asset is transferred.

Rental income Lease income from operating leases is recognized as income on a straight-line basis over the

term of the lease contract, except when Group’s management determines that another system

basis reflects more accurately the timing model at which the benefit from the leased asset is

reduced.

Revenue from financing Where the donation (financing) is related to a cost item, it is recognized as income for the

periods necessary to reconcile it on a systematic basis with the costs it is intended to

compensate. When the donation (financing) is related to an asset, it is presented as a liability

and is included in the income over the useful life of the related asset.

Revenue from insurance events Revenue is recognized when the Group’s right to receive the payment is established.

Income from penalties Revenue is recognized when the Group’s right to receive the payment is established.

Revenue from derecognition of

liabilities

Revenue from derecognition of a liability is recognized when the liability expires or the

creditor waives its rights.

4.9. 3. Finance income

The Group’s financial income includes interest income on debt instruments, dividend income, changes in the fair value

of financial assets measured at fair value through profit or loss, foreign exchange profits, net profits on transactions

in financial instruments.

Recognition of interest income

Interest income is calculated by applying the effective interest rate to the gross carrying amount of the financial assets,

except for financial assets that are credit impaired (Phase 3), for which interest income is calculated by applying the

effective interest rate to their amortized value (gross carrying amount adjusted for the provision for expected credit

losses).

Dividend income

Dividend income from equity instruments (minority interests) is recognized in the consolidated statement of profit or loss in the period

in which the right to receive payment is established.

4.10 Operating expenses

Expenses are recognized when they are incurred and on the basis of accrual and comparability principles and to the

extent that it would not lead to the recognition of assets / liabilities that do not meet the definitions of such, according

to IFRS.

Prepaid expenses are deferred for derecognition as current expenses in the period to which they relate.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
27
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
4.11 Interest expenses and borrowing costs

Interest expense is recognized on an accrual basis for the periods to which it relates, using the effective interest rate

method.

Borrowing costs mainly represent interest on Group’s bank loans and bonds. All borrowing costs that can be directly

attributed to the purchase, construction or production of a qualifying asset are capitalized in the period in which the

asset is expected to be completed and get ready for use or sale by applying a capitalization ration to the expenses on

this asset. The capitalization ratio is the weighted average of the loan expenses attributable to loans of the Group that

are outstanding during the period, except for loans received specifically for the purpose of acquiring a qualifying asset.

Other borrowing costs are recognized as expenses in the period in which they are incurred in the consolidated

statement of profit or loss under section Financial expenses.

4.12 Profit or loss from discontinued operations

Discontinued operations are components of the Group that either have been disposed or were classified as held -for-

sale or as held-for-distribution to the sole-shareholder, and:

• Represent a separate major line of business or cover operations in a particular geographical area;

• Are part of a separate coordinated plan to sell a particular major line of business or operations in a particular

geographical area; or

• Are a subsidiary acquired exclusively with a view to resale.

Profit or loss from discontinued operations, as well as the components of the profit or loss from prior periods, are

presented as a single amount in the consolidated statement of profit or loss.

The disclosure of discontinued operations from the previous year is related to all activities that were discontinued at

the date of these consolidated financial statements for the last presented period. If operations that were presented as

discontinued in the previous period are renewed during the current year, the relevant disclosures for the previous

period should be changed.

4.13 Property, plant and equipment

Property, plant and equipment are initially measured at cost price, including the expenses on acquisition, as well as

any direct costs of bringing the asset to working condition. Their subsequent measurement after initial recognition

applies to a whole class of similar assets as follows:

No. Class of property, plant and equipment Model for a subsequent assessment
1 Lands Revaluation model
2 Improvements on land and plots Revaluation model
3 Buildings and constructions • massive Revaluation model
• non-massive Cost model
4 Plant and equipment Revaluation model
5 Computer systems Cost model
6 Vehicles
• freight vehicles Revaluation model
• passenger cars Cost model
• specialized motor vehicles Revaluation model
7 Furniture, fixtures and fittings Cost model
8 Spare parts, accounted as property, plant and equipment Revaluation model
9 Other property, plant and equipment Cost model

Property, plant and equipment that are accounted for using the revaluation model are subsequently measured at

revalued amount, which is equal to the fair value at the date of measurement, less any accumulated depreciation and

impairment losses. The revaluations are presented in the consolidated statement of comprehensive income and are
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
28
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
accounted for in the equity (revaluation reserve), if not preceded by previously accrued expenses. Upon sale or

derecognition of the remeasured asset, the remaining revaluation reserve is recognized to retained earnings.

Revaluations are performed in compliance with the following frequency of revaluation:

• when the fair value of assets undergoes only minor changes, the revaluation is made every three years;

• when the fair value of property, plant and equipment changes substantially in shorter time intervals, the revaluation

is carried out at shorter time intervals so that the carrying amount of the asset does not differ materially from its

fair value.

The frequency of subsequent revaluation of property, plant and equipment when applying the revaluation model,

depends on whether the carrying amount materially differs from the fair value of a revalued asset at the end of the

reporting period.

In this regard, when performing the annual inventory at the end of the reporting period (end of the financial year), the

Group checks the items of property, plant and equipment for indications as to whether their carrying amount differs

substantially from their fair value.

A substantial deviation is the deviation of the carrying amount from the fair value of the asset at the date of preparation

of the financial statements by more than 5%. The deviation is substantial also if it is below 5%, but the difference

between the carrying amount and the fair value as a cumulative amount of property, plant and equipment, is material

for the purpose of preparation of the consolidated financial statements.

Property, plant and equipment accounted for using the acquisition price model are subsequently measured at their

acquisition price less the accumulated depreciation and impairment losses. The impairments made are reported as an

expense and recognized in the consolidated statement of comprehensive income for the period.

T he subsequent expenses related to an asset of property, plant and equipment are added to the carrying amount of the

asset when the Group is likely to have economic benefits exceeding the originally estimated efficiency of the existing

asset. All other subsequent costs are recognized as an expense for the period in which they are incurred.

The residual value and useful life of property, plant and equipment are assessed by management at each reporting

date.

Depreciation of property, plant and equipment is calculated using the straight-line method over the estimated useful

lives of the individual asset groups as follows:

Buildings 5-80 years
Plant and equipment 2-50 years
Vehicles 2-30 years
Furniture 2-30 years
Other property, plant and equipment 3-30 years
Depreciable buffer gas 60 years

The annual depreciation rate for the depreciable lands for coal mining is calculated as a coefficient and can be

presented as follows:

K = CP SCR + BR + CRIP
where:
CP Coal Production, in tones
SCR Stripped Coal Reserves
BR Blocked Reserves
CRIP Coal Reserves in Progress

The depreciation expenses are included in the consolidated statement of profit or loss in line “Depreciation expenses”

and as part of “Profit/(Loss) for the year from discontinued operations”.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
29
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Buffer gas

The buffer gas of the Group is a specific non-current asset, a significant part of which is gas in the underground gas

storage Chiren (Chiren UGS), and the rest is in the gas transmission system.

The natural gas stored in Chiren underground gas storage (Chiren UGS) includes operating gas and buffer gas. The

natural gas stored in the Chiren UGS is inventoried by tank simulation using specialized ECLIPSE software. The

change in the pressures in the individual drillings during tank simulation of the operation of the underground section

is analyzed and compared with the actually measured pressures.

Buffer gas maintains the stratum pressure required to extract the working gas. The buffer gas stored in the underground

gas storage is accounted for as a fixed asset.

The quantity of buffer gas was estimated by technical experts in the Group, based on the stratum pressures during

drillings and the pressure at the exit of Chiren UGS, i.e. at the point where the natural gas is fed into the gas pipeline.

Buffer gas includes physically extractable and non-extractable natural gas. The quantity of physically extractable

natural gas has been estimated. The extracted buffer gas is the possible quantity of natural gas that could be extracted

on the surface at a pipeline pressure of 35 bar at the currently existing facilities . The extractable buffer gas is non-

depreciable. The non-extractable buffer gas is depreciable

The buffer gas in the transit and main gas pipelines (quantities of natural gas required for the operation of the main

and transit gas pipelines) is also categorized as depreciable and non-depreciable as the depreciable part of the gas is

the one, which can be extracted when the gas pipelines are dismantled.

Technical experts of the Group have estimated the unrecoverable quantity of natural gas which would be irretrievably

lost in case of dismantling the transmission and the transit gas pipelines. This quantity is considered depreciable gas.

The rest of the estimated minimum quantity of natural gas required for the normal functioning of the gas transmission

network is non-depreciable. This natural gas could be extracted in case of dismantling.

The profit or loss from sale of property, plant and equipment is determined as the difference between the proceeds

from the sale and the carrying amount of the asset.

4.14 Intangible assets

Intangible assets acquired separately are initially measured at their cost of acquisition, including all duties paid, non -

refundable taxes and direct costs incurred in preparing the asset for operation, with capitalized costs amortized on a

straight-line basis over the estimated asset`s useful life as it is considered to be limited.

The subsequent measurement is based on the cost of acquisition less the accumulated depreciation and impairment

losses. The impairments are reported as an expense and are recognized in the consolidated statement of profit or loss

for the respective period.

Intangible assets with a limited useful life are depreciated over their useful lives and tested for impairment when there

are indications that their value is impaired. The depreciation period and the depreciation method for intangible assets

with a limited useful life are reviewed at least at the end of each financial year. The changes in the expected useful

life or pattern of consumption of the future economic benefits of the intangible asset are accounted for by changing

the amortization period or method and are treated as a change in accounting estimates.

The subsequent expenses arising in respect of intangible assets after their initial recognition are recognized in the

consolidated statement of profit or loss for the period in which they are incurred, unless the asset can generate more

than the initially anticipated future economic benefits and when those costs can be reliably valued and attributed to

the asset. If these conditions are met, the expenses are added to the cost price of the asset.

The residual value and useful life of intangible assets are assessed by management at each reporting date.

The amortization of intangible assets is calculated on a straight-line basis over the estimated useful lives of the assets.

The useful lives of intangible assets are defined as limited as follows:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
30
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Software products 2-10 years
Licenses term of the license
Products from development activities 5-20 years
Other intangible assets 3-10 years

The amortization expenses are included in the consolidated statement of profit or loss in the line “Depreciation

expenses” and as part of “Profit/(Loss) for the year from discontinued operations”.

Profit or losses arising from the disposal of intangible asset that represent the difference between the net proceeds

from the sales and the carrying amount of the asset are included in the consolidated statement of profit or loss when

the asset is disposed.

The intangible assets created in the Group for the purposes of internal users of the group, as a result of development

activities, are recognized as assets by an expert commission appointed by Group’s management, according to the

intangible asset creation phase, if the following conditions are met:

− it is probable that the entity will receive the expected future economic benefits associated with the asset;

− there is technical capability to have the asset completed;

− intention to complete the asset;

− the asset can be used or sold and there is a market or the asset is useful for Group’s internal use;

− availability of adequate technical, financial and other resources for completion of the development activity

and for the use or sale of the intangible asset;

− the value of the asset can be reliably determined.

Research activity

Research activity costs incurred in gaining new scientific or technical knowledge are recognized in profit or loss when

incurred.

Research and development expenses incurred in respect of external orders under signed contracts with customers are

recognized as assets for sale.

The indirect technological generation costs are allocated on the basis of labor and together with the direct expenses

form the cost price of the created asset.

Development activity

Development activities include a plan or project for production of new or significantly improved products and

processes. Development costs are capitalized only if these costs can be measured reliably, the product or process is

technically and commercially feasible, future economic benefits are probable and the Group intends and has sufficient

resources to complete the development and use or sell the asset. The capitalized costs include materials, labor,

overheads that are directly attributable to the preparation of the asset for its use, and capitalized interest expenses.

Other development costs are recognized in profit or loss when incurred. Capitalized development costs are measured

at cost of acquisition less any accumulated amortization and impairment losses.

The costs incurred during the development of intangible assets that do not meet these capitalization criteria are

recognized when incurred.

4.15 Reporting of Lease Contracts

The Group as a Lessee

For all new contracts, the Group assesses whether the contract is or contains a lease. A lease is defined as “a contract

or part of a contract that gives the right to use an asset (the underlying asset) for a period of time in return for payment. ”

To implement this definition, the Group assesses whether the contract complies with three key assessments:

- the contract contains a specific asset that is either explicitly identified in the contract or is implicitly identified

by being identified at the time the asset is made available to the Group;
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
31
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- The Group is entitled to receive substantially all the economic benefits from the use of the specified asset

throughout the period of use, taking into account its rights within the defined scope of the contract;

- The Group has the right to direct the use of the specified asset throughout the period of use. The Company

assesses whether it has the right to direct “how and for what purpose” the asset to be used throughout the period

of use.

Valuation and recognition of a lease as a lessee

At the commencement date of the lease, the Group recognizes an asset for use and a lease liability in the balance sheet.

The asset with a right-to-use is measured at cost price, which consists of the initial assessment of the lease liability,

all initial direct costs incurred by the Group, estimate of all costs for dismantling and disposal of the asset at the end

of the lease and any lease payments made before the start date of the lease (without any incentives received).

The Group depreciates the assets with the right-to-use on a linear basis from the date of the beginning of the lease

until the earlier from the end of the useful life of the asset with the right to use or the end of the lease term. The Group

also makes a check for impairment of the asset with the right-to-use when such indicators exist.

At the commencement date, the Group measures the lease liability at the present value of the unpaid lease payments,

discounted at that date using the interest rate included in the lease. If this percentage cannot be determined directly,

the Group uses the interest rate it would have to pay to borrow for a similar period of time, with similar collateral, the

funds needed to obtain an asset of similar value in a similar economic environment.

Lease payments included in the measurement of a lease liability consist of fixed payments, variable payments based

on an index or percentage, amounts expected to be payable under a residual guarantee and payments arising from

options reasonably certain to are exercised.

After the effective date, the Group measures the lease liability by increasing the carrying amount to reflect the interest

on the lease liability and decreasing the carrying amount to reflect the lease payments made, and revalues the carrying

amount of the liability to reflect revaluations or changes in the lease. to reflect adjusted substantially fixed lease

payments.

The Group is exposed to potential future increases in variable lease payments based on an index or interest rate that

are not included in the lease liability until it enters into force. When adjustments to lease payments, based on an index

or interest rate, become effective, the lease liability is revalued and adjusted for the asset to be used.

When the lease liability is revalued, the corresponding adjustment is reflected in the asset with the right of use or in

the profit and loss, if the asset with the right of use is already reduced to zero.

The Group has chosen to account for short-term leases and leases for which the underlying asset is of low value, using

exemptions from recognition requirements. Instead of recognizing an asset with a right of use and a lease liability,

payments in respect of them are recognized as an expense in the profit or loss on a line during the lease term.

In the consolidated statement of financial position, usable assets are included in property, plant and equipment, and

lease liabilities are included in trade and other payables.

The Group as a lessor

As a lessor, the Group classifies its leases as operating or finance leases. The lease is classified as a finance lease if it

transfers substantially all the risks and rewards incidental to ownership of the underlying asset and is classified as an

operating lease if it does not.

4.16 Impairment testing of non-financial assets

When calculating the amount of impairment, the Group defines the smallest identifiable group of assets for which

separate cash flows (a cash-generating unit) can be determined. As a result, some assets are subject to testing for

impairment on an individual basis while others - on a cash-generating unit basis.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
32
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
At each reporting date, the Group assesses whether there is any indication that an asset or cash -generating unit is

impaired. In case of such indications or when an annual impairment test for an asset is required, the Group determines

the recoverable amount of that asset. The recoverable amount of an asset is the higher of its fair value less costs to sell

the asset and the cash-generating unit and its value in use. The recoverable amount is determined for an individual

asset, except when the use of the asset does not generate cash flows that are substantially independent of the cash

flows generated by other assets or groups of assets. When the carrying amount of an asset or cash -generating unit is

higher than its recoverable amount, those cash-generating assets or units are considered impaired and their carrying

amount is reduced to its recoverable amount.

When determining the value in use of an asset, the expected future cash flows are discounted to their present value

using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific

to the asset. The fair value less the costs to sell is determined using an appropriate measurement model. The made

calculations are confirmed by using other measurement models or other available sources of information about the

fair value of an asset or a cash-generating unit.

Impairment losses are recognized as an expense in the consolidated statement of profit or loss, except for non-current

assets that were revalued in prior periods and the increase in revaluation is recognized in other comprehensive income.

In this case, the impairment loss is also recognized in the other comprehensive income to the amount of the previously

recognized revaluation of the asset.

At each reporting date, the Group assesses whether there are indications that an asset impairment loss recognized in

prior periods may no longer exist or may have decreased. If such indication exists, the Group determines the

recoverable amount of the asset or cash-generating unit. An impairment loss is reversed only when there has been a

change in the estimates used to determine the asset’s recoverable amount since the last impairment loss was

recognized. The reversal of an impairment loss is limited so that the carrying amount of the asset may not exceed its

recoverable amount and does not exceed the carrying amount (after deduction of depreciation) that would have been

determined if no impairment loss had been recognized. assets in previous years. The reversal of an impairment loss is

recognized in the consolidated statement of profit or loss unless the asset is measured at revalued amount, in which

case it is reported as an increase from revaluation.

4.17 Financial instruments

A financial instrument is any contract that generates a financial asset of an entity and a financial liability or equity

instrument of another entity.

A financial asset is any asset that represents: cash, an equity instrument of another entity, a contractual right to receive

or exchange cash or financial instruments with another entity under potentially favourable conditions, and a contract

to be settled with an equity instrument of the Group and is a non-derivative, in which it may or will receive a variable

number of its equity instruments or a derivative that may or may be settled by exchanging a fixed amount of cash or

another financial assets against a fixed number of own equity instruments

A financial liability is any liability that represents: a contractual right to provide or exchange cash or financial

instruments with another entity under potentially adverse conditions, and a contract that will be settled with the issuer's

equity instruments and is a non-derivative in which the Group may or will receive a variable number of the entity's

equity instruments or a derivative that can or will be settled, other than the exchange of a fixed amount of cash or

other financial assets, for a fixed number of the entity's equity instruments.

4.17.1. Financial assets

Initial recognition and classification

The Group initially recognizes a financial asset when it becomes a party to the contractual arrangement and classifies

it according to the financial asset management business model and the characteristics of the agreed cash flows.

The Group classifies its financial assets according to their subsequent measurement in three categories: “financial

assets measured at amortized cost”, “financial assets measured at fair value through other comprehensive income”, or

“financial assets measured at fair value through profit or loss”, as appropriate in accordance with the contractual terms

of the instruments and the business models established in the Group, in accordance with IFRS 9 .
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
33
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The business model of the Financial Asset Management Group refers to the way it manages its financial assets to

generate cash flows. The business model determines whether cash flows will result from the collection of contractual

cash flows, the sale of financial assets, or both.

Initial measurement

Initially, all financial assets, with the exception of trade receivables, are measured at fair value, plus direct transaction

costs, if they are not carried at fair value through profit or loss when the net of transaction costs are initially recognized.

Trade receivables that do not contain a significant component of financing and for which the Group applies the

practically feasible measure under IFRS 15 in this respect are initially measured at the respective transaction price, in

accordance with IFRS 15.

Subsequent measurement and presentation

For the purposes of subsequent measurement and presentation, financial assets are classified into one of the following

categories: “financial assets measured at amortized cost” (debt instruments), “financial assets measured at fair value

through other comprehensive income by reclassifying accumulated gains and losses” (debt instruments), “financial

assets designated at fair value in other comprehensive income, excluding reclassification of accumulated gains and

derecognition losses” (equity instruments) or “financial assets measured at fair value through profit or loss” (debt and

equity instruments).

Classification groups

Financial assets at amortized cost (debt instruments)

The Group management has determined that the financial assets representing cash in banks, trade receivables, other

receivables, court and assigned receivables and receivables from related parties are held by the Group in order to

receive the agreed cash flows and are expected to lead to cash flows. representing only principal and interest payments

(business model applied). These financial assets are subsequently classified and measured at amortized cost.

This category includes cash in banks, trade receivables, other receivables, court and award receivables and receivables

from related parties and loans. This category of financial assets is the most significant for the Group.

The Group evaluates and measures financial assets at amortized cost if both of the following conditions are met:

• The financial asset is held within a business model in order to hold financial assets in order to collect

contractual cash flows;

• The agreed terms of the financial asset lead to certain cash flow dates, which are only principal payments

and interest on the outstanding principal.

The subsequent evaluation is made using the “effective interest rate” method, which calculates interest income by

applying the effective interest rate to the gross carrying amount of the instruments. For purchased or created assets,

with initial credit impairment and those with subsequently recognized credit impairment, the effective interest rate

and the effective interest rate adjusted for credit losses are applied, respectively, but at the amortized cost of the asset.

Financial assets in this category are reviewed for impairment at the date of each of Group’s financial statements, with

changes in profit or loss.

Gains and losses are recognized in profit or loss when the asset is derecognized, modified or impaired.

Financial assets at fair value in other comprehensive income (equity instruments)

Upon initial recognition, the Group may make an irrevocable choice to classify certain equity instruments as those at

fair value through other comprehensive income, but only when they meet the definition of equity under IAS 32

Financial Instruments: Presentation and are not held for trading purposes. The classification is determined on the basis

of individual level, instrument by instrument.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
34
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Subsequent evaluation of this instrument is carried at fair value and changes are recognized in other comprehensive

income. Fair values are determined based on quoted prices in an active market, and when there is no such - based on

evaluation techniques, usually an analysis of discounted cash flows.

Profits and losses on these financial assets are never reclassified to profit or loss. Dividends are recognized in the item

“financial income” in the consolidated statement of profit or loss when the right to pay is established.

The Group has made an irrevocable choice to classify in this category its minority capital investments, which it holds

in the long term and in connection with its business interests in these companies. They are traded on capital markets.

Financial assets at fair value through profit or loss

The Group evaluates all other financial assets other than those designated at amortized cost or at fair value through

other comprehensive income, at fair value through profit or loss.

If this eliminates or significantly reduces a discrepancy in the measurement or recognition of a financial asset that

would result from recognizing results and changes on a different basis, the Group may apply the exceptions in

accordance with IFRS 9 and in initial recognition irrevocably to determine a financial asset as measured at fair value

through profit or loss, incl. contracts for the supply of a non-financial position. Such financial assets are presented in

the notes to the financial statements separately from other instruments to which this valuation approach is mandatory.

Derecognition

A financial asset (or, where applicable, part of a financial asset or part of a group of similar financial assets) is

derecognised when the contractual rights to the cash flows from the asset have expired or the Group has transferred

its rights to receive cash flows from the asset or undertook to pay in full the cash flows received without material

delay to a third party under a "transfer" agreement.

When a financial asset is derecognised in its entirety, the difference between 1) the carrying amount (measured at the

date of derecognition) and 2) the consideration received (including any new asset received without the new assumption

of a new liability) is recognized in profit or loss.

When the Group has transferred its rights to receive cash flows from an asset or has entered into a transfer agreement,

it assesses whether and to what extent the risks and rewards of ownership are retained. When it neither transfers nor

retains substantially all the risks and rewards of the asset, nor does it transfer control of the asset, the Group continues

to recognize the transferred asset to the extent of its continuing involvement. In this case, the Group recognizes a

related liability. The transferred asset and the related liability are measured on a basis that reflects the rights and

obligations that the Group has retained.

I mpairment of financial assets

The Group recognizes provisions for expected credit losses for all debt instruments that are not carried at fair value

through profit or loss, using the approach presented in the table below:

Type of financial asset Category under IFRS 9 Impairment approach
1 Short-term trade receivables Debt instruments measured at Simplified approach
amortized cost
2 Trade receivables with financing Debt instruments measured at Standardized approach
component amortized cost
3 Short-term receivables from related parties Debt instruments amortized cost measured at Simplified approach
4 Receivables from related parties Debt instruments measured at Standardized approach
with a financing component amortized cost
5 Loan receivables Debt instruments measured at Standardized approach
amortized cost
6 Cash and cash equivalents Debt instruments measured at Standardized approach
amortized cost
7 Other financial, court and awarded receivables Debt instruments amortized cost measured at Simplified approach

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
35
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Expected credit losses represent a probabilistic weighted estimate of credit losses (i.e. the present value of each

shortfall) for the expected maturity of the financial instrument. Cash deficit is the difference between the cash flows

due to the Group in accordance with the contract and the cash flows that the Group expects to receive. As expected

credit losses take into account the amount and timing of payments, expected credit loss is recognized even if the Group

expects the asset to be repaid in full, but later than the due date.

Impairment and losses on financial instruments are dealt with in three stages – the first two being the expected credit

losses for losses that may arise as a result of default, and the third as credit impairment (loss), based on evidence of

potential or actual failure to perform on the instruments.

Expected credit losses for exposures for which there is no significant increase in credit risk compared to initial

recognition are recognized for credit losses that may arise as a result of default events over the next 12 months. For

credit exposures for which there is a significant increase in credit risk after initial recognition, an adjustment of the

loss for expected credit losses is required relative to the remaining life of the exposure, regardless of the default time

(ECL for the entire life of the instrument).

Receivables with financing component - To calculate the expected credit losses of long-term receivables with

financing element, the Group applies a standardized approach to impairment. Under this approach, the Group applies

a “three-step” impairment model based on changes in the initial recogni tion of the credit quality of the financial

instrument (asset).

Expected credit losses are calculated in the following 3 phases:

• A financial asset that is not impaired at its initial origination/acquisition is classified in Phase 1. Since its

initial recognition, its credit risk and performance have been subject to continuous monitoring and analysis.

The expected credit losses of financial assets classified in Phase 1 are determined on the basis of credit losses

resulting from possible default events that could occur within the next 12 months of the life of the respective

asset (12-month expected credit losses for the instrument).

• In cases where, after the initial recognition of a financial asset, its credit risk increases significantly and as a

result its performance deteriorates, it is classified in Phase 2. The expected credit losses of financial assets

classified in Phase 2 are determined for the entire remaining life (term) of the respective asset, regardless of

the moment of occurrence of the default (expected credit losses for the whole life (term) of the instrument).

• In cases where the credit risk of a financial asset increases to a level that indicates that a default event has

occurred, the financial asset is considered impaired and is classified in Phase 3. At this stage, the losses

incurred by the relevant asset are determined and calculated for all its remaining lifetime (term).

The Group’s management has developed a policy and a set of criteria for analysis, establishment and assessment of

the occurrence of a state of "significant increase in credit risk".

For trade receivables and contractual assets arising from transactions within the scope of IFRS 15 that do not

contain a significant component of financing, the Group applies a simplified approach in accordance with IFRS 9,

recognizing an impairment loss for expected credit losses based on expected credit loss for the entire term of the

receivables as of each reporting date. The Group applies a matrix, which is used to calculate the expected credit losses

on trade receivables. Receivables are categorized by arrears and are grouped by type and client segments with different

models of credit losses.

For trade receivables, the Group uses its experience in the field of credit losses on such instruments to estimate

expected credit losses. The historical data used are for periods from 3 to 5 years ago, grouped by type and relevant

models of customer segments, and adjusted by forecast factors specific to debtors and industry concerned.

For cash in banks, the Group recognizes impairment of expected credit losses by applying the standardized approach,

using the credit rating of the financial institutions in which the Group has deposited its cash in order to determine the

loss from the failure to meet the parameters of the model.

At each reporting date, the Group determines the amount of impairment for each instrument in the amount equal to

the expected lifelong losses, if the credit risk for this financial instrument has increased significantly since the initial

recognition .
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
36
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
If, at the reporting date, the credit risk on a financial instrument has not increased significantly compared to the initial

recognition, the impairment for this financial instrument is equal to the expected 12-month credit loss.

Additional disclosures related to the impairment of financial assets are also contained in the following notes:

‒ Significant judgments of management in applying accounting policies. Uncertainty of accounting estimates -

note 4.29

‒ Trade and other receivables - note 23

‒ Cash and short-term deposits - note 27

‒ Credit risk - note 37.4

4.17.2. Financial liabilities

Initial recognition, classification and measurement

The Group recognizes in the consolidated statement of financial position a financial liability only when it becomes a

party to the contractual provisions of the financial instrument.

Upon initial recognition, financial liabilities are classified as: "financial liabilities subsequently measured at amortized

cost" (loans and borrowings, trade and other payables) or as "financial liabilities measured at fair value through profit

or loss".

Initial recognition takes place at the settlement date and is carried at fair value plus, in the case of financial liabilitie s

that are not carried at fair value through profit or loss, directly attributable to the acquisition or issue of the financial

liability. Management fees for received loans are deferred over the period of use of the loans, using the effective

interest rate method and are included in the amortized cost of loans.

Group’s financial liabilities include bank loans, trade and other payables and lease payables.

According to their maturity, financial liabilities are classified into long-term and short-term.

Subsequent evaluation

The subsequent valuation of financial liabilities depends on their classification, as described below:

Financial liabilities reported at fair value through profit or loss

Financial liabilities at fair value through profit or loss include financial liabilities held for trading and financial

liabilities initially recognized at fair value through profit or loss.

Financial liabilities are classified as held for trading if they are made for redemption in the near future.

Profits or losses on liabilities held for trading are recognized in the consolidated statement of profit or loss.

Financial liabilities determined on initial recognition at fair value through profit or loss are determined on the initial

recognition date and only if the criteria in IFRS 9 are met.

The Group has not designated financial liabilities as reported at fair value in the profit or loss.

Financial liabilities measured at amortized cost

The category “financial liabilities measured at amortized cost” includes borrowings, trade payables and other liabilities

to which the Group has become a party to a contract or arrangement and which are to be settled net in cash. This

category has the most significant share for Group’s financial instruments.

The received loans are temporarily attracted funds against services from Bulgarian or foreign banks and other financial

institutions, commercial loans, etc.

The bank loans were taken for the purpose of long-term support of Group’s activities. They are reflected in the

consolidated statement of financial position of the Group, net of borrowing costs. Direct transaction costs are

recognized in the consolidated statement of profit or loss on an accrual basis using the effective interest method and
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
37
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
are added to the carrying amount of the financial liability to the extent that they are not settled at the end of the period,

in which they arose.

Financial liabilities are subsequently measured at amortized cost using the effective interest method. Amortized cost

is calculated by taking into account any discount or premium on acquisition, including fees or charges, which are an

integral part of the effective interest rate. Expenses (calculated using the effective interest method) are included as

financial expenses in the consolidated statement of profit or loss and other comprehensive income in the line

“Financial expenses”.

For financial liabilities that are carried at amortized cost, the gain or loss is recognized in profit or loss for the period

in which the financial asset or financial liability is derecognized or impaired through the amortization process.

Trade payables are initially recognized at nominal value and subsequently measured at amortized cost less settlement

payments.

Dividends payable to the sole shareholder are recognized when the dividends are approved by the General Meeting.

Derecognition

The Group derecognises financial liability only when it settles (fulfills) the obligation, the term of the obligation

expires or the creditor waives its rights.

When an existing financial liability is replaced by another from the same lender under significantly different conditions

or the terms of an existing liability are substantially changed, such exchange or change is treated as a write-off of the

original liability and the recognition of a new liability. The difference in the respective carrying amounts is recognized

in the consolidated statement of profit or loss.

The difference between the carrying amount of the financial liability settled or transferred to another party and the

consideration paid for the settlement, including cash and a transfer of non-monetary assets, is recognized in profit or

loss for the period.

4.18 Compensation of financial instruments

Financial assets and financial liabilities are offset and the net amount is presented in the consolidated statement of

financial position when there is a legally enforceable right to reimburse the recognized amounts and the Group intends

to settle on a net basis or to realize assets and settle liabilities at the same time.

4.19 Fair value of financial instruments

At each reporting date, the fair value of financial instruments that are actively traded in the markets is determined on

the basis of quoted market prices or dealer quotations (“buy” prices for long positions and “sell” prices for short

positions), without deduct transaction costs.

The fair value of financial instruments for which there is no active market is determined using valuation techniques.

These techniques include the use of recent direct market transactions; references to the current fair value of another

instrument that is substantially the same; discounted cash flow analysis and other valuation models.

4.20 Inventories

Inventories include materials, output, work in progress and goods. The cost price of inventories includes direct costs

of purchase or production, processing and other direct costs associated with their delivery, as well as part of the total

production costs determined on the basis of normal production capacity. Financial expenses are not included in the

value of inventories. At the end of each reporting period inventories are valued at the lower of cost price and net

realizable value. The amount of any impairment of inventories to their net realizable value is recognized as an expense

in the period of impairment.

The net realizable value is the expected selling price of inventories, less the expected costs of completion of the

production cycle and selling expenses. If inventories have already been impaired to their net realizable value and in a
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
38
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
subsequent reporting period it turns out that the conditions leading to the impairment are no longer present, their new

net realizable value is accepted. The amount of the recovery can only be up to the carrying amount of inventories

before impairment. The amount of the reversal of the costs of inventories is reported as a reduction in the cost of

materials for the period in which the reversal occurs.

The Group determines the cost of inventories using the weighted average method.

When inventories are sold, their carrying amount is recognized as an expense in the period in which the related revenue

is recognized.

Nuclear fuel

The fuel charged to the reactors represents the residual value (residual resource) of the nuclear fuel located in the

reactors at the reporting date. The calculations are based on the approved Methodology for reporting the supply,

refuelling and consumption of fresh nuclear fuel in NPP Kozloduy EAD, taking into account the value of refueled

fresh nuclear fuel during the fuel campaign and the estimated fuel component, which is determined by dividing the

value of the charged nuclear fuel in the reactor by the estimated calculation for electricity production for the period in

kWh. The multiplication of the gross energy produced by the respective unit for the fuel campaign and the fuel

component represents the consumption of nuclear fuel during the respective period.

Operating gas

Operating quantities of natural gas are reported as inventories. Initially, natural gas is valued at purchase price plus

transportation costs. In consumption, operating natural gas is reported at a weighted average price. Operating gas is

valued at the lower of cost and net realizable value.

The net realizable value is the estimated selling price in the ordinary course of business, less the estimated costs of

completion and those necessary to effect the sale. In determining the net realisable value at the end of the reporting

period, the market levels of the TTFfm index are used, according to the futures published on argusmedia.com for

January of the following calendar/financial year. In the event that natural gas has already been depreciated to net

realizable value and in a subsequent accounting period it turns out that the conditions that led to the depreciation are

no longer present, its new net realizable value is accepted. The amount of the recovery can only be up to the carrying

amount of the natural gas before impairment. The amount of impairment reversed is recognized in profit or loss in the

period in which it arises. Reversals of impairment losses are recorded as part of cost of gas sold in the period.

Stripping costs

These costs are the costs for stripping the coal deposits. These costs include surveying, exploration, mine development

and other direct costs related to the preparation for mining the coal. The costs are deferred on the basis of the quantities

of coal prepared for mining at the end of the year and are presented as part of the work in progress.

4.21 Income taxes

Current income tax paid

Current tax assets and liabilities for the current and prior periods are recognized at the amount expected to be recovered

from or paid to the tax authorities. When calculating current taxes, the tax rates and tax laws that are in force or have

been largely adopted at the reporting date are applied. The management analyses the individual items in the tax return

for which the applicable tax provisions are interpreted and recognizes provisions when appropriate.

Current taxes are recognized directly in equity (not in profit or loss) when the tax relates to items that have been

recognized directly in equity .

From 2022, the amount of the current tax includes the temporary solidarity contribution, mandatory for the Group,

introduced by Regulation (EU) 2022/1854, calculated as a percentage of the taxable income before the calculation of

corporate tax. For 2024 and 2023, the subsidiary Mini Maritsa-Iztok EAD has no joint and several contribution

obligations.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
39
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Deferred income tax

Deferred tax is provided using the balance sheet method, providing for temporary differences as of the reporting date,

arising between the tax bases of assets and liabilities and their carrying amounts in the financial statements. Deferred

tax liabilities are recognized for all taxable temporary differences:

- except to the extent that the deferred tax liability arises from the initial recognition of an asset or liability of a

transaction that is not a business combination and affects neither accounting profit nor tax profit or loss at the

time of the transaction; and

- for taxable temporary differences related to investments in subsidiaries, associates and participations in joint

ventures, except to the extent that the Group is able to control the timing of the reversal of the temporary difference

and it is probable that the temporary difference will not reverse in foreseeable future.

Deferred tax assets are recognized for all deductible temporary differences, unused tax credits carried forward and

unused tax losses, to the extent that it is probable that taxable profit will be available against which the deductible

temporary differences, deferred tax credits carried forward and unused tax credits can be utilized losses:

- unless the deferred tax asset arises from the initial recognition of an asset or liability of a transaction that is not a

business combination and does not affect either the accounting profit or the tax profit or loss at the time of the

transaction; and

- for deductible temporary differences related to investments in subsidiaries, associates and interests in joint

ventures, a deferred tax asset is recognized only to the extent that the temporary difference is likely to reverse in

the foreseeable future and to generate taxable profit, against to take advantage of the temporary difference.

The Group reviews the carrying amount of deferred tax assets at each reporting date and reduces it to the extent that

it is no longer probable that sufficient taxable profit will be available to allow all or part of the deferred tax asset to

be recovered. Unrecognized deferred tax assets are reviewed at each reporting date and are recognized to the extent

that it is probable that future taxable profits will be available against which the deferred tax asset can be recovered.

Deferred tax assets and liabilities are measured at the tax rates that are expected to apply in the period in which the

asset is realized or the liability is settled, based on tax rates (and tax laws) that are enacted or substantively enacted.

degree, as of the reporting date.

Deferred tax relating to items recognized out of profit or loss is recognized out of profit or loss. Deferred taxes are

recognized in accordance with the related transaction, either in other comprehensive income or directly in equity.

The Group only offsets deferred tax assets and liabilities when it has a legal right to deduct current tax assets against

current tax liabilities and deferred tax assets and liabilities relate to income taxes levied by the same tax authority on

the same taxable entity.

4.22 Trade receivables

Trade receivables represent an unconditional right of the Group to receive remuneration under contracts with

customers and other counterparties (ie it is subject only to the expiration of time before the payment of remuneration).

Initial measurement

Trade receivables are presented and reported initially at fair value based on the transaction price, which value is usually

equal to their invoice value, unless they contain a significant financing component, which is charged additionally. In

this case, they are recognized at their present value, determined at a discount rate in the amount of interest rate deemed

inherent in the client - the debtor.

Subsequent evaluation

The Group holds trade receivables solely for the purpose of collecting contractual cash flows and subsequently

measures them at amortized cost less accumulated impairment for credit losses.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
40
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Impairment

The Group applies the expected credit loss model for the entire term of all trade receivables, using the simplified

approach allowed by IFRS 9 and based on a matrix model for the percentage of loss.

4.23 Cash and cash equivalents

Cash and short-term deposits in the consolidated statement of financial position include cash in bank accounts, cash

and short-term deposits with an original maturity of three months or less.

Subsequent evaluation

Cash and cash equivalents in banks are subsequently presented at amortized cost less accumulated impairment losses .

4.24 Non-current assets and liabilities, included in disposal groups, classified as held for distribution to the

owner or held for sale

Non-current assets and liabilities classified as held for distribution to the owner

When the Group has committed to distribute an asset (or disposal group) to the owner, the asset or disposal group is

classified as held for distribution to the owner and presented separately in the consolidated statement of financial

position. To this end, the assets must be available for immediate distribution in their current state and the distributio n

must be very probable. In order for the allocation to be very likely, action must be taken to complete the allocation

and it must be expected to be completed within one year from the date of classification. The actions required to

complete the allocation should indicate that it is unlikely that significant changes will be made to the allocation or that

it will be withdrawn.

Liabilities are classified as held for allocation to the owner and are presented as such in the consolidated statement of

financial position only if they are directly attributable to the disposal group.

Assets classified as held for distribution to the owner are measured at the lower of their carrying amount immediately

after their determination as held for distribution to the owner and their fair value less costs to distribute. Assets

classified as held for distribution to the owner are not subject to depreciation after their classification as held for

distribution to the owner.

Non-current assets and liabilities classified as held for sale

When the Group intends to sell a non-current asset or group of assets (disposal group) and if the sale is very likely to

take place within 12 months, the asset or disposal group is classified as held for sale and presented separately in the

consolidated statement of financial position. condition.

Liabilities are classified as held for sale and presented as such in the consolidated statement of financial position only

if they are directly attributable to the disposal group.

Assets classified as held for sale are measured at the lower of their carrying amount immediately after they are

classified as held for sale and their fair value less costs to sell. Certain assets held for sale, such as financial assets or

deferred tax assets, continue to be measured in accordance with Group’s accounting policies for these assets. Assets

classified as held for sale are not depreciated after they are classified as held for sale.

Profits or losses arising from the sale or revaluation of discontinued operations are presented as described in note 4.12.

4.25 Equity, reserves and dividend payments

The share capital of the parent company reflects the nominal value of the issued shares.

Other reserves include general reserves and additional reserves.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
41
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Revaluation reserves to fair value include revaluations of available-for-sale financial assets, as well as Group’s share

of results of operations and revaluation of financial assets / liabilities recognized directly in equity of associates or

joint ventures.

The revaluation reserve of non-financial assets is formed by the difference between the carrying amount and the fair

value of assets, property, plant and equipment at the date of revaluation, reduced by the corresponding deferred tax

liability.

The reserve from revaluation of foreign operations includes the foreign exchange differences on the revaluation of the

financial statements of subsidiaries whose functional currency is different from the presentation currency of the Group.

The revaluation reserve for defined benefit plans includes revaluations of staff defined benefit plans determined by

reports of independent actuarial valuers.

Retained profit / (accumulated loss) includes the current financial result and the accumulated profits and uncovered

losses from previous years.

Debts for payment of dividends to the sole shareholder are included in the line “Debt to related parties” in the

consolidated statement of financial position, when the dividends are approved for distribution by the sole owner before

the end of the reporting period.

All transactions with the owner are presented separately in the consolidated statement of changes in equity.

4.26 Retirement and short-term employee benefits

Short-term employee benefits

Short-term employee benefits in the form of remuneration, bonuses and social benefits and allowances (due for

settlement within 12 months after the end of the period in which the employee rendered service or met the necessary

conditions) are recognized as an expense in the consolidated statement of profit or loss, unless an IFRS requires that

amount to be capitalized in the cost of an asset for the period in which the work for them is done and/or the

requirements for receiving them as a current liability are met (after deducting any amounts already paid and deductions

due).

The Group reports short-term liabilities for compensable leaves arising from unused paid annual leave in cases where

it is expected to be used within 12 months after the date of the reporting period during which employees have

performed work related to these leaves. At the date of each financial statement, the companies in the Group estimate

the amount of the expected costs of the accumulated compensatory leave, which is expected to be paid as a result of

the unused right to accumulated leave. The assessment includes the approximate estimate of the amounts for the

remunerations themselves and of the contributions for the obligatory social and health insurance, which the employer

owes on these amounts.

Long-term post-employment benefits

The Group owes retirement benefits to its employees under defined benefit plans and defined contribution plans.

Defined contribution plans

Defined contribution plans are pension plans under which the Group pays fixed contributions to government funds.

The main obligation of the employer is to provide compulsory insurance of the hired staff for the Pension Fund,

Supplementary Compulsory Pension Insurance (SCPI), General Sickness and Maternity Fund (GSMF),

Unemployment Fund, Occupational Accident and Sickness Fund (OASF) and health insurance (HI).

The amounts of the social security contributions are approved specifically by the Social Security Budget Act and the

NHIF Budget Act for the respective year. The contributions are distributed between the employer and the insured

person in accordance with the rules of the Social Security Code (SSC).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
42
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
These insurance pension plans, implemented by the Group as an employer, are defined contribution plans. In them,

the employer pays monthly certain contributions to state funds, as well as to universal and occupational pension funds

- on the basis of fixed percentages by law and has no legal or constructive obligation to pay future contributions to the

funds in cases where they do not have sufficient funds to pay persons the amounts earned by them for the period of

their work experience. The obligations regarding the health insurance are similar.

Contributions due from the Group to defined benefit plans are recognized as an expense in the consolidated statement

of profit or loss unless an IFRS requires that amount to be capitalized in the cost price of an asset and as a current

liability.

Defined benefit plans

According to the Bulgarian labour legislation, the Group as an employer is obliged to pay two or six gross monthly

salaries to its employees upon retirement, depending on the time served. If the employee has worked for the same

employer in the last 10 years of service, he must receive six gross monthly salaries in retirement, and if he has worked

for less than 10 years with the same employer - two gross monthly salaries. According to the collective labour

agreements, some of the companies in the Group are paid larger amounts of benefits than those provided by law. The

staff retirement plan is not funded.

The Group determines its retirement benefit obligations using the actuarial valuation method. The Group’s

management assesses the obligation to pay defined benefits once a year with the help of an independent actuary. The

assessment of liabilities is based on standard inflation rates, expected changes in health care costs and mortality. Future

wage increases are also taken into account. The discount factors are determined at the end of each year, taking into

account the yield on high-quality corporate bonds, which are denominated in the currency in which the income will

be paid and have a maturity close to that of the respective pension liabilities.

Retirement benefits of employees related to current service are included in "Employee benefits expenses", and the

amount of discounting liabilities is included as interest expense in "Financial expenses". Actuarial profits/ losses are

recognized in other comprehensive income and relate to Group’s reserves.

The retirement benefit obligation presented in the consolidated statement of financial position consists of the present

value of the obligation to pay that benefit.

4.27 Provisions

Provisions are recognized when the Group has a present obligation (legal or constructive) as a result of past events, it

is probable that an outflow of resources embodying economic benefits will be required to settle the obligation, and a

reliable estimate of the value of the obligation can be made. When the Group expects that some or all of the costs

necessary to settle the provision will be reimbursed, for example under an insurance contract, the reimbursement is

recognized as a separate asset, but only when it is reasonably certain that those costs will be reimbursed. Provision

expenses are presented in the consolidated statement of profit or loss, net of the amount of recovered expenses. When

the effect of time differences in the value of money is significant, provisions are discounted using the current pre -tax

discount rate, which reflects, where appropriate, the specific risks of the obligation. When discounting is used, the

increase in the provision as a result of the elapsed time is presented as a financial expense.

Provision for environmental protection costs

Provision for environmental protection costs is recognized when it is probable that costs or restoration activities will

be incurred and the Group is obliged, by law or contractual obligation, to take such action. When expenses are expected

to be incurred over a long period, the present value of expected future expenses is recognized as a provision, and the

effects of discounting are reported as Finance income and expenses. At the reporting date, the current consolidated

annual financial statement recognizes a provision for environmental costs relating to costs that are legally required to

be incurred in connection with the disposal of fluorescent and other mercury-containing lamps, disposal and recycling

of rechargeable batteries, disposal, recycling and replacement of capacitor batteries containing PCBs with new ones

and utilization of bleaching soil used in the base for oil regeneration.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
43
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Provision for reclamation

Provision has been made for the estimated costs of reclamation of land disturbed by coal mining at Mini Maritsa-Iztok

EAD, taking into account the requirements of the current environmental legislation, the land to be reclaimed, the

reclaimed unreclaimed land, the cost of reclamation per decare of land, and the estimated quantities of coal reserves

until 2043. The provision is not discounted and is therefore not presented in these consolidated financial statements at

present value, due to significant uncertainty about the volume of land reclamation activities performed over time.

Provision for reclamation of disturbed terrains for disposal of gypsum from desulfurization plants

The Group recognizes provision for its obligation to carry out technological and biological reclamation of the landfill

after being filled with gypsum from desulfurization plants pursuant to Ordinance 26 on reclamation of disturbed

terrains, improvement of low-yielding lands, removal and utilization of the humus layer. Determining the provision

for landfill reclamation requires from the management to make assessment of the costs of closure and post-operational

care of the landfill site as of the date of the consolidated statement of financial position. As of 31 December 2024, the

best estimate of the provision required for landfill remediation is BGN 5,488 thousand (31 December 2023: BGN

5,488 thousand).

Provision for decommissioning nuclear facilities

According to the regulatory requirements, when the implementation of the decommissioning project proves to be more

expensive than the estimates approved by the Board,of the Nuclear Decommissioning Fund, the necessary additional

costs are borne by the entity that last operated the nuclear facility (in this case NPP Kozloduy). As there is no clear

national strategy for the decommissioning of nuclear facilities at the date of approval of the consolidated financial

statements and no estimate of the projected cost of the project has been made by the Nuclear Decommissioning Fund,

the Group cannot reliably estimate the liability and has not recognized provision for the decommissioning of nuclear

facilities as of 31 December 2024 and 31 December 2023.

Provision for transport, processing and storage of spent nuclear fuel

According to the current Strategy for spent fuel and radioactive waste management until 2030, adopted by a decision

of the Council of Ministers on 2 September 2015, the Group has a legal obligation to transport at least 50 tons of

heavy metal per year spent nuclear fuel (SNF) for processing and storage in Russia, in the presence of favourable

financial and economic conditions.

In 2018, a Framework Addendum to the Contract for Transport, Interim Technological Storage and Reprocessing in

Russia was signed between Kozloduy NPP and FSUE PO MAJAK, Russia, in coordination with Euratom Supply

Agency, Luxembourg. In view of the extensive nature of the preparatory activities for the implementation of the SNF

shipment, including organizational and technical arrangements, preparation of the necessary documentation, obtaining

certificates and permits, a new transport scheme for the shipment of SNF from VVER-1000 has been developed. The

first shipment under this scheme took place in December 2020. The costs for its implementation were financed from

the 2018 earmarked funds for SNF management, including for the activities of SNF transportation, technological

storage and reprocessing, which remained unfulfilled from previous years. In the following year 2021, two more

shipments have been executed, funded from provisions made for 2019 and 2020. Unfortunately, the military conflict

between Russia and Ukraine dating back to early 2022 has caused the suspension of SNF shipments to date.

However, in order to meet the obligations under the "Strategy for the Management of RAW and SNF until 2030" for

the transportation of at least 50 tonnes of heavy metal SNF per year and to ensure the necessary funding, the Company

has set aside an additional provision for SNF management as of 31.12.2023 in the amount of BGN 81 100 thousand.

After calculating the best estimate of the cost of 1 shipment of SNF from VVER-1000 (96 casks) as of 31.12.2024,

31 738 thousand BGN was provided to cover the current obligation for 2024.

As of 31 December 2024, the amount of the recognised provision required to cover the current SNF management

obligation is 112,838 thousand BGN, including the value of the outstanding SNF shipments from VVER -1000 for

technological storage and reprocessing for 2021, 2022, 2023 and 2024.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
44
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In the draft Updated Strategy (National Programme) for the Management of SNF and RAW in accordance with

Directive2011/70/Euratom(https://www.me.government.bg/uploads/manager/source/VOP/strategii_politiki/otrabote

no_q_gorivo/Draft_Strategy.pdf) it is stated that according to the contract for technological storage and reprocessing

of SNF from VVER-440 at FSUE "PO MAJAK", the return of vitrified high-level waste (HLW) will be carried out

under a separate contract. The same approach will be used for radioactive waste from the reprocessing of SNF from

VVER-1000 at the same plant. It is planned that the return of vitrified HLW to Bulgaria will take place no earlier than

10 years after the agreement on the Methodology for the determination of the quantity and chara cteristics of returned

HLW derived from VVER-440 and VVER-1000 SNF.

The return of the vitrified HLW from the reprocessing of SNF from VVER-1000 to the GHC FSUE will be carried

out under a separate contract to be concluded after 25 years of storage of the SNF at the reprocessing plant. The

specific volume and characteristics of the HLW will be determined according to a Methodology for Determination of

the Quantity and Characteristics of Returned HLW, agreed between the two Parties, in line with international practice.

The methodology is expected to be agreed no later than 2030.

Greenhouse gas emission allowances

Greenhouse gas emission allowances (tonne equivalent of carbon dioxide) are reported using the "net passive method",

according to which the Group recognizes a liability for carbon dioxide emissions when the emissions are emitted and

exceeded the allocated (according to the national plan for allocating allowances for greenhouse gas emissions trading)

and additionally purchased allowances. The amount of emissions that is above the allowances allocated to the Group

for the year is purchased from the free market. The Group currently recognizes an expense and a corresponding

liability for emissions that are in excess of the allocated allowances. Estimating these emissions is the best possible

estimate of the future resources that will be needed to purchase them, i.e. the market price at the end of the reporting

period.

4.28 Government grants and deferred funding

Government grants and deferred funding are recognized when there is reasonable assurance that the grant / funding

will be received and that all conditions attached to it will be met. Where the grant / financing is related to an expense

item, it is recognized as revenue for the periods necessary to match the grant / financing on a systematic basis with

the costs it is intended to offset. When the grants / financing is related to the acquisition of a non -current asset, it is

presented as income for a future period and is recognized in profit or loss in equal amounts for the expected useful

life of the related asset.

When the Group receives non-monetary government grants, the grant and the asset are carried at nominal value, and

the grant/financing is recognized as income in profit or loss in equal parts each year for the useful life of the asset.

4.29 Significant judgments of management in applying accounting policies. Uncertainty of accounting

estimates

The preparation of these consolidated financial statements requires management to make estimates, estimates and

assumptions that affect the value of recognized assets and liabilities and the disclosure of contingent liabilities at the

reporting date, as well as the reported income and expenses for the period. Uncertainty related to assumptions and

estimates could lead to actual results that require significant adjustments to the carrying amounts of the related assets

or liabilities in subsequent reporting periods.

Estimates of accounting and relevant material assumptions are reviewed on an ongoing basis. The results of a change

in accounting estimates are recognized in the period in which the change is made, as well as in each future period

affected.

Information on significant assumptions, estimates and assumptions, as well as the main sources of uncertainty in the

use of accounting estimates that have the most significant effect on the recognition and measurement of assets,

liabilities, income and expenses, is presented below.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
45
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Long-term electricity purchase contracts

The Group has entered into long-term power purchase agreements with the following contractors operating thermal

power plants in the Maritsa Basin - AES -3C Maritsa East 1 EOOD (for 15 years) and ContourGlobal Maritsa East 3

AD (for 15 years). Based on the concluded long-term agreements, the Group has the right to request quantities of

electricity to be produced by each of the two thermal power plants for a certain period of time on the basis of installed

production capacities as the Group through the subsidiary NEK EAD is obliged to purchase the minimum agreed

quantities of produced electricity and its corresponding availability for the term of the contract. If necessary, the Group

has the opportunity to order larger quantities than the minimum agreed, by purchasing their corresponding availability.

Group’s management believes that since all significant risks and benefits of using these thermal power plants are not

borne by the Group, through its subsidiary NEK EAD, they do not fall within the scope of IFRS 16. Additional

information on long-term electricity purchase agreements is presented in note 41.

Deferred tax assets

Deferred tax assets are recognized for all unused tax losses to the extent that it is probable that taxable profit will be

available against which the losses can be utilized. Determining the amount of deferred tax assets requires management

to make an assumption about the length of the period and an estimate of the amount of future taxable profits, including

an assessment of the future tax planning strategy. The Group has not recognized deferred tax assets for all tax losses.

Additional information is provided in note 24.

Fair value of property, plant and equipment

The Group subsequently reports major groups of property, plant and equipment at revalued amount, using reports

from independent external appraisers to determine their fair value. Detailed information on revaluation, valuation

methods used, assumptions and judgments in determining fair value is provided in note 19.

The specifics of Group's assets and the dynamic economic environment in the energy sector in which it operates could

lead to variations in the assumptions and judgments used in determining the fair values of these properties, plants and

equipment.

Provision for transport, processing and storage of spent nuclear fuel

According to the current Strategy for spent fuel and radioactive waste management until 2030, adopted by a decision

of the Council of Ministers on 2 September 2015, the Group has a legal obligation to transport at least 50 tons of

heavy metal per year spent nuclear fuel (SNF) for processing and storage in Russia, in the presence of favorable

financial and economic conditions.

At the end of the reporting period ending 31 December 2024, the amount of the recognized provision required to cover

the current liability for SNF management is BGN 112,838 thousand, including the value of the outstanding shipments

of SNF from WWER-1000 for technological storage and reprocessing for 2021, 2022, 2023 and 2024.

Provision for decommissioning of nuclear facilities

In accordance with the requirements of IAS 37 Provisions, Contingent Liabilities and Contingent Assets, liabilities

whose value and occurrence over time are uncertain are provisions . Provisions are recognized only if the following

conditions are met:

‒ the entity has a present obligation arising from a past event;

‒ an outflow of the entity's resources containing economic benefits may be required to settle the obligation; and

‒ a reliable estimate of the amount of the obligation can be made.

In compliance with the requirements under the standard for the term 'reliable estimates', the Group has not accrued

any provisions for 'decommissioning of nuclear facilities' and for ‘safe storage of spent nuclear fuel’, due to the

following reasons:

‒ The Group is subject to specific regulations – Safe Use of Nuclear Energy Act, Pricing Regulations and Decrees

adopted by the Council of Ministers to raise funds in the Radioactive Waste (RAW) Fund and the
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
46
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Decommissioning of Nuclear Facilities (DNF) Fund. In accordance with the requirements of these regulations,

the consolidated statement of profit or loss accrues current expenses for contributions due to these funds, which

are transferred to budget accounts. Respecting the principle of "comparability of revenue and expenditures" of

the Accounting Act in the price of electricity for a regulated market, determined by the EWRC, is recognized

cost up to the amount of contributions due to the DNF and RAW funds.

‒ In compliance with the agreements with the European Commission for early decommissioning of Units 1 to 4,

the State has contracted external funding for the construction of a Facility for Dry Storage of Spent Nuclear Fuel

(SNF) in order to cover remunerations and social security costs for the staff of Units 3 and 4, and other funding;

‒ In December 2008 in compliance with Decision No.839 of the Council of Ministers the assets from the first and

second units were gratuitously transferred from NPP Kozloduy EAD to SE RAW, Sofia with subject of

operations 'decommissioning'. By Decision of the Council of Ministers No.1038 of 19 December 2012, Units 3

and 4 of NPP Kozloduy EAD were declared as radioactive waste management facilities and it was determined

that they will be managed by SE RAW. On 1 March 2013, the assets belonging to Units 3 and 4, together with

the respective staff, were transferred to SE RAW.

According to the regulatory requirements, when the implementation of the decommissioning project proves to be more

expensive than the estimates approved by the Board of the DNF fund, the necessary additional costs are borne by the

person who last operated the nuclear facility (in this case NPP Kozloduy). As at the date of approval of the consolidated

financial statements, no estimate of the projected costs of the project has been made by the DNF fund, the Group

cannot reliably estimate the liability and has not recognized a provision for decommissioning of nuclear facilities as

at 31 December 2024 and 31 December 2023.

Other provisions of the Group

The Group recognizes provisions for environmental protection, for reclamation, for exceeding the quotas for

greenhouse gas emissions, provisions for legal claims and others. The determination of provisions requires

management to make an assessment of the expected costs necessary to cover the relevant liabilities of the Group and

the time period. As of 31 December 2024, the best estimate of provisions required is presented in note 32.

Retirement benefits

Retirement benefits are determined by actuarial valuation. This assessment requires assumptions to be made about the

discount rate , future wage growth, staff turnover and mortality rates. Due to the long -term nature of staff income at

retirement, these assumptions are subject to significant uncertainty. As of 31 December 2024, the Group’s liability for

staff retirement benefits is BGN 369,316 thousand (31 December 2023: BGN 336,122 thousand). Additional

information on Group’s liabilities for retirement ben efits is provided in note 31.

Useful life of property, plant and equipment and intangible assets

Management reviews the useful lives of depreciable assets at the end of each reporting period. As of 31 December

2024, management determines the useful life of the assets, which represents the expected useful life of the Group's

assets. Information on the useful life of property, plant and equipment and intangible assets is presented in note 4.13

and 4.14. The carrying amounts of the assets are analysed in notes 19 and 20. Actual useful lives may differ from

those made due to technical and moral depreciation.

Impairment of inventories

The Group recognizes impairment of immovable and obsolete inventories to their net realizable value. The

management estimates annually the adequacy of this impairment and the cost price of inventories is reduced to their

expected net realizable value. As of 31 December 2024, the best estimate of the required impairment of inventories is

BGN 140,892 thousand (31 December 2023: BGN 200,884 thousand). Additional information is provided in note 25.

Recognition and measurement of expected credit losses on debt instruments measured at amortized cost

Measuring the expected credit loss of financial assets carried at amortized cost (loans, receivables, cash and cash

equivalents) requires the use of models and significant assumptions about future economic conditions and credit

behaviour of customers and debtors. To implement these requirements, Group’s management makes a number of
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
47
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
significant assessments, determining criteria for identifying and assessing significant increases in credit risk,

appropriate models and assumptions for measuring expected credit losses, establishing and assessing the relationship

between historical default rates and the behaviour of certain macro indicators to reflect future effects in the calculation

of expected credit losses.

Approach to impairment of cash in banks

Cash and cash equivalents are the most highly liquid financial instruments. They are not bearers of settlement risk,

and the liquidity risk they bear is limited to the technical possibility that an order with them will not be executed.

However, cash deposited with banks carries credit risk from the counterparty (default risk). Counterparty risk is the

probability that the counterparty to a financial transaction will fail to meet its contractual obligations. The Group

applies the standardized approach for calculating the expected credit losses of cash in banks, using the credit rating of

the financial institutions in which the Group has deposited its cash to determine the loss from default in the parameters

of the model. As of 31 December 2024, management’s b est estimate of expected credit losses on cash at banks

amounted to BGN 6,259 thousand. (31 December 2023: BGN 12,140 thousand). (Note 27).

Cash and cash equivalents include deposits pledged as collateral for counter obligations, which are classified as cash

provided and are provided as collateral in the consolidated statement of financial position. As of 31 December 2024,

management's best estimate of expected credit losses of cash posted as collateral amounted to BGN 111 thousand.

(31 December 2023: BGN 207 thousand). (Note 27).

Approach for impairment of short-term trade and other receivables and receivables from related parties

The Group applies a simplified approach to calculating expected credit losses for trade receivables that do not contain

a financing element.

For the purpose of determining the expected credit losses, modeling is performed at the client’s industry level.

Modeling is the inherent derivation of the financial risk that customers bear to the companies in the Group.

The expected credit losses are calculated for each single receivable (invoice, interest sheet, etc.), adjusted on the basis

of the days in arrears and the standard payment cycle by the counterparty. The average number of days of delay per

client is determined on the basis of historical information for the period of coverage of receivables by clients. The

retrospective review is performed for a period of 3 to 5 years.

The additional risk is identified on the basis of historical experience for the collection of receivables, including

deteriorating financial condition, liquidity problems and other difficulties.

The assessment of the ratio between the observed historical data on default, the forecast economic conditions, the

determination of the risk by industries and the amount of the expected credit losses is a significant assessment.

Information on the impairment of expected credit losses of the Group is presented in note 23 Trade and other

receivables, note 35 Related party disclosures, note 37 Financial risk management objectives and policies.

Approach for impairment of receivables with an element of financing

The Group applies an individual approach to impairment of receivables with an element of financing and loans. The

impairment model is based on the cash flows agreed in the terms of the financial instrument, as well as the assumptions

and estimates of expected cash flows and the feasibility of the financial asset adopted by management in preparing

the financial statements.

Expected credit losses represent a probabilistic weighted estimate of credit losses (i.e. the present value of each

shortfall) for the expected maturity of the financial instrument. Cash deficit is the difference between the cash flows

due to the Group in accordance with the contract and the cash flows that the Group expects to receive. As expected

credit losses take into account the amount and timing of payments, expected credit loss is recognized even if the Group

expects the asset to be repaid in full, but later than the due date.

Depending on the characteristics of the asset and the counterparty, the expected future cash flows of the asset may

differ materially from the agreed ones. This would also lead to significant levels of expected credit losses on the asset .
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
48
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
A revision of the expected future cash flows of each specific asset is performed at each reporting date.

Approach to impairment of court and awarded receivables

In cases where the Group has taken legal action to satisfy its receivables, they are classified as “court receivables”.

This type of receivables is characterized by complete default – i.e. unwillingness or inability of the client to settle their

obligation. For this reason, regardless of the availability of decisions of the judicial authorities and the initiated

enforcement procedures, the collection of these receivables and resp. the expected future cash inflows are low and the

probability of default has already occurred relative to the original asset, i.e. is equal to 100%.

Expected credit losses represent the sum of expected credit losses for each lawsuit and award receivable based on the

historical recoverability of that asset class. Additional information is also provided in note 23 Trade and other

receivables and note 37 Financial risk management objectives and policies.

Revenue from contracts with clients

In recognizing revenue from contracts with clients, management makes various estimates, estimates and assumptions

that affect the reported revenue, expenses, assets and liabilities under contracts. The key estimates and assumptions

that have a material effect on the amount and timing of revenue recognition from contracts with customers are

disclosed in note 4.9 Revenue recognition.

Assets with the right of use and liabilities under leasing contracts

The management makes estimates based on its assessments of the elements of the lease in the contracts, the probable

terms of the leases, the options for extension and termination, the determination of the differential interest rate, etc.

upon recognition of “assets with the right of use” and liabilities under leasing contracts. These estimates affect the

reported income, expenses, assets and liabilities under leasing contracts and the corresponding disclosures.

As a result of uncertainty about these assumptions and estimates, changes in the carrying amount of usable assets,

lease liabilities and reported costs and income may arise as a result of changes in revaluations or changes in leases.

Additional national tax

The requirements of Pillar two of Taxation have been transposed into Bulgarian law and entered into force on 1

January 2024. As a result, the Group is subject to an additional national tax under Article 260a25 of the Corporate

Income Tax Act. The supplementary tax charge relates to the Group's operations in Bulgaria where the statutory

corporate income tax rate is 10%. In 2024, the Group has recorded a current tax expense of BGN 19,378 thousand

relating to the top-up tax (2023: zero) based on judgements and calculations. The final declaration and payment of

this tax will be in subsequent accounting periods and may differ from the amount accrued in 2024 .

5. Segment reporting

Management currently defines the following products and services of the Group as operating segments as described

in note 4.6 “electricity”, “natural gas”, “coal” and “administrative activities”. These operating segments are monitored

by the management, which takes strategic decisions based on the adjusted operating results of the segments.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
49
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In addition, smaller operating segments that do not exceed the quantitative thresholds are grouped into the “administrative a ctivity” segment, whose activity and main source of

revenue is the provision of services to companies from other segments of the Group. The information for the individual segments can be analyzed for the presented rep orting periods

as follows:

As of 31 December 2024 Electricity Natural gas Coal Administrative activity Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Revenue from sales and other operating income from: - external customers 6,267,236 2,341,614 227,996 4,590 8,841,436
- other segments 1,657,716 242,327 153,277 625,342 2,678,662
Segment Revenue 7,924,952 2,583,941 381,273 629,932 11,520,098
Changes in balances of production and work in progress 14,089 15 38,236 - 52,340
Costs for acquisition of property, plant and equipment in an economic way 61,858 - 9,637 - 71,495
Cost of natural gas, electricity and other assets sold (3,431,763) (1,654,435) (9,176) - (5,095,374)
Expenses for materials (683,787) (7,633) (96,051) (237) (787,708)
Hired services expenses (430,287) (44,805) (32,590) (7,826) (515,508)
Depreciation and amortization costs (521,841) (305,660) (86,597) (1,490) (915,588)
Personnel expenses (901,771) (87,290) (386,055) (12,450) (1,387,566)
Reversal of /(expenses for) impairment 17,082 (71,895) (132) (62,677) (117,622)
Net impairment of property, plant and equipment 2,173 431 (19,572) (13) (16,981)
Costs for provisions (466,288) (34,351) (70,575) - (571,214)
Other operating expenses (946,502) (126,074) (6,166) (1,315) (1,080,057)
Technological costs of natural gas - (140,208) - - (140,208)
Operating profit/(loss) of the segment from continuing operations 637,915 112,036 (277,768) 543,924 1,016,107
Segment assets 18,721,451 10,070,470 1,096,045 7,225,560 37,113,526
Segment liabilities 5,877,727 4,413,003 539,999 2,707,343 13,538,072

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
50
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
As of 31 December 2023 Electricity Natural gas Coal Administrative activity Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Revenue from sales and other operating income from: - external customers 7,876,206 3,323,046 319,610 3,760 11,522,622
- other segments 941,215 206,123 133,290 857,245 2,137,873
Segment Revenue 8,817,421 3,529,169 452,900 861,005 13,660,495
Changes in balances of production and work in progress 4,928 2 55,313 - 60,243
Costs for acquisition of property, plant and equipment 46,872 - 11,568 - 58,440
Cost of natural gas, electricity and other assets sold (3,781,408) (2,521,641) (14,648) - (6,317,697)
Expenses for materials (1,024,452) (6,482) (161,034) (301) (1,192,269)
Hired services expenses (390,779) (43,290) (37,600) (4,326) (475,995)
Depreciation and amortization costs (513,369) (304,469) (81,278) (1,317) (900,433)
Personnel expenses (843,943) (82,688) (356,186) (10,845) (1,293,662)
Reversal of /(expenses for) impairment 14,457 (44,551) 5,301 119,670 94,877
Costs for provisions (78,249) (1,230) 15,136 (615) (64,958)
Other operating expenses (1,213,161) (94,949) (19,622) (1,099) (1,328,831)
Technological costs of natural gas - (133,835) - - (133,835)
Operating profit/(loss) of the segment from continuing operations 1,038,317 296,036 (130,150) 962,172 2,166,375
Segment assets 16,921,946 9,378,832 1,022,580 6,817,221 34,140,579
Segment liabilities 5,234,727 4,153,381 348,292 2,688,922 12,425,322

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
51
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The total amount of revenue, operating profit, segment assets and liabilities are compared to the corresponding items

in these consolidated financial statements of the Group, as follows:

2024 2023
BGN’000 BGN’000
Revenue
Total segment revenue 11,520,098 13,660,495
Elimination of intra-segment revenue (2,678,662) (2,137,873)
Group’s revenue 8,841,436 11,522,622
Profit
Operating profit of the segments 1,016,107 2,166,375
Elimination of profits from transactions between segments (559,779) (837,665)
Operating profit of the Group 456,328 1,328,710
Profit from business combination - 14,446
Profit from sale of investment - 271
Share of equity accounted investments 3,716 44,496
Finance costs (173,286) (192,759)
Finance income 69,535 60,397
Profit of the Group before taxes 356,293 1,255,561
Total assets of the segments 37,113,526 34,140,579
Consolidation (7,021,960) (6,431,494)
Assets of the Group 30,091,566 27,709,085
Total liabilities of the segments 13,538,072 12,425,322
Consolidation adjustments (3,392,711) (3,052,905)
Liabilities of the Group 10,145,361 9,372,417

6. Revenue from sales

2024 2023
BGN’000 BGN’000
Revenue from sales of electricity 4,332,530 5,339,665
Revenue from sales of natural gas 1,418,251 2,507,716
Revenue from sales of coal 146,305 281,196
Revenue from other sales, including: 1,561,190 1,546,189
Related to sale of electricity 691,717 771,234
revenue from access price 93,540 77,163
revenue from reactive electricity 40,278 18,801
revenue from connection price 49,725 61,980
revenue related to transmission through the electricity transmission network 508,174 613,290
Related to natural gas 806,206 689,787
revenue from natural gas transit 708,439 606,441
Revenue from natural gas transmission 76,822 70,065
Revenue from natural gas storage 20,945 13,281
Revenue from water supply service 6,439 6,951
Revenue from sale of heat 4,105 3,848
Revenue from transport services 2,689 7,443
Revenue from telecommunication services 3,115 3,649
Revenue from other services 46,919 63,277
7,458,276 9,674,766

6.1. Revenues from contracts with customers
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
52
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Segments Electricity Natural gas Coal Administ rative activity Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
1. Revenue by types of goods or services
Revenue from sales of electricity 4,320,626 - 11,904 - 4,332,530
Revenue from sales of natural gas - 1,418,251 - - 1,418,251
Revenue from sales of coal - - 146,305 - 146,305
Revenue related to the transmission and management of the electricity transmission network 691,717 - - - 691,717
Revenue from natural gas transmission - 806,206 - - 806,206
Revenue from water supply service 6,439 - - - 6,439
Revenue from sale of heat 4,105 - - - 4,105
Revenue from transport services - - 2,689 - 2,689
Revenue from telecommunications services - - - 3,115 3,115
Revenue from contracts with customers 6,378 39,304 328 909 46,919
Total revenue from contracts with customers 5,029,265 2,263,761 161,226 4,024 7,458,276
2. Geographic markets - Domestic market 5,029,265 1,455,157 161,226 4,024 6,649,672
- Foreign markets - 808,604 - - 808,604
Total revenue from contracts with customers 5,029,265 2,263,761 161,226 4,024 7,458,276
3. Moment in time for revenue recognition
Goods transferred at a certain point in time - - 149,322 - 149.322
Services transferred over time 5,029,265 2,263,761 11,904 4,024 7,308,954
Total revenue from contracts with customers 5,029,265 2,263,761 161,226 4,024 7,458,276

The balances on contracts with customers are as follows: 31 December 2024 31 December 2023
BGN’000 BGN’000
Receivables from contracts with customers - third parties,net of impairment 1,431,413 1,279,510
Receivables from contracts with customers - related parties,net of impairment 584,188 398,139
Liabilities under contracts with customers 122,377 47,803

Electricity

In 2024, there was a decline in electricity market prices compared to last year, which is also the reason for the

significant decrease in revenues. Exchange revenues in the 2024 reporting period are 25% lower compared to 2023 as

a result of the reported decline in energy market prices and reallocated increased volume to the regulated market. The

average selling price of the electricity produced by NPP Kozloduy in all directions in 2024 is BGN 135.99/MWh and

by NPP Kozloduy EAD - BGN 205.02 /MWh., marked a decrease of 17.3% compared to 2023.

As of 1 May 2023, the new Electricity Trading Rules (ETR) have come into force, which have been amended in the

part of the Methodology for Determination of Balancing Energy Prices (Methodology). The main purpose is the

implementation of an adequate mechanism for calculating the expenses of balancing of the balancing group

coordinators (BGC) by settlement period, regulation status - position of the imbalance (surplus/shortage) and direction

of payment. The operation of the ‘Pay as clear’ principle requires a liability to pay in each case where the forecast is

in discrepancy with the balance - both in surplus and in shortage. With this, the Methodology can be considered to
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
53
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
prioritise the operation of the electricity system at the expense of all other participants, as BGC does not actually have

sufficient real-time information on the activated balancing reserve and cannot calculate their group's imbalance costs

for each settlement period.

For Bulgaria market zone, significant amendments were adopted in the relevant legislation - the Electricity trading

rules (ETR) and the Rules for organized power exchange market for electricity (ROPEME), which in turn determine

the behavior of commercial participants and influence cash flows.

The amendments to the ROPEME, which came into force on 9 June 2023, have once again limited the Group's ability,

through the nuclear power plant, as a legally obliged entity, to transact on an organized exchange market. With the

decision for permanent suspension of the work of the "Continuous Trading" Screen and its removal from the "Bilateral

Contracts" (BC) segment, the possibility of trading the "Weekend" basic product has disappeared. Another main goal

of the amendments was the regulation of a new mechanism for managing and limiting the financial risk for the

exchange operator by introducing a limit for trading in the short-term market segments, justified by the presence of

strong volatility in the spot market prices. Focusing all efforts on improving the performance of short-term segments

only causes a distortion in the market model and raises the risk of adverse financial consequences in the functioning

of the long-term segment. The prioritization in the provision of protection against the risks for the spot trade only,

especially in the conditions of volatile prices, is made at the expense of underestimating the risks in the BC segment.

Sale of electricity on the balancing market

In May 2023, the methodology for setting the balancing energy prices was changed by introducing a regulation status

and setting a single unbalance price for regulation status 0, -1 and 1, and maintaining two unbalance prices for

regulation status 2.

As of 1 May 2024, a new Methodology for Balancing Energy Pricing was launched with the introduction of a single

price, aiming to harmonize the regulatory framework with European regulations and directives and to enable the

Group, through its subsidiary ESO EAD, to participate in European platforms for balancing energy exchange. The

adoption of the new Methodology introduces additional mechanisms to regulate imbalances and to discipline trading

participants, and these rules apply to all traders and encourage them to better forecast their schedules. It provides

clearer rules and a mechanism for setting balancing energy prices that take into account the interests of all market

participants. The application of the methodology has led to a significant reduction in imbalances for commercial

participants as they are incentivized to forecast their schedules as accurately as possible.

The main reason for the adoption of the Methodology is the amendment of Art. 21, para. 1, item 11 of the Energy Act

/EA/, according to which it should not be part of the Electricity Trading Rules1, but be adopted as an independent act.

With these changes in the EA the power of the EWRC under Art. 1(8) of the EA to set annually a ceiling price for

transactions on the balancing energy market.

Once the Group, through its subsidiary ESO EAD, joins the balancing platforms, the Bulgarian balancing service

providers will actually compete with the European ones.

In 2024, the activated energy for upward regulation is 189,516 MWh compared to 516,450 MWh in 2023, a reduction

of 63.30%. Of the total activated energy for upward regulation, the activated energy from participation in primary and

automatic secondary upward regulation is 129,257 MWh and from participation in manual secondary upward

regulation is 60,259 MWh.

Downward regulation energy is 208,762 MWh, compared to 172,665 MWh for 2023, an increase of 20.91%. Of the

total energy for down regulation, the activated energy from participation in primary and automatic secondary down

regulation is 67,763 MWh and from participation in manual secondary down regulation is 140,999 MWh.

In 2024, the total energy shortfall for the country is 1,162,795 MWh, compared to 1,646,093 MWh in 2023, a reduction

of 29.36%. The total energy surplus in 2024 is 1,410,346 MWh compared to 1,194,352 MWh in 2023, an increase of

18.08%.

Natural gas

The revenues from natural gas transmission include the provision of access and transmission services on the gas

transmission network, from the provision of natural gas storage services at the Chiren gas storage facility and from

1 ETR – Electricity Trading Rules
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
54
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
binding capacity reservation contracts concluded for a period of 20 years following an Open Season procedure, in

accordance with the EU-wide legal framework.

The products offered by the Group through the Balkan Gas Hub during the reporting period on the short-term segment

increased compared to the same period of the previous year by 26% reaching a transaction volume of 118,475 MWh.

IOn the long-term segment (including virtual trading point and brokerage transactions) in the period to 31 December

2024, transaction volumes reached 26,614,856 MWh, up 20% year-on-year on this segment.

The Group, through Gas Hub Balkan, offers reporting services for transactions concluded or registered through the

Gas Hub Balkan system in relation to the requirements of Regulation (EU) No.1227/2011 on wholesale energy market

integrity and transparency, through the functionality developed and implemented in the Company's information

system. This type of service is divided into two subtypes:

(1) A reporting service where the Group sends to ACER data on the relevant market participant's wholesale

energy product transactions executed on the organized market of Gas Hub Balkan EAD, including agreed

and unagreed orders and

(2) Data access service for self-reporting purposes – for customers using another reporting organization. The

Group also offers access to ready-to-report XML documents containing transaction data of the relevant

market participant in the organized natural gas market, prepared in the format and according to the

requirements of ACER. Each Platform Member also has the right to provide a Declaration of Opt -Out from

the use of the reporting services, this releases the “Group from the obligation to provide and/or rep ort data

and this remains the responsibility of the Platform Member itself as a participant in the wholesale energy

market. The Group has successfully complied with the requirements relating to the disclosure of “inside

information” arising from Article 4 of Regulation (EU) No 1227/2011 and Article 10(1) of Regulation (EU)

No 1348/2014.

In relation to these requirements, an Insider Disclosure Platform (BGH IIP) has been successfully implemented in

accordance with the requirements of REGULATION (EU) No 1227/2011 on wholesale energy market integrity and

transparency, and in accordance with the requirements of the Energy Licensing Ordinance, fully meeting the

requirements of EWRC and ACER for the disclosure of inside information in its entirety, including allowing TSOs to

meet their obligations to disclose unavailable capacity and other inside information in the form of Urgent Market

Messages (UMMs). It should be noted that the service is available to all market participants, including traders and

TSOs in and for all balancing zones in Europe, and that the service is free of charge for Group m embers through the

Balkan Gas Hub.

Revenue is recognized over time.

Coal

In 2022, the Group will start exporting coal to the Republic of Serbia. On 17 June 2022, a contract for purchase and

sale of lignite coal was signed between the subsidiary Mini Maritsa Iztok EAD and the Serbian company - Virom

Group DOO. The contract is concluded for the period from its signing until 30 April 2023, with an option to extend it

for another year. The contracted quantities of coal are in the amount of 1,750 thousand tons/year (with an option for

increase to 2,000 thousand tons/year in the second year). An Additional Agreement to the Contract was concluded on

2 May 2023. With the agreement, the price is changed, the term of the contract is extended by another year until 30

April 2024, as well as the agreed indicative quantities of coal for 2,000 thousand tons/year. In 2024, no coal was

supplied to Virom Group DOO .

Performance obligations

The Group, through its subsidiary Mini Maritsa Iztok EAD, has concluded long-term contracts for sale of coal with

its main customers.

At the end of February 2024, the power purchase agreement between Contour Global Maritsa East 3 AD and NEK

EAD expired. Related to this is the expiry of the long-term lignite supply contract between Kontur Global Maritsa

East 3 AD and the Group through its subsidiary Mini Maritsa-Iztok EAD, which also expired at the end of February

2024. Negotiations are underway to extend the agreement.

Pursuant to a long-term coal sales agreement with AES - 3C Maritsa East 1 EOOD (AES), the Group has an obligation

to supply a minimum annual quantity of 5,184 thousand standard tonnes of lignite. During the current period, 3,188

thousand standard tonnes have been delivered (for 2023: 3,271 thousand standard tonnes).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
55
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
7. Other operating income

Other income includes transactions that are incidental to the Group's principal activities and are revenue or income

that is recognised under other standards and is outside the scope of IFRS 15.

2024 2023
BGN’000 BGN’000
Revenue from the Security of the Electricity System Fund 1,119,411 1,669,008
Income from penalties 125,714 59,865
Revenue from financing (note 30) 39,053 32,399
Revenue from financing for electricity 32,525 7,484
Rental income 2,283 2,103
Revenue from sale of current assets 6,830 5,425
Income from insurance compensations 4,895 6,019
Revenue from surplus assets 1,499 2,010
Profit from sale of property, plant and equipment 1,008 231
Other revenue 49,942 63,312
1,383,160 1,847,856

Revenue from the Security of the Electricity System Fund

With the amendments to the Energy Act (EA), SG, No.56 of 2015, the Electricity System Security Fund (ESS Fund)

was established as a legal entity based in Sofia. The provisions regulating the activity of the Fund are set out in Art.

36b to Art. 36k of the Energy Act.

One of the objectives of the fund is the management of funds to cover the costs incurred by the public supplier arising

from its obligations to purchase electricity from producers connected to the electricity transmission grid, under long -

term purchase contracts for availability and electricity, as well as that produced from renewable sources, from high -

efficiency combined production of electricity and heat and the amount of electricity from producers using local

primary energy sources (fuel), up to 15 percent of all primary energy necessary to produce electricity. The other costs

of the public supplier that can be covered by the fund are those determined by a decision of the commission, including

for past regulatory periods. Payment to the public supplier to cover the costs with funds from the fund is made on

monthly basis.

For the regulatory period 1 July 2024 - 30 June 2025, two price decisions are in effect: No.Ts-17 of 30 June 2024

and No.Ts-3 of 1 January 2025. According to what is established in them, the costs of the public supplier to be

covered by the SESF, are estimated at a total of BGN 806,043 thousand and include compensation for costs for the

previous period in the amount of BGN 35,027 thousand. These expenses for the previous period include:

- expenses for AES-3C Maritsa East 1 EOOD for a claim by the company for penalties claimed by the

subsidiary Mini Maritsa-Iztok EAD for 2023;

- expenses for AES-3C Maritsa East 1 EOOD, related to a claim against the company for penalties from

Kaolin EAD for 2023;

- costs for a 5% contribution to the SESF, not compensated in the prior period.

The costs of the public provider to be compensated by the SESF for the current regulatory period 2024 – 2025 include:

- costs for AES-3C Maritsa East1 EOOD for a claim from the subsidiary Mini Maritsa-Iztok EAD for

unpurchased contracted quantities of coal in 2024 in the amount of BGN 22,809 thousand;

- costs for AES-3C Maritsa East 1 EOOD for a claim from Kaolin EAD for unpurchased contracted quantities

of limestone in 2024 in the amount of BGN 2,109 thousand;

- costs for contribution of 5% under Article 36f of the EA to AES-3C Maritsa East 1 EOOD in the amount of

BGN 56,117 thousand;

- costs for payment of the "access" price for AES-3C Maritsa East 1 EOOD in the amount of BGN 14,694

thousand;

- costs for purchased energy above the estimated market price from AES-3C Maritsa East 1 EOOD in the

amount of BGN 489,493 thousand;
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
56
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- costs for purchased energy from RES up to 0.5 MW above the estimated market price in the amount of BGN

39,108 thousand;

- costs for purchased energy from highly efficient combined production (HECP) up to 0.5 MW above the

estimated market price in the amount of BGN 1,293 thousand;

- costs for purchased energy from TPP Maritsa Iztok 2 EAD in the amount of BGN 238,076 thousand.

The total amount of revenue from the SESFd has been reduced by the EWRC by the amount of BGN 92,683 thousand,

which is the EWRC's calculation of the public supplier's over-recovery for the previous regulatory period 2023-2024.

As of 31 December 2024, an estimate of the amounts to be recovered from the SESF has been made. As a result of

the compensation mechanism reflected in the EWRC Decision No.Ts-3 of 01.01.2025, the non-recovery of costs of

the public supplier by the end of the regulatory period through revenue from the SESF for costs of purchased energy

from RES up to 0.5 MW above the estimated market price in the amount of BGN 20,327 thousand as a result of an

expected higher reporting price of the purchased energy compared to the one forecast by the EWRC in the decision

and for costs for purchased energy above the estimated market price from AES-3C Maritsa East 1 EOOD in the

amount of BGN 43,679 thousand as a result of an insufficient limit set by the EWRC for the SESF. (2024: BGN

18,782 thousand, 2025: BGN 24,897 thousand).

In essence, the funds provided by the SESF are government grants that fall within the scope of IAS 20, Accounting

for Government Grants and Disclosure of State Aid.

The funds provided by the SESFd are recognized in profit or loss on a systematic basis (monthly) during the periods

in which the entity recognizes as an expense the related costs, intended to be compensated by the grant until the fund's

budget is exhausted. In the process of filing claims for compensation, if the costs of the Company exceed those

specified in the EWRC price decision for the regulatory period, even if they meet the condition for reimbursement,

the excess should be recognized as income from financing after receipt of the funds. This is due to the fact that the

moment of their recovery cannot be determined due to the exhaustion of the budget for compensations of the Fund.

For the period from 1 January 2024 to 31 December 2024, the Group through its subsidiary NEK EAD has been

recognized revenue for compensation of costs of the public supplier in the amount of BGN 1,119,411 thousand.

(2023: BGN 1,669,008 thousand).

Revenue under Regulation (EU) 2019/943 of the European Parliament and of the Council of the European Union

Possessing the license for transmission of electricity and assets from the electricity system, the Group is obliged to

apply the requirements of Regulation (EU) 2019/943 (former No.714/2009) of the European Parliament and of the

Council of 5 June 2019. According to article 19 of the Regulation, all revenue from the distribution of interconnectors

shall be used for the following purposes:

(a) to ensure the actual availability of allocated capacity, including guarantee compensation, or

(b) to maintain or increase the interconnection capacity by optimizing the use of the existing interconnectors through

coordinated corrective action, where applicable; or to cover costs arising from network investments related to the

reduction of congestion in interconnectors.

If the revenue cannot be used effectively for the purposes of points (a) and/or (b) of the first subparagraph, it may be

used subject to the approval of the regulatory authorities of the Member States concerned up to a maximum amount

to be determined by those regulatory authorities as revenue to be taken into account by the regulatory authorities when

approving the methodology for calculating network tariffs and/or fixing network tariffs.

In 2024, the Group, through its subsidiary Elektroenergien Sistemen Operator EAD, a total of BGN 28,197 thousand

in revenue was reported under the Regulation (2023: BGN 6,729 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
57
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Revenue in connection with compensations for electricity

In 2024, the Group reported revenues related to electricity compensation of BGN 32,525 thousand (for 2023: BGN

7,484 thousand). The decrease is a result of the lower price of purchased electricity.

8. Cost of natural gas, electricity and other current assets sold

2024 2023
BGN’000 BGN’000
Electricity (1,851,703) (2,924,176)
Natural gas (1,246,546) (2,293,287)
Costs for unused capacity at: (295,219) (106,038)
Entry point Strandzha1/Malkochlar (266,943) (72,926)
Entry point Kulata/Sidirokastro and Agia Triada (11,304) (30,379)
Entry point Stara Zagora (16,972) (2,733)
Other current assets (12,048) (17,226)
(3,405,516) (5,340,727)

The costs for unused capacity in 2024 are related to the obligations of the Group through the subsidiary Bulgargaz

EAD to ensure a continuous and secure supply of natural gas. This commitment requires access to and provision of

secure routes for its delivery. After termination of the piped natural gas supplies from OOO Gazprom Export, the

Group, through its subsidiary Bulgargaz EAD, had to provide alternative routes for supplies in the conditions of

limited re-gasification and transmission capacities (only Revitusa and the entry-exit point Kulata /Sidirokastro) and

their increased competitive demand in 2022. As a result, the prices of the transmission capacity products increased in

the conditions of the auction to 446% above the initially announced price, and the value of the regasification slots

reached prices above 4 EUR/MWh at the Revitusa terminal.

With the signing of the Agreement for access to Botash's terminals and the ensured flexibility of supplies from

01.04.2023, the Group, through the subsidiary Bulgargaz EAD, assumed the obligation to pay a daily fee for the

provided services of regasification, storage, capacity, transmission and flexibility. The quantities are provided upon

request at entry point Malcochlar/Strandja 1.

The costs for unused capacity, above the amount of the actual consumption, are the result of the change in the business

model and the need to provide alternative routes for the supply of liquefied natural gas, in the presence of a limited

number of terminals in the region. In case of non-payment by the customers and the corresponding reduction in the

realized amount of sales, the sum of the cost of the non-use of the provided capacity is accounted for at the expense

of operating costs.

9. Costs for acquisition of property, plant and equipment in an economic way

During the current period, expenses in the amount of BGN 71,495 thousand (2023: BGN 58,440 thousand) were

capitalized for the construction or creation of assets of property, plant and equipment by way of business by the Group

companies. These expenses include expenses for materials, including fuels and lubricants, external services, personnel

expenses and other expenses.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
58
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
10. Expenses for materials

2024 2023
BGN’000 BGN’000
Fuel (191,177) (141,988)
Spare parts (57,081) (57,097)
Electricity (45,911) (77,884)
Reagents, limestone and other main materials (31,192) (20,239)
Materials for repair and maintenance (46,039) (35,816)
Other materials and raw materials (25,115) (23,894)
(396,515) (356,918)

11. Hired services expenses

2024 2023
BGN’000 BGN’000
Repairs (171,204) (167,055)
Insurance services (59,890) (59,166)
Security (87,678) (73,862)
Concession fees and licenses (16,301) (23,230)
Other fees (4,001) (4,327)
Transport services (18,451) (18,973)
Consultancy service (24,430) (12,560)
Communication services (5,324) (4,181)
Rent (775) (617)
Natural gas storage costs (1,560) (303)
Other (50,344) (48,197)
(439,958) (412,471)

Audit services

These consolidated financial statements have been audited by consortium DZZD AUDIT BEH with participants in it

Grant Thornton OOD and Zaharinova Nexia EOOD, based on a contract concluded between Bulgarian Energy

Holding EAD and DZZD AUDIT BEH.

The remuneration of the registered auditors amounts to BGN 1,452 thousand excluding VAT and includes an

independent financial audit of the annual and interim consolidated financial statements of BEH EAD, NEK EAD,

NPP Kozloduy EAD, TPP Maritsa East 2 EAD, Mini Maritsa-Iztok EAD, Bulgargaz EAD, NPP Kozloduy - New

Builds EAD, HPP Kozloduy EAD, National Energy Operator EAD, and Minproekt EAD, as well as the annual and

interim consolidated financial statements of BEH EAD and NPP Kozloduy EAD.

In 2024, the audit firm Grant Thornton OOD received remuneration for permitted services under two engagements to

perform an audit of forecast financial information in the total amount of BGN 39 thousand and one engagement for

agreed-upon procedures of a subsidiary in the amount of BGN 44 thousand.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
59
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
1 2. Reversal of/(expenses for) impairment of financial and non-financial assets, net

2024 2023
BGN’000 BGN’000
Reversal of /(expenses for) impairment of trade receivables, net (24,214) 61,660
Reversal of impairment of trade receivables from related parties, net (1,320) 5,238
Reversal of /(expenses for) impairment of other receivables (897) 4,145
Reversal impairment of court and awarded receivables, net 1,373 11,714
Accrued impairment loss on cash in bank accounts, net 6,114 (10)
Accrued impairment loss on other current assets, net (91,760) (46,978)
Total impairment of financial and non-financial assets, net (110,704) 35,769
Reversal of impairment of equity accounted investments 372 316
(110,332) 36,085

13. Personnel expenses

2024 2023
BGN’000 BGN’000
Remuneration (859,240) (861,468)
Social security (210,849) (203,521)
Social costs (242,293) (199,666)
Accrued expenses for long-term retirement benefits (note 31) (81,121) (16,907)
Unused annual leave and social security expenses thereto 5,940 (12,083)
(1,387,563) (1,293,645)

14. Other operating expenses

2024 2023
BGN’000 BGN’000
Contributions to the Decommissioning of Nuclear Facilities Fund and the Radioactive Waste Fund (213,560) (265,190)
Contributions to the Security of the Electricity System Fund (246,842) (271,072)
Contributions to the Security of the Electricity System Fund under Regulation 2022/1854 (432,713) (659,632)
Technological costs of natural gas (24,863) (34,636)
Food and work clothes (16,487) (34,806)
Expenses for local taxes and fees (11,366) (11,042)
Disposal of inventories and property, plant and equipment (11,883) (4,285)
Training and qualification (2,170) (1,107)
Business trips (6,704) (5,204)
Costs for expense tax (2,704) (2,389)
Fines and penalties (29,880) (1,950)
Costs for VAT, excise and other taxes (5,298) (2,392)
Other (32,715) (21,369)
(1,037,185) (1,315,074)

The expenses for fines and penalties include BGN 22,809 thousand in penalty expenses for coal of AES - 3C Maritsa

East 1 EOOD, BGN 3,256 thousand in penalty expenses for limestone of AES - 3C Maritsa East 1 EOOD, BGN 5,395

thousand in late payments to suppliers under contracts, etc.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
60
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Expenditures according to decisions of the Council of Ministers for compensation programs for non -household end

consumers under Regulation 2022/1854

Electricity producers with electricity generation installations with an installed capacity of more than 1 MW, whose

market revenues are derived from the sale of electricity produced from sources referred to in Article 7(1) of Council

Regulation (EU) 2022/1854 of 6 October 2022 on emergency intervention to address high energy prices (OJ, LI 261/1

of 7 October 2022), hereinafter referred to as Regulation (EU) 2022/1854, and for energy produced from coal and

hydroelectric plants according to Art. 8(1)(c) and (e) of Regulation (EU) 2022/1854, shall pay to the Security of the

Electricity System Fund earmarked contributions representing the positive difference between the market revenue net

of value added tax and the revenue ceiling calculated by applying the values for the relevant type of generator,

excluding transactions in balancing energy required for the needs of balancing the electricity system by ESO EAD.

The amount of the target contribution is calculated for each transaction.

By Decision No.167 of 14 March 2024 of the Council of Ministers in force from 1 January 2024 to 30 June 2024, the

values in BGN per MWh, which serve to calculate the revenue ceiling for the respective type of electricity producer,

have been set as follows:

- for a producer of electricity from a nuclear power plant – BGN 150 per MWh;

- for a producer of electricity from a coal-fired condensing power plant, including from lignite coal - BGN

300, increased with the multiplied by 1.32 average monthly price per ton CO2 emission allowances for one

MWh;

- for a producer of electricity from coal with the addition of biomass fuel (solid or gaseous biomass fuels)

and/or waste and/or petroleum products and/or a combination thereof - BGN 300, multiplied by 0.9 average

monthly price per tonne of CO2 emission allowances, per MWh;

- for a producer ofelectricity from renewable sources without a contract for compensation with premiums –

BGN 300 for one MWh.

- for electric energy from hydroelectric plants owned by National Electric Company EAD - BGN 200 for one

MWh.

The Group, through the public supplier NEK EAD, contributes to the Security of the Electricity System Fund with

targeted contributions from each transaction concluded at freely negotiated prices with a delivery period from 1

December 2022 to 30 June 2023, with the exception of transactions with balancing energy . The amount of the target

contribution from each transaction is calculated as the positive difference between the market revenue without value

added tax and the purchase price per amount of electricity sold, increased by 18 percent.

By Decision No.537 of 25 July 2024 of the Council of Ministers in force from 1 July 2024 to 31 December 2024, the

values in BGN per MWh used to calculate the revenue ceiling for the respective type of electricity producer were

determined as follows:

- for a producer of electricity from a nuclear power plant – BGN 150 per MWh;

- for a producer of electricity from a coal-fired condensing power plant, including from lignite coal - BGN

300, increased with the multiplied by 1.32 average monthly price per ton CO2 emission allowances for one

MWh;

- for a producer of electricity from coal with the addition of biomass fuel (solid or gaseous biomass fuels)

and/or waste and/or petroleum products and/or a combination thereof - BGN 300, multiplied by 0.9 average

monthly price per tonne of CO2 emission allowances, per MWh;

- for a producer ofelectricity from renewable sources without a contract for compensation with premiums –

BGN 300 for one MWh.

The Group, through the public supplier NEK EAD, contributes to the Security of the Electricity System Fund with

targeted contributions from each transaction concluded at freely negotiated prices with a delivery period from 1

December 2022 to 30 June 2023, with the exception of transactions with balancing energy . The amount of the target

contribution from each transaction is calculated as the positive difference between the market revenue without value

added tax and the purchase price per amount of electricity sold, increased by 18 percent.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
61
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The values, in BGN per MWh, used to calculate the revenue ceiling for electricity producers for the period from 1

January 2023 to 30 June 2023 shall be determined by Decision No 29 of 12 January 2023 of the Council of Ministers

as follows:

- for a producer of electricity from a nuclear power plant – BGN 180 per MWh;

- for a producer of electricity from a coal-fired condensing power plant, including from lignite coal - BGN

350, increased with the multiplied by 1.32 average monthly price per ton CO2 emission allowances per MWh;

- for a producer of electricity from coal with added biomass fuel (solid or gaseous biomass fuels) and/or waste,

and/or oil products, and/or a combination thereof - BGN 350 increased with the multiplied by 0.9 average

monthly price per ton CO2 emission allowances per MWh;

- for a producer of electricity from renewable sources without a premium compensation contract – BGN 350

per MWh.

The Group, through the public supplier NEK EAD, contributes to the Security of the Electricity System Fund with

targeted contributions from each transaction concluded at freely negotiated prices with a delivery period from 1

December 2022 to 30 June 2023, with the exception of transactions with balancing energy . The amount of the target

contribution from each transaction is calculated as the positive difference between the market revenue without value

added tax and the purchase price per amount of electricity sold, increased by 18 percent.

By Decision No 580 of 30 August 2023 of the Council of Ministers in force from 1 July 2023 to 31 December 2023,

the values in BGN per MWh, which serve for the calculation of the revenue ceiling for the respective type of electricity

producer, have been determined as follows:

- for a producer of electricity from a nuclear power plant – BGN 150 per MWh;

- for a producer of electricity from a coal-fired condensing power plant, including from lignite coal - BGN

300, increased with the multiplied by 1.32 average monthly price per ton CO2 emission allowances for one

MWh;

- for a producer of electricity from coal with the addition of biomass fuel (solid or gaseous biomass fuels)

and/or waste and/or petroleum products and/or a combination thereof - BGN 300, multiplied by 0.9 average

monthly price per tonne of CO2 emission allowances, per MWh;

- for a producer ofelectricity from renewable sources without a contract for compensation with premiums –

BGN 300 for one MWh.

- for electric energy from hydroelectric plants owned by National Electric Company EAD - BGN 200 for one

MWh.

The Group, through the public supplier NEK EAD, contributes to the Security of the Electricity System Fund with

targeted contributions from each transaction concluded at freely negotiated prices with a delivery period from 1

December 2022 to 30 June 2023, with the exception of transactions with balancing energy . The amount of the target

contribution from each transaction is calculated as the positive difference between the market revenue without value

added tax and the purchase price per amount of electricity sold, increased by 18 percent.

The Group's cost of compensating non-domestic customers under Regulation 2022/1854 for 2024 is BGN 432,713

thousand (2023: BGN 659,632 thousand).

Contributions to the Security of the Electricity System Fund under Art. 36e of the Energy Act

According to the provisions of Art. 36f of the Energy Act, contributions to the Security of the Electricity System Fund

should be deducted and paid by the electricity producers from the revenue from the sold electricity without VAT; the

operators of the electricity and gas transmission networks from the revenue for access and transmission of electricity

and natural gas without VAT. Pursuant to this requirement, the Group through the companies Natsionalna

Elektricheska Kompania EAD, TPP Maritsa East 2 EAD, NPP Kozloduy EAD, Bulgartransgaz EAD and

Elektroenergien Sistemen Operator EAD accrue and pay their 5% contributions to the Security of the Electricity

System Fund.

The Group has recognized expenses for 2024 in the amount of BGN 246,842 thousand (2023: BGN 271,072 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
62
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Contributions to the Decommissioning of Nuclear Facilities Fund and the Radioactive Waste Fund

Pursuant to ordinances adopted by the Council of Ministers for establishing, collecting, spending and controlling funds

and the amount of contributions due to the Decommissioning of Nuclear Facilities Fund and the Radioactive Waste

Fund, the Group through the subsidiary NPP Kozloduy EAD makes contributions to the budget accounts of funds.

The due contributions are determined according to the rules established in the ordinances. The contributions are

reported as current expenses and participate as a pricing element in determining the price of electricity produced by

the Group through the subsidiary NPP Kozloduy EAD. For 2024, the expenses amount to BGN 213,560 thousand

(2023: BGN 265,190 thousand).

15. Finance income

2024 2023
BGN’000 BGN’000
Income from interest on receivables from Toplofikatsia Sofia EAD 32,372 55,510
Interest income on bank current account 22,889 3,046
Other interest income on financial instruments carried at amortized cost 1,774 1,774
Total interest income on financial instruments not carried at fair value through profit or loss 57,035 60,330
Dividend income and liquidation share 13 27
Foreign exchange profits, net 12,478 -
Other 9 40
69,535 60,397

16. Finance costs

2024 2023
BGN’000 BGN’000
Interest expense on loans reported at amortized cost (150,596) (149,514)
Interest expenses on leasing contracts (58) (13)
Total interest expense on financial instruments not carried at fair value through profit or loss (150,654) (149,527)
Interest expense on staff retirement benefits (note 32) (15,493) (17,776)
Bank fees (7,139) (6,600)
Foreign exchange losses, net - (18,856)
(173,286) (192,759)

17. Income tax expenses

The expected income tax expense based on the applicable tax rate for Bulgaria of 10% (2023: 10%) and the actual

recognized tax expense in profit or loss can be equated as follows:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
63
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
2024 2023
BGN’000 BGN’000
Profit before tax from continuing operations 356,293 1,255,561
Average taxable profit (ATP) for the period 2018-2021. - 19,177
Average taxable profit (ATP) for the period 2018-2021 increased by 20% - 23,012
Tax profit for 2022 - (140,596)
Intragroup eliminations 1,205 1,867
Realized loss within the Group - 7,216
Accounting Profit/Loss before tax 357,498 1,264,644
Tax rate 10% 10%
Expected income tax expenses (35,750) (126,464)
Tax effect of:
Increases in the financial result for tax purposes: (187,341) (184,063)
Reductions in the financial result for tax purposes: 114,709 140,246
Tax loss carried forward (35,379) -
Current income tax expenses (143,761) (170,281)
Deferred tax (expenses) / income:
Current expense in connection with Art. 260я25 of the Corporate
Income Tax Act (19,378) -
Occurrence and reversal of temporary differences 53,023 25,152
Income tax expenses (110,116) (145,129)
Deferred tax (expense) / revenues recognized in other comprehensive income (182,299) 42,561

Note 24 provides information on the values of deferred tax assets and liabilities recognized in profit or loss and

recognized directly in other comprehensive income.

The requirements of the Second Pillar of Taxation have been transposed into Bulgarian law and entered into force on

1 January 2024. During the period, the Group's management has assessed the applicable tax legislation to determine

the potential exposure for Pillar 2 tax liabilities. An additional national tax liability arises for the Group under section

260я 25 of the Corporate Income Tax Act for 2024 and the best estimate is set out in the table above.

18. Earnings per share and dividends

18.1. Earnings per share

The earning per share is calculated using as the numerator the net profit attributable to the shareholder of the parent

company. The weighted average number of shares used to calculate earnings per share, as well as the net profit to be

distributed to the parent company's shareholder, are presented as follows:

2024 2023
Profit for the Group subject to distribution (in BGN thousand) 246,177 1,110,432
Weighted average number of shares 3,463,941,774 3,463,067,771
Earnings per share (BGN per share) 0,0711 0,3206

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
64
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
18.2. Dividends

The distribution of profit is made pursuant to a decision of the sole shareholder of the capital, in compliance with the

following order:

• at least 10% of the profit is allocated to the Reserve Fund;

• a dividend determined on the basis of a decision of the Council of Ministers in compliance with the State

Budget Act;

• at the proposal of the Board of Directors it is possible to set aside a part of the profit, subject to distribution

in certain funds of the Company;

By Decision No.16 of 3 October 2024 in Constitutional Case No.14 of 2024, the Constitutional Court unanimously

declared unconstitutional the Decision of the National Assembly of 29 March 2024 assigning the Minister of Energy,

respectively Bulgarian Energy Holding EAD, to not distribute a dividend from the company's profit for the financial

year 2023. As a consequence of this act, the Council of Ministers (CoM) issued Order No.3 of 16 October 2024

amending and supplementing Order 1 of the CoM of 2024 on the establishment and payment to the State of deductions

from the profits of State-owned enterprises and commercial companies with State participation in the capital,

supplemented by Order No.2 of the CoM of 2024. Bulgarian Energy Holding EAD has an obligation to pay a dividend

for the financial year 2023 in the amount of BGN 1,080,529 thousand, from which shall be deducted the dividend paid

in 2023 pursuant to item 5b and item 6a of Order No.2 of the Council of Ministers of 2023 on the establishment and

payment to the State of deductions from the profits of State-owned enterprises and commercial companies with State

participation in the capital, as amended and supplemented by Orders No.3, 4, 5 and 7 of the Council of Ministers of

2023. The deadline for payment of the balance of the dividend is 18 October 2024. The Company has deposited the

balance dividend payable amounting to BGN 280,529 thousand on time.

In 2024, the Group paid a dividend to the Republic of Bulgaria in the amount of BGN 280,529 thousand (2023: BGN

1,439,706 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
65
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
19. Property, plant and equipment

As of 31 December 2024 Land and buildings Plant and equipment Transport vehicles Equipment and other assets Assets under construction Right of use assets Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Gross carrying amount:
Balance as of 1 January 2024 1,307,961 16,373,628 130,369 112,320 3,188,208 6,430 21,118,916
Additions 143 12,891 3,637 1,605 1,249,952 2,705 1,270,933
Disposals (2,246) (64,925) (1,242) (915) (140,550) (2,163) (212,041)
Elimination of deprecation in revaluation (90,356) (2,005,626) (13,863) (271) - - (2,110,116)
Revaluation 316,837 1,588,799 10,557 - - - 1,916,193
Impairment reversal in profit or loss 1,534 1,699 141 - - - 3,374
Impairment on account of revaluation reserve (115) (92,734) (4) - - - (92,853)
Impairment expenses in profit or loss (164) (20,191) - - - - (20,355)
Transfer to intangible assets - - - - (6,309) - (6,309)
Transfers from assets under construction 8,040 621,105 25,466 3,929 (658,540) - -
Exchange rate differences from foreign operations - (7) - - 6 - (1)
Balance as of 31 December 2024 1,541,634 16,414,639 155,061 116,668 3,632,767 6,972 21,867,741
Depreciation:
Balance as of 1 January 2024 (86,557) (1,780,138) (69,005) (95,596) - (3,186) (2,034,482)
Depreciation charge for the year (30,562) (851,303) (12,824) (4,595) - (1,188) (900,472)
Elimination of deprecation in revaluation 90,356 2,005,626 13,863 271 - - 2,110,116
Transfer from intangible assets 291 - - - - - 291
Dispolsals 332 36,097 1,108 904 - 1,904 40,345
Balance as of 31 December 2024 (26,140) (589,718) (66,858) (99,016) - (2,470) (784,202)
Carrying amount on 31 December 2024 1,515,494 15,824,921 88,203 17,652 3,632,767 4,502 21,083,539

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
66
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
As of 31 December 2023 Land and buildings Plant and equipment Transport vehicles Equipment and other assets Assets under construction Right of use assets Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Gross carrying amount:
Balance as of 1 January 2023 1,267,473 16,052,381 114,491 109,221 3,087,015 4,949 20,635,530
Additions 5,539 14,185 851 1,005 980,693 2,222 1,004,495
Disposals (2,015) (35,228) (1,501) (1,194) (70,479) (741) (111,158)
Elimination of deprecation in revaluation - (12,487) - - - - (12,487)
Impairment on account of revaluation reserve 320 (404,867) 179 - - - (404,368)
Assets acquired from business combinations 19,063 1,124 237 214 - - 20,638
Transfer to intangible assets - - - - (12,330) - (12,330)
Transfer from assets under construction 17,936 759,569 16,112 3,074 (796,691) - -
Classified in a disposal group (355) (1,049) - - - - (1,404)
Balance as of 31 December 2023 1,307,961 16,373,628 130,369 112,320 3,188,208 6,430 21,118,916
Depreciation:
Balance as of 1 January 2023 (54,293) (970,062) (59,279) (92,284) - (2,955) (1,178,873)
Depreciation charge for the year (31,452) (839,988) (10,792) (4,284) - (972) (887,488)
Disposals 662 16,802 1,257 1,168 - 741 20,630
Depreciation in business combinations (1,744) (346) (191) (196) - - (2,477)
Elimination of deprecation in revaluation - 12,487 - - - - 12,487
Classified in a disposal group 270 969 - - - - 1,239
Balance as of 31 December 2023 (86,557) (1,780,138) (69,005) (95,596) - (3,186) (2,034,482)
Carrying amount on 31 December 2023 1,221,404 14,593,490 61,364 16,724 3,188,208 3,244 19,084,434

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
67
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Right-of-use assets are included in the net carrying amount of property, plant and equipment as follows:

Optical cable lines Plant and equipment Buildings Total right-of- use assets
BGN’000 BGN’000 BGN’000 BGN’000
Gross carrying amount
Balance on 1 January 2024 1,641 2,604 2,185 6,430
Additions 955 1,736 11 2,706
Disposals (945) (765) (454) (2,164)
Balance as of 31 December 2024 1,655 3,575 1,742 6,972
Depreciation and impairment
Balance as of 1 January 2024 (1,199) (1,069) (918) (3,186)
Depreciation (146) (363) (679) (1,188)
Disposals 945 740 219 1,904
Balance as of 31 December 2024 (400) (692) (1,378) (2,470)
Carrying amount as of 31 December 2024 1,255 2,883 364 4,502

Optical cable lines Plant and equipment Buildings Total right-of- use assets
BGN’000 BGN’000 BGN’000 BGN’000
Gross carrying amount
Balance on 1 January 2023 1,866 1,251 1,832 4,949
Additions - 1,869 353 2,222
Disposals (225) (516) - (741)
Balance as of 31 December 2023 1,641 2,604 2,185 6,430
Depreciation and impairment
Balance as of 1 January 2023 (1,296) (998) (661) (2,955)
Depreciation (128) (587) (257) (972)
Disposals 225 516 - 741
Balance as of 31 December 2023 (1,199) (1,069) (918) (3,186)
Carrying amount as of 31 December 2023 442 1,535 1,267 3,244

The properties, machines and facilities include nuclear power plant NPP Kozloduy EAD, TPP Maritsa East 2 EAD,

Mini Maritsa-Iztok EAD Coal Mining Facilities, main and transit pipelines, and Chiren Underground Gas Storage, as

well as the electricity transmission network in ESO, HPP and Pumped Storage Hydro Power Plant, owned by NEK

EAD, etc.

Assets under construction

Assets under construction as of 31 December 2024 relate mainly to the following projects:

Subsidiary Project 31 December 2024 31 December 2023
BGN’000 BGN’000
TPP Maritsa East 2 EAD Replacement of rubber conveyor belt - pipe conveyor 1,pipe conveyor 2 4,923 -
TPP Maritsa East 2 EAD Full engineering of gas ignition installation of KA-1 to 10 3,780
TPP Maritsa East 2 EAD Expansion of the existing centralized monitoring system with the construction of new video surveillance systems and physical protection systems of TPP Maritsa East 2 EAD 3,563 1,798 -

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
68
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Subsidiary Project
31 December 2024 31 December 2023
BGN’000 BGN’000
Natsionalna Elektricheska Yadenitsa Project 45,203 44,952
Kompania EAD
Natsionalna Elektricheska Upper Arda Cascade 24,513 24,513
Kompania EAD
NPP Kozloduy EAD Costs for the preparation of a feasibility study for the 80,120
construction of new nuclear power capacity at the NPP Kozloduy site 17,830
NPP Kozloduy EAD System modernization measures related to extending the 66,714
operational life of Units 5 and 6 94,614
NPP Kozloduy EAD Supply of pneumocylinders and locating pneumatic fittings for units 5 and 6 50,994 -
NPP Kozloduy EAD Modernization measures for the technical means of emergency and warning protection (EWP), automatic power regulator (APR) and apparatus for discharge and 23,901 -
NPP Kozloduy EAD power limitation of Units 5 and 6 Justification of safety and changes in the SCC when switching to a new type of NG, including bringing ATOB into compliance when switching to a new type of NG 12,507 -
NPP Kozloduy EAD Supply and installation of safety and check valves in EP- 2 6,557 -
Mini Maritsa-Iztok EAD The costs of acquiring fixed assets, including advances provided, for unfinished investment projects 11,032 14,308
Bulgartransgaz EAD Construction and commissioning of Chiren UGS - above- ground part, Construction and commissioning of: "Expansion of the capacity of the Chiren UGS - drilling fund"; Expansion of the gas transmission infrastructure of Bulgartransgaz EAD in order to increase the capacities at the interconnection points; Kardam Compressor Station - reversal and expansion of the capacity of its control system"; Repair of the Du1000 Transit Gas Pipeline for the Republic of Greece and the Republic of North Macedonia in the section between the Yavorovo and 521,335 224,121
Gorno Belevo. Other projects 279,634 268,224
3,632,767 3,188,208

NPP Belene Project

The construction of NPP Belene Project was started in 1981. In 1991 the funding for the project was suspended.

In May 2004 the Government of the Republic of Bulgaria decided to continue the activities of construction of a second

nuclear power plant Belene, and on 7 April 2005, in compliance with the requirements of Article 45 of the Safe Use

of Nuclear Energy Act, a final decision to build NPP Belene was made.

On 30 October 2006 NEK EAD officially announced the contractor ZAO Atomstroyexport as the contractor with the

A92 option for the construction of two 1,000 MW units with light water reactors at the Belene site.

On 29 November 2006 in Sofia, ZAO Atomstroyexport and Natsionalna Elektricheska Kompania EAD signed an

agreement for the construction of NPP Belene.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
69
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
On 29 March 2012, the Government of the Republic of Bulgaria decided to suspend the construction of the Nuclear

Power Plant at the Belene site. By a decision dated 27 February 2013, the 41st National Assembly supported the

Government's decision to suspend the project for construction of a new nuclear power plant at the Belene site and

insisted on its final termination.

On 14 June 2016, the Arbitral Tribunal of the International Chamber of Commerce in Paris rendered a judgment

ordering NEK EAD to pay Atomstroyexport (ASE) an amount of BGN 1,176,661 thousand (EUR 601,167 thousand).

On 7 June 2018, a decision was made by the National Assembly to resume actions to look for opportunities to build

NPP Belene jointly with a strategic investor, on a market basis and without providing a state guarantee, by separating

the assets and liabilities for the project NPP Belene in a separate project company.

Pursuant to the decisions of the National Assembly of 7 June 2018 and the Council of Ministers of 29 June 29 2018,

Natsionalna Electricheska Kompania EAD has issued an invitation for the selection of a strategic investor for the

construction of NPP Belene. The invitation also provides an opportunity to express interest in acquiring a minority

stake in the future project company, as well as / or to purchase electricity from the future power plant. The purpose of

the invitation is to provide certain information to the parties wishing to apply for participation in the procedure.

Thirteen applicants submitted applications within the announced deadline.

The information memorandum for the NPP Belene project was sent to all potential candidates - China National

Nuclear Corporation (CNNC), Atomenergoprom AD - Rosatom, Korea Hydro-Nuclear Corporation, Framatom SAS

- France and General Electric, USA.

The memorandum contains basic information about the project, the legal framework in the country, as well as an

analysis of the market situation in the region. It was sent to the candidates after they signed the project confidentiality

agreement in April. It is binding on them as well as on all their consultants, bankers, agents and others.

By a decision of the National Assembly of the Republic of Bulgaria dated July 6, 2023, the Minister of Energy was

assigned to conduct negotiations with the Minister of Energy of Ukraine for the purpose of selling equipment with a

long production cycle (LPC) intended for the NPP Belene Project for price not lower than EUR 601,617 thousand (or

BGN 1,176,661 thousand). Equipment with a long production cycle is a key asset of the construction of Belene NPP

Project. The carrying amount of the rest of the assets under construction consists mainly of capitalized costs in the

amount of BGN 1,313,344 thousand, as well as other fixed assets in the amount of BGN 72,466 thousand related to

this project. Meetings of the working group were held with representatives of the Ukrainian Ministry of Energy and

the State Ukrainian Company to discuss and specify the type, kind and quantity of technical equipment with a long

production cycle intended for NPP Belene Project, which the Ukrainian side is interested in purchasing. For the

purposes of the negotiations with the Ukrainian representatives, an appraisal has been prepared by an external licensed

appraiser.

By the decision of the National Assembly was also repealed the decision of the National Assembly of the Republic of

Bulgaria as of June 7, 2018 regarding quest for the opportunities to build the NPP Belene together with a strategic

investor, by separating the assets and liabilities for the NPP Belene project into an individual project company, as well

as the subsequent decision of the National Assembly and the Council of Ministers as of June 27, 2018 to invite NEK

EAD to select a strategic investor for the construction of the project.

By decision of the National Assembly of the Republic of Bulgaria of 6 July 2023 (promulgated in the State Gazette,

issue 59 of 11 July 2023), the Minister of Energy was instructed to conduct negotiations with the Minister of Energy

of Ukraine with a view to selling long cycle equipment (LCE) intended for the NPP Belene Project for a price not

lower than EUR 601,617 thousand (or BGN 1,176,661 thousand). Equipment with a long production cycle is a key

asset of the construction of Belene NPP Project. The carrying amount of the rest of the assets under construction

consists mainly of capitalized costs in the amount of BGN 1,313,344 thousand, as well as other fixed assets in the

amount of BGN 72,466 thousand related to this project. Meetings of the working group were held with representatives

of the Ukrainian Ministry of Energy and the State Ukrainian Company to discuss and specify the type, kind and

quantity of technical equipment with a long production cycle intended for Belene NPP Project, which the Ukrainian

side is interested in purchasing. For the purposes of the negotiations with the Ukrainian representatives, an appraisal

has been prepared by an external licensed appraiser.

An on-site inspection was carried out to check the condition of the equipment, and it was confirmed that it met the

manufacturers' requirements for storage and represervation. The final scope of the potential transaction has been

clarified. A request for a commercial proposal from the National Nuclear Power Generation Company Energoatom

(ENERGOATOM) to the Group was made and commercial negotiations between the two parties commenced. White
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
70
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
and Case LLP, an international legal advisor with experience in this type of transaction, has been engaged as a

consultant in these negotiations. With its assistance, draft term sheets have been prepared representing an initial

version of the main financial and legal parameters on which the negotiations for the conclusion of the equipment

purchase agreement are based.

As of early April 2025, most of the provisions of the preliminary arrangements have been specified between the two

parties. But some of the most important ones - price, payment method, transfer of ownership - remain unclear.

The big challenge for the successful finalization of the overall negotiation process is to secure financing for the sale.

The Ukrainian side is expected to offer terms acceptable to the Bulgarian side, including a payment method that does

not expose the Bulgarian side to the significant risk of fragmentation of the sale of the equipment, which would lead

to a violation of its integrity and reduce its value, and the risk of delay of agreed payments.

As of 31 December 2024, the value of expenditures related to the NPP Belene project included in the balance of assets

under construction amounts to BGN 2,497,991 thousand (31 December 2023: BGN 2,497,848 thousand). Also related

to the NPP Belene project are property, plant and equipment with a carrying amount of BGN 71,826 thousand as of

(31 December 2023: BGN 71,572 thousand).

In 2024, the change in capitalized project costs is BGN 433 thousand representing storage costs, capitalized interest,

equipment sold, etc.

As of 31 December 2024, Gupta is unable to make a reliable estimate of the recoverable amount of project costs

included in the cost of property, plant and equipment under construction due to the specific nature and lack of clarity

regarding the future implementation of the project, which is not entirely within the control of the Group's management.

Based on the above, the Group's management believes that as of 31 December 2024 there is significant uncertainty

regarding the future realization of the project, the recoverable amount of the assets related to the NPP Belene

construction project.

Chaira PSHPP

The Group has a decisive role in guaranteeing the electricity security of the country. Large hydropower plants play an

essential role in managing and balancing the electricity system. They are the main regulating capacities in Bulgaria

and are used to balance the operation of baseload capacities such as nuclear and thermal power plants, as well as

variable generations from solar and wind power plants. In this capacity, the Group owns Chaira pumped -storage

hydropower plant (PSHPP), with 4 pump-generator hydro units. The carrying value of Chaira pumped storage

hydropower plant, as of 31 December 2024 amounted to BGN 554,525 thousand.

After an accident during a load test following the rehabilitation of one of the turbines in March 2022, the plant ceased

operation. Analysis and verification of the activities during the operation and rehabilitation of the facilities of one of

the four hydro units and examination of metal samples to determine the causes of the accident were carried out with

the involvement of an external consultant. A root cause was made in the prepared report and it was established that

high stress loads are created in the metal, which lead to the appearance of cracks that grow during the operation

process. The damaged hydro unit cannot be rebuilt and the turbine part needs to be replaced, which will take an

extended period of time. On 23 December 2024, pre-launch testing of the XA2 was successfully completed, and the

XA2 was put back into operation for 72 hour samples from the same date and was deployed to the EEC. Full

replacement of the units is planned for XA1 and XA4 as a long term sustainable solution for their operati on. A short

term solution is also being worked on to date for the complete replacement of XA1, coupled with a temporary repair

by the original manufacturer, enabling XA1 to operate until the time for the complete replacement.

As of 31 December 2024, the Group has performed an impairment review of the Chaira PSHPP using a discounted

cash flow method financial model to determine its value in use. The financial model is prepared using multiple inputs

and parameters that involve significant judgements, assumptions and uncertain future events. No indications of a need

for impairment have been identified.

As at the reporting date, the Group is in a PPA procedure for the replacement of the entire equipment of the existing

hydro unit (XA4) and (XA1) of the Chaira PSHPP, as well as a partial repair procedure of XA1 with the original

manufacturer Toshiba. The financing of the repair works will be provided by own and borrowed funds.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
71
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Revaluation of property, plant and equipment

According to the accounting policy property, plant and equipment are revalued in a 3-year period or in shorter periods.

As of 31 December 2024, a fair value measurement has been performed in accordance with the requirements of IAS

16 and IFRS 13. The revaluation was made on the basis of an assessment of their fair values by an independent

licensed appraiser.

In accordance with IFRS 13 Fair Value Measurement, the measurement of the fair value of non-financial assets takes

into account the ability of a market participant to generate economic benefits by using the asset to maximize its value

or by selling it to another market participant who will use it in such a way. The assets of the Group included in the

revaluation review are specific, strictly related to the activities of the Group and the alternative use of most of them is

impossible or difficult, i.e. other use by market participants is unlikely to maximize the value of the assets, therefore

it is accepted that their current use in the activities maximizes value.

As of 31 December 2024, the Group's management has reviewed the carrying amounts, recoverable amounts and

useful lives of non-current assets. The management estimations are based on the review of an independent appraiser

at the date of the financial statements.

The review applied the approach and valuation methods for measuring the fair value of individual categories of

property, plant and equipment, using a combination of the three basic approaches based on economic principles of

equilibrium prices, expected benefits or substitutions:

• Market approach - derives an indicative value by comparing valuation assets with identical or similar assets

for which price information is available.

• Income approach - derives an indicative value by bringing future cash flows to a single current equity value,

that is, it looks at the revenue that an asset will generate over its useful life and derives an indicative value

through a capitalization process.

• Cost approach - derives an indicative value using the economic principle that a buyer would not pay for an

asset more than the cost of acquiring an asset of equivalent value through purchase or construction.

Within each approach, as well as in the possible combinations between them, one or more assessment techniques

(methods) are used:

• A market comparisons method is an analysis of the value of rights to an asset based on a comparison of prices

in an active market for actual transactions in identical rights to assets having similar characteristics.

• Discounted cash flow method, derives a value based on a series of cash flows for future periods that are

converted to present value by applying an appropriate discount rate.

• Depreciated replacement cost method, an analysis of the value of the rights to an asset based on the cost of

creating or replacing it with a similar asset at the time of valuation, less the cost of physical, moral and

economic depreciation.

The valuation at fair value as of 31 December 2024 is based on observable and unobservable inputs adjusted for

specific factors such as area, location and current use. Directly or indirectly observable inputs used in the valuation

are subject to adjustments. For this reason, the hypotheses used are categorized from level 3.

Yadenitsa Project

Yadenitsa Project has secured funding for the preparatory works (procedures until a Construction Permit is obtained)

from the Connecting Europe Facility fund of the European Commission.

On 24 April 2015, a Grant Agreement was signed between the Group through its subsidiary NEK EAD and the

European Commission's Innovation and Networks Executive Agency. According to this agreement, the funds granted

to the Group amount to EUR 3,213 thousand. They covered 50% of the costs of the EIA and project update and the

preparation of a Detailed Development Plan (DDP), as well as the costs of obtaining a construction permit for the

Yadenitsa dam. The remaining 50% is the Group's own funds.

All necessary preliminary activities required to obtain a construction permit are assigned with the agreement. The

Group has an EIA decision in force, a detailed development plan in force, approved investment projects and a building

permit No.PC-3 of 20.01.2023 in force. Issued by the Minister of Regional Development and Public Works for

“Increasing the volume of the lower equalizer of the Chaira PSHPP with the construction of the Yadenitsa Dam and
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
72
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
a reverse pressure tunnel for connection with the Chaira Dam”, which was published in the State Gazette on 27 January

2023 and entered into force on 11 February 2023.

The main activities concerning the implementation of the project are related to ensuring its compliance with the

requirements of the Directorate General of Environment of the European Commission and overcoming the series of

negative opinions due to which the project was not included in the current list of projects of common interest of the

Union and was refused financing by the European Investment Bank and the European Bank for Reconstruction and

Development. In this context, significant progress has been made in the last three years. Specific and detailed

conservation objectives have been established for three of the four protected areas in the vicinity of the project: SCI

BG0001386 Yadenitsa (Order No.RD-85/31.01.2025 for protected area BG0001386 Yadenitsa for the conservation

of natural habitats and wild flora and fauna), SCI BG0000495 Rila (Order No.RD-86/31.01.2025 for protected area

BG0000495 Rila the conservation of natural habitats and wild flora and fauna, and for the conservation of wild birds)

and SPA BG0002129 Rila Buffer (Order No.RD-87/31.01.2025 for protected area BG0002129 Rila Buffer for the

conservation of wild birds). The process for protected area BG0000636 Low Rila is in its final stage and is expected

to be completed in the coming weeks.

A team of external experts is working on the preparation of a specific analysis - ecological expertise on the compliance

with the identified specific and detailed conservation objectives for the four protected areas of the NATURA 2000

ecological network in Bulgaria and with the requirements of Article 4(7) of Directive 2000/60/EC of the European

Parliament and of the Council of 23 October 2000 establishing a framework for Community action in the field of

water policy. A preliminary analysis is being prepared to be submitted to the MoEW for submission to the European

Commission in due course.

The Yadenitsa project duly applied for PCI status on 15 November 2024 and the assessment process is currently

underway for inclusion in the EU Second PCI List in November 2025.

I mpairment review

As of 31 December 2024, the Group has reviewed for any indication of impairment.

The following sequence has been followed in preparing the impairment test:

- Identification of Cash Generating Units (CGUs);

- Calculation of the recoverable amount of CGUs;

- Reconciliation of the carrying amount of CGUs to the recoverable amount of CGUs;

- Allocation of impairment (if any).

No indicators have been identified that the carrying amount of the assets exceeds their recoverable amount.

As of 31 December 2024, a revaluation of the buffer gas at the Chiren UGS was performed by the Group through its

subsidiary Bulgartransgaz EAD. An impairment review was performed where it was determined that as at the

valuation date, there was a material departure and an impairment loss was recognized for 2024 on buffer gas in the

amount of BGN 79,765 thousand on account of revaluation reserve (2023: BGN 407.451 thousand) .

Public state property assets

As of 31 December 2024, property, plant and equipment included assets with a carrying amount of BGN 850,703

thousand (31 December 2023: BGN 852,865 thousand), which have been declared public state property under the

Water Act. The Group, through the usubsidiary NEK EAD, performs all activities for the maintenance and

management of the dam walls, their adjacent facilities and the collection derivations of some of the complex and

significant dams - public state property according to Art. 13, para. 1, item 1 of the Water Act. According to the

requirements of the same law, the operation and maintenance of dams and their facilities should be performed by a

“dam operator”, which function has not yet been assigned to the Group by the competent authorities at the da te of

these consolidated financial statements. Until now, there is no change in the regulations regarding the ownership and

operation of the specified assets.

Pending clarification of future changes regarding the above-mentioned water management facilities, they are managed

by the Group via the subsidiary NEK EAD, against which the company generates revenues.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
73
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Assets with unidentified property

NEK EAD

As of 31 December 2024 for land and buildings with a carrying value of BGN 18,360 thousand. (31 December 2023:

BGN 16,522 thousand), a procedure for issuing title deeds for state properties is underway.

ESO EAD

As of 31 December 2024, real estate without title deeds has a carrying value of BGN 3,550 thousand (31 December

2023: BGN 3,574 thousand).

Loans security

As of 31 December 2024, property, plant and equipment with a carrying value of BGN 20,410 thousand were pledged

as collateral to secure the Group's loan liabilities to banks. (31 December 2023: BGN 13,662 thousand).

Other disclosures

Due to the specifics of the accounting records of property, plant and equipment and changes in them in previous

periods, disclosure of the carrying amount of assets, if they would be measured after recognition at cost, requires

significant resources and time that outweigh the benefits to consumers of the consolidated financial statements.

Therefore, the Group’s management has decided not to make these announcements.

The specifics of Group's assets and the dynamic economic environment in the energy sector in which it operates could

lead to variations in the assumptions and judgments used in determining the fair values of these properties, plants and

equipment.

All depreciation and impairment expenses are included in the consolidated statement of profit or loss in the line

“Depreciation, amortisation and impairment expenses”.

20. Intangible assets

The carrying amounts of intangible assets for the reported periods may be analyzed as follows:

As of 31 December 2024 Software products Patents and licenses Other intangib le assets Develop ment costs Rights of use Acquisit ion expense s Total
BGN’000 BGN’000 BGN’00 0 BGN’000 BGN’00 0 BGN’00 0 BGN’000
Gross carrying amount
Balance as of 1 January 2024 81,954 30,809 85,790 77,576 3,039 - 279,168
Additions 1,077 32 1 - 10,503 11,612
Disposals (1,657) (648) (53) - (4) - (2,362)
Reclassifications from property, plant and equipment 791 2,319 1 63 3,135 - 6,309
Transfers 2,173 8,200 36 - - (10,409) -
Balance as of 31 December 2024 84,338 40,712 85,774 77,639 6,170 94 294,727
Amortisation
Balance as of 1 January 2024 (66,917) (24,084) (83,585) (57,180) (2,574) - (234,340 )
Amortisation for the year (6,131) (4,425) (388) (3,834) (274) - (15,052)
Disposals 1,654 648 53 - 4 - 2,359
Transfers and reclassifications - - - - (291) - (291)
Balance as of 31 December 2024 (71,394) (27,861) (83,920) (61,014) (3,135) - (247,324 )
Carrying amount on 31 December 2024 12,944 12,851 1,854 16,625 3,035 94 47,403

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
74
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
As of 31 December 2023 Software products Patents and licenses Other intangib le assets Develop ment costs Rights of use Acquisi tion expense s Total
Gross carrying amount BGN’000 BGN’000 BGN’00 0 BGN’000 BGN’00 0 BGN’00 0 BGN’000
Balance as of 1 January 2023 75,492 29,507 86,537 71,987 2,996 - 266,519
Additions 3,086 348 34 - - 1,257 4,725
Disposals (3,358) (198) (785) - - - (4,341)
Transfer from property, plant and equipment 6,734 1,217 4 5,589 43 (1,257) 12,330
Classified in a disposal group - (65) - - - - (65)
Balance as of 31 December 2023 81,954 30,809 85,790 77,576 3,039 - 279,168
Amortisation Balance as of 1 January 2023 (65,374) (20,591) (83,989) (53,846) (2,500) - (226,300)
Amortisation for the year (4,872) (3,754) (381) (3,334) (74) - (12,415)
Disposals 3,329 196 785 - - - 4,310
Classified in a disposal group - 65 - - - - 65
Balance as of 31 December 2023 (66,917) (24,084) (83,585) (57,180) (2,574) - (234,340)
Carrying amount on 31 December 2023 15,037 6,725 2,205 20,396 465 - 44,828

Impairment of intangible assets

The Group has performed an impairment review of intangible assets as of 31 December 2024. There are no indications

that the carrying amount of the assets exceeds their recoverable amount and as a result no impairment loss has been

recognized in the consolidated financial statements.

The Group has not pledged intangible assets as collateral for its liabilities.

All depreciation and impairment expenses are included in the consolidated statement of profit or loss in the line

“Depreciation, amortization and impairment expenses”.

21. Investments accounted for using the equity method

31 December 2024 31 December 2023
BGN’000 BGN’000
Country of incorporation Share Amount of investments Amount of investments
Joint ventures
ICGB AD Bulgaria 50.00% 76,392 70,125
South Stream Bulgaria AD Bulgaria 50.00% 10,134 10,265
Impairment (3) (3)
South Stream Bulgaria AD, net 10,131 10,262
SEleNe CC Greece 33.33% 4,571 4,268
Gastrade S.A. Greece 20.00% 33,503 36,753
124,597 121,408
Associated companies
ContourGlobal Maritsa Iztok 3 AD Bulgaria 27.00% 52,490 75,116
Contour Global Operations Bulgaria AD Bulgaria 27.00% 2,756 2,242
ZAD Energy Bulgaria 48.08% 13,185 13,481
Allianz Bulgaria Pension Company AD Bulgaria 34.00% 32,873 29,245
Hydro Power Company Gorna Arda AD Bulgaria 24.00% - -
101,304 120,084
Total investments accounted for using the equity method 225,901 241,492

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
75
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The change in the carrying amount of the investments for the presented reporting periods can be analyzed as follows:

2024 2023
BGN’000 BGN’000
Carrying amount of investment on 1 January 241,492 235,344
Share from profits/losses 3,716 44,519
Share from other comprehensive income 280 524
Dividends received (22,063) (49,788)
Other changes (458) (23)
Impairment - 316
Release of investment by sale - (316)
Acquisitions 2,934 10,916
Disposals
Carrying amount of investment on 31 December 225,901 241,492

ICGB AD Joint Venture

BEH EAD is a shareholder in ICGB AD – a company with an equal interest of BEH EAD and IGI Poseidon (a

company with an equal interest of DEPA S.A. and Edison SpA), registered in 2011 in the Republic of Bulgaria,

intended to build and become an owner and operator of a gas interconnection network IGB.

In 2022, ICGB AD built the gas interconnector Greece-Bulgaria with a technical capacity of up to 3 billion m 3 /year

from Komotini to Stara Zagora town with a length of 182 km.

ICGB AD is licensed and certified as a transmission network operator under the Independent Transmission Operator

model, with a two-tier management system – with a Management and Supervisory Board, and since 1 October 2022,

it carries out natural gas transmission operations through the gas interconnector, through which all volumes of the

contractual Azeri gas for Bulgaria are transferred, and it receives the revenues from the provision of transmission

services from transmission, which at the moment, based on concluded long-term transmission contracts, is approx.

1.5 billion m 3 /year.

A dividend of BGN 9,829 thousand was received in 2024 (2023: zero BGN) .

South Stream Bulgaria Joint Venture AD

The South Stream project, the implementation of which was terminated, provided for the construction of a new gas

pipeline system for transporting natural gas from Russia to the European market, through Bulgaria, with a technical

capacity of 63 billion m3/year on the 900-kilometer Black Sea section. Shareholders with equal interest in the joint

venture on the Bulgarian territory (which is no longer operating) are Bulgarian Energy Holding EAD and Gazprom

Krasnodar.

A decision on the liquidation of the project company is yet to be assessed, and in the liquidation process, if such a

decision is made, the remaining assets – land properties – should be liquidated.

As of 31 December 2024, the impairment of the investment amounts to BGN 3 thousand (31 December 2023: BGN

3 thousand).

Joint company SEleNe CC, Greece

In May 2020, through the subsidiary Electricity System Operator EAD, the Group, together with the transmission

operators of Greece, Romania and Italy established the Southeast Electricity Network Coordination Center SEleNe

CC (Southeast Electricity Network Coordination Center) based in Thessaloniki, Greece, which will facilitate the

efficient management of regional energy systems and ensure security of electricity supply in the context of market

mergers and the integration of the Western Balkans The cost of acquisition of the investment in the capital of SeleNe

CC is BGN 98 thousand, which represents 25% of the total capital of the company.

The Group did not receive any dividends during the reporting period and has no contingent liabilities or other

commitments related to the investment in the joint venture.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
76
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Associated company Gastrade SA, Greece

Pursuant to a decision of the Council of Ministers from 8 January 2020, the Group through the subsidiary company

Bulgartransgaz EAD acquired a shareholding in Gastrade S.A. amounting to 20% of its capital.

On 27 January 2022 the General Shareholders' Meeting of Gastrade S.A. in Athens unanimously approved the final

investment decision for the construction of the LNG terminal in Alexandroupolis, Greece, thus marking the start of

the project's implementation.

According to the Shareholder Commitment Agreement signed between Gastrade S.A., the National Bank of Greece

and the shareholders, the latter committed to additional financing in the form of a capital increase of Gastrade S.A. or

borrowed funds during the construction phase and until completion of the project, which qualify as standard project

financing with limited shareholder participation. The shareholding is provided in the form of "initial" and "additional".

In order to finalize the negotiations for the financing of a part of the project, each shareholder has submitted as proof

of the availability of its “initial” shareholding a security of EUR 15,400 thousand as required by the National Bank of

Greece (bank guarantee or deposit) immediately after the vote on the final investment decision.

In 2023, each shareholder has transferred to the collateral account at the National Bank of Greece an amount of EUR

410 thousand to cover the shortfall of funds, and amounts of EUR 3,560 thousand have been transferred from the

account to increase the share capital of Gastrade S.A. and amounts of EUR 8,320 thousand for the subordinated bond

loan in accordance with a clause of the Subordinated Bond Loan Agreement.

The LNG terminal was put into commercial operation on 1 October 2024.

As of 31 December 2024, the Group held 1,262,200 registered shares with a nominal value of EUR 5 each and had

provided a subordinated bond loan of EUR 11,320 thousand. As of 31 December 2023, the Group owns 962,200

registered shares with a nominal value of EUR 5 each and has granted a subordinated bond loan of EUR 8,320

thousand.

After transferring the amounts for the capital increase and the subscription of bonds, the balance of the Group's account

with the National Bank of Greece, on which a pledge has been established, amounts to EUR 2,910 as of 31 December

2024 (31 December 2023: (EUR 7,410 thousand).

The Group did not receive any dividends during the reporting period and has no contingent liabilities or other

commitments related to the investment in the joint venture.

ContourGlobal Maritsa Iztok 3 AD

The Group, through its subsidiary NEK EAD, owns 27% of the capital of the thermal power plant ContourGlobal

Maritsa Iztok 3 AD, whose main activity includes production, distribution and sale of electricity and heat.

No dividend was received in 2024 (for 2023: BGN 37,800 thousand).

ContourGlobal Operations Bulgaria AD

The Group through the subsidiary NEK EAD owns 27% of the capital of ContourGlobal Operations Bulgaria AD,

whose main activity includes operation and maintenance of TPP ContourGlobal Maritsa Iztok 3 AD.

No dividend was received in 2024 (for 2023: BGN 1,539 thousand).

ZAD Energy

The Group owns 48.08% of the capital of ZAD Energy, which carries out insurance activities.

In 2023, a dividend of BGN 4,176 thousand was received (for 2023: BGN 4,521 thousand).

Allianz Bulgaria Pension Company AD

The Group, through its subsidiary NEK EAD, owns 34% of the capital of Allianz Bulgaria Pension Company AD,

which carries out pension insurance activities.

In 2024, a dividend of BGN 8,058 thousand was received (for 2023: BGN 5,928 thousand).

Hydro Power Company Gorna Arda AD

The Group, through its subsidiary NEK EAD, owns 24% (31 December 2022: 24%) of the capital of Hydro Power

Company Gorna Arda AD, which is registered to evaluate, structure and plan the construction of the Gorna Arda

cascade, including construction of hydropower plants with a total capacity of approximately 160 megawatts, providing

financing and construction of the Gorna Arda cascade and exercising the rights to operate the facility (after obtaining

the relevant licenses and permits). Hydro Power Company Gorna Arda does not operate, does not generate revenue,

has no budgets and forecasts for future development, the investment in these consolidated financial statements has

zero carrying amoun t.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
77
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Summary financial information for joint ventures and associates

The table presents summarized financial information based on the financial statements of the joint ventures and associates of the Group as of 31 December of the respective year:

Joint ventures and associates ICGB AD South Stream Bulgaria AD (unaudited data) Contour Global Maritsa East 3 AD Contour Global Operations Bulgaria AD ZAD Energy Allianz Bulgaria Pension Company AD Hydro Power Company Gorna Arda AD SEleNe CC(unaudit ed data) Gastrade S.A. (unaudited data) Total
31 December 2024
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Non-current assets 450,590 18,371 59,937 593 31,302 94,468 2,717 981,000 1,638,978
Current assets (a) 150,583 1,935 270,224 12,438 2,638 14,145 - 16,723 110,648 579,334
Total assets 601,173 20,306 330,161 13,031 33,940 108,613 - 19,440 1,091,648 2,218,312
Non-current liabilities (b) 365,122 - 21,198 574 4,955 687 24 862,975 1,255,535
Current liabilities (c) 83,267 38 114,557 2,251 1,562 11,240 - 5,685 186,101 404,701
Total liabilities 448,389 38 135,755 2,825 6,517 11,927 - 5,709 1,049,076 1,660,236
Non-controlling interest 16 16
(a) including cash and cash equivalents 135,336 1,791 17,333 151 2,515 4,804 - 13,467 68,562 243,959
(b) including non-current loans 212,274 - 0 429,420 641,694
(c) including current loans 360 - 0 60,797 61,157
Revenues 68,954 6 191,553 27,787 9,824 57,908 12,076 - 368,108
Depreciation and amortization costs (9,580) - (94,268) - (1,345) - (713) - (105,906)
Income tax expense (3,772) - 18,189 (212) (1,267) (3,101) - (5,774) 4,063
Profit/(loss) for the year 32,393 (261) (83,812) 1,902 7,469 34,105 - 910 (28,565) (35,859)
Other comprehensive income for the year 9 433 217 - - (17) 642
Total comprehensive income/(loss) for the year 32,393 (261) (83,803) 1,902 7,902 34,322 - 910 (28,582) (35,217)
Share of the profit/(loss) for the year due to the Group 16,096 (131) (22,628) 514 3,672 11,612 303 (5,722) 3,716
Share of other comprehensive income of associates - - 2 - 208 74 - - (4) 280
Total net assets 152,784 20,268 194,406 10,206 27,423 96,686 - 13,715 42,572 558,060
Share participation of the Group 50% 50% 27% 27% 48.08% 34% 24% 33% 20%
Impairment (3) - (3)
Carrying amount of the investment 76,392 10,131 52,490 2,756 13,185 32,873 - 4,571 33,503 225,901

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
78
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Joint ventures and associates ICGB AD South Contour Contour ZAD Allianz Hydro Power SeleNe Gastrade Total
Stream Global Global Energy Bulgaria Company CC S.A.
Bulgaria Maritsa Operations Pension Gorna Arda
31 December 2023 AD East 3 AD Bulgaria AD Company AD AD (unaudited data)
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Non-current assets 453,951 18,371 145,869 5,080 24,125 82,140 - 1,734 723,711 1,454,981
Current assets (a) 165,422 2,198 1,059,200 14,589 9,304 13,672 140 13,564 125,800 1,403,889
Total assets 619,373 20,569 1,205,069 19,669 33,429 95,812 140 15,298 849,511 2,858,870
Non-current liabilities (b) 373,008 - 27,465 5,001 4,225 1,626 - 13 671,385 1,082,723
Current liabilities (c) 106,114 40 899,395 6,364 1,166 8,172 - 2,472 121,596 1,145,319
Total liabilities 479,122 40 926,860 11,365 5,391 9,798 - 2,485 792,981 2,228,042
(a) including cash and cash equivalents 146,574 2,082 34,957 481 9,279 5,046 140 648 62,081 261,288
(b) including non-current loans 213,602 - - - - - - - 273,818 487,420
(c) including current loans 434 - - - - - - - 109,960 110,394
Revenues 63,219 169 1,200,060 40,237 15,710 51,834 - 7,530 - 1,378,759
Depreciation expenses (13,645) - (151,564) (66) (535) - (421) (312) (166,543)
Income tax expense (4,670) - (10,409) (926) (942) (2,775) - (146) 3,961 (15,907)
Profit/(loss) for the year 32.704 (100) 50,282 8,207 8,468 30,783 - 418 (11,688) 119,074
Other comprehensive income for the year - - (265) - 767 674 - - (10) 1,166
Total comprehensive income/(loss) for the year 32,704 (100) 50,017 8,207 9,235 31,457 - 418 (11,698) 120,240
Share of the profit/(loss) for the year due to the Group 16,352 (48) 13,576 2,216 4,157 10,467 - 156 (2,380) 44,496
Share of other comprehensive income of associates - - (72) - 369 229 - - (2) 524
Total net assets 140,251 20,529 278,209 8,304 28,038 86,014 140 12,806 56,530 630,821
Share participation of the Group 50% 50% 27% 27% 48.08% 34% 24% 25% 20% -
Impairment - (3) - - - - - - - (3)
Carrying amount of the investments 70,125 10,262 75,116 2,242 13,481 29,245 - 4,268 36,753 241,492

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
79
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The investments in associates and joint ventures are accounted for using the equity method. The date of the financial

statements of the associates and joint ventures is 31 December. All cash transfers to the Group, such as dividend

payments, are made after the approval of at least 51% of all shareholders in the associates.

22. Business combinations

22.1 Acquisition of subsidiary Minproekt EAD in 2023

By decision of the Minister of Energy dated 30 October 2023, a non- monetary contribution of BGN 1,000 thousand

was made to the capital of Bulgarian Energy Holding EAD, subject to the state's ownership right over 100% of the

shares of Minproekt EAD. The increase was entered in the Commercial Register and the Register of Non-Profit Legal

Entities on 16 November 2023. The change of ownership was entered in the lot of Minproekt EAD in the Commercial

Register and the Register of Non-Profit Legal Entities on 7 December 2023. The ctivity of the company is exploration,

design and construction, scientific research, development and implementation, engineering, consulting and control

and measurement activities in the field of open and underground mining of coal, inert materials and other minerals,

enrichment, briquetting, mechanical and thermochemical processing of coal, determination and control of the quality

characteristics of coal, etc.

2023
BGN’000
Contribution of shares in the capital of BEH EAD 1,000
Property, plant and equipment 18,161
Deferred tax assets 22
Other receivables and advances granted 119
Trade receivables 180
Cash and cash equivalents 41
Deferred expenses 19
Deferred tax liabilities (1,724)
Trade payables (236)
Payables to financial institutions (40)
Payables to personnel (630)
Social security payables (70)
Current tax liabilities (334)
Other current liabilities (62)
Fair value of identifiable net assets of the subsidiary 15,446
Gain on acquisition (14,446)

22.2 Establishment of Subsidiaries in 2024

In 2024, the company ESO Charge EAD was established with share capital of BGN 1,000 thousand and main activity:

Construction, commissioning, operation and maintenance of electricity and hydrogen charging systems, hydrogen

production systems, development of software products, design and consulting activities, as well as any other activity

not prohibited by the laws of the Republic of Bulgaria.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
80
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
23. Trade and other receivables

31 December 2024 31 December 2023
BGN’000 BGN’000
Trade receivables, gross 719,752 818,169
Accumulated impairment of trade receivables (719,554) (817,993)
Trade receivables, net amount 198 176
Financial assets 198 176
Advanced paid to suppliers 40,938 40,932
Prepayment 285 323
Non-financial assets 41,223 41,255
Non-current trade and other receivables 41,421 41,431

Trade receivables, gross amount 1,769,908 1,489,133
Expected credit losses of trade receivables (357,202) (209,623)
Trade receivables, net amount 1,412,706 1,279,510
Court and adjudicated receivables, gross amount 319,755 325,067
Expected credit lossesof court and adjudicated receivables (279,049) (280,364)
Court and adjudicated receivables, net amount 40,706 44,703
Receivables from the Security of the Electricity System Fund 83,669 130,544
Bank deposits with maturity over three months, gross amount 375,000 -
Expected credit losses of bank deposits (140) -
Bank deposits with maturity over three months, net amount 374,860 -
Interest receivables on bank deposits 7,202 -
Other receivables, gross amount 128,816 124,922
Expected credit losses of other receivables (87,609) (87,686)
Other receivables, net amount 41,207 37,236
Financial assets 1,960,350 1,491,993
Advanced payments made to suppliers 637,616 540,040
Expected credit losses of advances granted to suppliers (14,442) (13,721)
Advance payment made to suppliers, net amount 623,174 526,319
Prepayments 20,162 18,507
Recoverable taxes 48,849 89,064
Non-financial assets 692,185 633,890
Current trade and other receivables 2,652,535 2,125,883
Trade and other receivables 2,693,956 2,167,314

Trade receivables are not interest-bearing and usually have a payment period of 1 to 30 days.

The net book value of trade and other receivables is assumed to be a reasonable approximation of their fair value.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
81
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Bank deposits with maturity over three months of the subsidiary NPP Kozloduy-New Builds EAD

The Group has provided cash for bank deposits for a period longer than 3 months, detailed in the following table:

Banks Date of conclusion Maturity Deposit term Currency Exchange rate Principal in original currency Principal
Currency unit’000 BGN’000
Bank 1 19.07.2024 02.03.2025 6 months EUR 1.95583 153,388 300,000
Bank 2 13.08.2024 13.02.2025 6 months BGN 1 20,000 20,000
Bank 3 30.12.2024 30.06.2025 6 months BGN 1 25,000 25,000
Bank 4 17.09.2024 17.03.2025 6 months BGN 1 30,000 30,000
228,388 375,000

Advances provided for the supply of natural gas by the subsidiary Bulgargaz EAD

The advances provided for the supply of natural gas in the amount of BGN 456,017 thousand (31 December 2023:

BGN 461,453 thousand) represent prepaid amounts for natural gas supplies under valid, effective agreements under

which the subsidiary Bulgargaz EAD is the buyer. The significant part of them relates to supplies that were planned

for the first half of 2024. Due to the market dynamics, the management's assessment is that there was no need to make

these supplies in this period and they were renegotiated with a schedule for subsequent months of the year.

The unpredictability of market conditions is due to the decline in sales as a result of the warm winter, reduced

consumption by customers, including the deteriorating macroeconomic situation in the country and Europe, and high

levels of quantities in the Chiren UGS. The subsidiary Bulgargaz EAD has also taken actions to renegotiate the

delivery programs under the concluded contracts, in order to reduce the total delivery quantities. Since July 2023,

terms have been agreed with customers that allow flexibility in the management of deliveries and the implementation

of the annual program and the transfer of quantities from summer to winter months. Therefore, a significant part of

the prepaid advances at the end of the reporting period are unutilized.

As of 31 December 2024 the subsidiary Bulgargaz has receivables for advances for natural gas from BOTAŞ BORU

HATLARI İLE PETROL TAŞIMA A.Ş, for the quantities delivered by Cheniere Marketing International LLP in

April 2023, as a result of the publicly announced tender procedure in October 2022. In addi tion, there are available

quantities delivered in 2023 and 2024, which are also available from BOTAŞ at the end of the year, at prices below

market levels. Management has taken into account the possibility of joint realization of the quantities.

The impairment assessment takes into account the forecasts of the subsidiary Bulgargaz EAD for the period of

realization and the inclusion of these quantities in the price mix, as well as other relevant information that is expected

to be relevant to the realization of the stored natural gas.

31 December 2024 31 December 2023
BGN’000 BGN’000
Prepaid advances for natural gas from Bulgargaz EAD 470,459 475,174
Accumulated impairment loss (14,442) (13,721)
Prepaid advances for natural gas, net 456,017 461,453

Trade receivables of the subsidiary Bulgargaz EAD

Part of the receivables in the gross amount of BGN 55,244 thousand represents a receivable from a natural gas supplier,

which arose in connection with the unrecognized amount invoiced by the subsidiary Bulgargaz EAD from OOO

Gazprom Export for natural gas supplies for the first quarter of 2022. The amount relates to a trade dispute for

undelivered but invoiced quantities of natural gas for that period. In 2023, the Group recorded an impairment charge

of BGN 31,386 thousand and in 2024 a foreign currency revaluation of receivables and payables was performed and

a credit loss of BGN 1,997 thousand was recognized, thus the net exposure to the counterparty is considered to be

zero.

In May 2024, the subsidiary Bulgargaz EAD sent an invitation to OOO Gazprom Export for voluntary settlement of

the Bulgarian company's claim in accordance with the contract between the two companies.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
82
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
I n July 2024, after the Russian side failed to take action to resolve the matter out of court, the subsidiary Bulgargaz

EAD initiated arbitration proceedings against OOO Gazprom Export by filing a request for arbitration with the Court

of Arbitration of the International Chamber of Commerce in Paris, one of the world's most prestigious institutions

administering international commercial dispute resolution.

The subject matter of the dispute is the damages suffered by the subsidiary Bulgargaz EAD as a result of the unilateral

suspension of all natural gas supplies by Gazprom as of 27 April 2022, constituting a breach of the long-term Natural

Gas Supply Contract of 2012. The claims of the subsidiary Bulgargaz EAD amount to approximately EUR 400

million.

The arbitration panel was constituted at the end of 2024. The case is expected to be developed in 2025 and 2026. In

this period, the parties will present their claims and objections in detail, respectively, will present evidence and may

engage witnesses and experts. To refine the company's claim, an analysis of the damages suffered is currently being

carried out by international experts. Once the written exchange of documents is completed, a hearing will be

scheduled.

Legal claims of the subsidiary Bulgargaz EAD

As of 31 December 2024, the legal claims mainly consist of the Group's receivable from TPP Varna with a carrying

amount of BGN 35,541 thousand, together with the statutory interest from the date of filing the claim - 28 April 2022

and the amount of BGN 1,502 thousand representing the costs incurred in the case (31 December 2023: BGN 32,437

thousand). Following procedural actions undertaken by the Group, an agreement for repayment of the claims was

concluded and a mortgage on real estate was established in favor of the Group. The fair value of the property exceeded

the carrying amount of the receivables. By a supplemental agreement dated March 2024, it was agreed that TPP Varna

would establish a special pledge in favor of the Group under the Special Pledges Act in lieu of a mortgage to secure

the obligations under the final judgment. For the remaining receivables of the Group from TP P Varna for secured

annual capacity product and expenses in the total amount of BGN 3,746 thousand, a court settlement was entered into

on 10 May 2024 and the receivables were rescheduled with a repayment plan.

As of 31 December 2024, the Group has reviewed and charged an impairment for expected credit losses in accordance

with the accounting policies adopted and the requirements of IFRS 9 Financial Instruments.

For all short-term trade receivables, a simplified approach has been applied to determine the expected credit losses at

the end of the period. Long-term receivables are impaired on an individual basis.

The movement of the impairment for expected credit losses on trade and other receivables is as follows:

Expected credit losses of trade and other receivables 31 December 2024 31 December 2023
BGN’000 BGN’000
On 1 January 1,409,387 1,490,419
Accrued during the year 46,123 67,629
Recovered (22,385) (145,148)
Corrective 24,871 (3,341)
Derecognized - (172)
Total expected credit losses of trade and other receivables 1,457,996 1,409,387

23.1. Receivables from Toplofikatsia Sofia EAD

Trade and other receivables include the following natural gas supply receivables and loan agreements from one

customer, Toplofikatsia Sofia EAD:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
83
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current receivables from Toplofikatsia Sofia EAD, gross amount 523,053 621,492
Impairment (523,053) (621,492)
Non-current receivables from Toplofikatsia Sofia EAD, net amount - -
Current receivables from Toplofikatsia Sofia EAD, gross amount 1,281,366 960,194
Expected credit losses (346,974) (152,216)
Current receivables from Toplofikatsia Sofia EAD, net amount 934,392 807,978
934,392 807,978

By Decision №594 of the Council of Ministers of 11.08.2022 is approved the granting of a loan from the Ministry of

Energy to Bulgargaz EAD, secured via current and future receivables of Toplofikatsiya Sofia EAD. The pledge has

been entered in the Central Register of Pledges in due order.

The companies in the Group that have receivables from Toplofikatsia Sofia EAD are Bulgarian Energy Holding EAD

and the subsidiary Bulgargaz EAD.

Bulgargaz EAD

As of 31 December 2024, the current trade receivables from Toplofikatsiya Sofia EAD for delivered natural gas

amount to BGN 924,398 thousand (as of 31 December 2023: BGN 784,047 thousand). The receivables are fully

overdue. The impairment charge for them amounts to BGN 61,127 thousand (as of 31 December 2023: BGN 37,343

thousand).

Bulgarian Energy Holding EAD

The company has receivables from Toplofikatsiya Sofia EAD under contracts as follows:

Agreement as of 11 December 2015

On 11 December 2015 an agreement was concluded between Bulgarian Energy Holding EAD and Toplofikatsia Sofia

EAD according to which the debts of the district heating plant to Bulgarian Energy Holding EAD are merged and

novated. The debtor fully and unconditionally recognizes liabilities in the amount of BGN 500,465 thousand, as they

are repaid over a period of twenty years, with a five-year grace period, and interest on the principal in the amount of

3.25%. The agreement stipulates that upon conclusion of a concession contract between Sofia Municipality and a third

party, the latter undertakes to pay BEH EAD an initial installment of not less than BGN 200,000 thousand within 120

days from the date of entry into force of the concession agreement, and the balance will be paid in a manner agreed

between the parties.

Liabilities amounting to BGN 52,311 thousand were challenged by the debtor in 2015 by the submission of six claims.

In 2019 court proceedings were closed, and receivables in the amount of BGN 3,339 thousand were recognized. The

due amounts were paid by Toplofikatsia Sofia EAD in accordance with the agreement of 2020. For the unrecognized

liabilities amounting to BGN 48,972 thousand, the Company has recognized impairment in full.

As of 31 December 2024, the total amount of the recognised receivable under the agreement of 11 December 2015

amounts to BGN 391,098 thousand, including maturing principal amounts of BGN 18,983 thousand, overdue interest

of BGN 4,180 thousand and default interest of BGN 265 thousand.

Agreement as of 1 April 2019

A contract was concluded with Bulgargaz EAD on 28 August 2018 for the transfer of receivables from Toplofikatsia

Sofia EAD for consumed natural gas in the total amount on the date of contract conclusion, of BGN 99,193 thousand,

including a principal amounting to BGN 94,967 thousand and an interest amounting to BGN 4,226 thousand. The

receivables are fully overdue. An agreement was concluded with Toplofikatsia Sofia EAD on 1 April 2019, whereby

the debtor agreed that the debt would be paid by the debtor by 31 August 2025, and it would not pay principal
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
84
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
installments until 31 August 2019. The stipulated interest on the principal is at the rate of 4.66%, as of 28 August

2018. At a failure to pay any installment, an interest is due from the debtor for every day of default to the extent of

the base interest rate, fixed by the Bulgarian National Bank, plus a 10-point margin. The obligations under the

agreement are regularly paid according to the repayment schedule.

As of 31 December 2024, the total amount receivable under the agreement of 1 April 2019 is BGN 21,087 thousand,

including maturing principal amounts of BGN 9,644 thousand, overdue interest of BGN 294 thousand and overdue

interest in the amount of BGN 127 thousand.

Agreement as of 15 September 2022

On 15 September 2022, an agreement was signed with Toplofikatsia Sofia EAD, uniting obligations under assignment

agreements dated 23 December 2020, 28 October 2021, and 18 November 2021, with total amount of

BGN 333,596.905.98. The agreement became effective after approval by the Sofia Municipal Council obtained on 16

December 2022. The parties agreed that the due amount would be paid by the creditors until 31 March 2029 in monthly

installments with a grace period for the principal amount until 31 March 2023. The agreed interest on the principal

amounts to 3.525%. To secure the implementation of the obligations, the debtor has established a special pledge in

favor of the creditor covering all present, future, and conditional receivables of the debtor in bank accounts opened at

commercial banks on the territory of the Republic of Bulgaria and under contracts for the sale of energy to Independent

Bulgarian Energy Exchange EAD.

As of 31 December 2024, the total amount of receivable under the agreement of 15 September 2022 amounts to BGN

357,737 thousand, including maturing principal amounts of BGN 85,197 thousand, overdue interest of BGN 16,012

thousand and default interest of BGN 13,065 thousand BGN.

Tripartite Agreement of 2023 and Annex of 2024

On 19 July 2023 an agreement was signed between Bulgarian Energy Holding EAD, Toplofikatsia Sofia EAD and

the Security of the Electricity System Fund, whereby the parties agree that 20% of the monthly premiums due from

the Fund to Toplofikatsia Sofia EAD within the current price period from 01.07.2023 to 30.06.2024 will be credited

to the account of Bulgarian Energy Holding EAD. The proceeds will be used to repay obligations under the

Agreements of 2015 and 2019 between Bulgarian Energy Holding EAD and Toplofikatsia Sofia EAD. On 28 June

2024 an annex to the Agreement was signed, extending its validity for the price period from 01.07.2024 to 30.06.2025.

In 2024, amounts totalling BGN 64,791 thousand have been received from the Security of the Electricity System Fund

for the repayment of liabilities of Toplofikatsia Sofia EAD:

(1) for the repayment of liabilities under the Agreement of 11 December 2015 in the amount of BGN 45,121

thousand, including an amount of BGN 33,844 thousand for the repayment of principal and an amount

of BGN 11,277 thousand for the repayment of interest;

(2) for the repayment of obligations under the Agreement of 1 April 2019 an amount of BGN 19,670

thousand, including an amount of BGN 17,882 thousand for the repayment of principal and an amount

of BGN 1,788 thousand for the repayment of interest .

23.2. Receivables from the Security of the Electricity System Fund

31 December 2024 31 December 2023
BGN’000 BGN’000
Receivables on 1 January 130,544 255,266
Recognized revenue to compensate the costs of the public provider 1,067,188 1,721,230
Expenses of TPP Maritsa East 2 EAD, subject to compensation by the
Security of the Electricity System Fund - 26,670
Cash received (1,114,063) (1,872,622)
Receivables on 31 December 83,669 130,544

The Group’s exposure to credit and currency risk and impairment losses related to trade and other receivables are

disclosed in Note 37 Financial risk management objectives and policies.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
85
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
24. Deferred tax assets and liabilities

Deferred tax assets/(liabilities) Balance as of 1 January 2024 Recognized in profit or loss Recognized in other comprehensive income Balance as of 31 December 2024
BGN’000 BGN’000 BGN’000 BGN’000
Property, plant and equipment and intangible assets (922,198) (8,940) (182,296) (1,113,434)
Other temporary differences related to PPE (e.g. depreciation) 36,821 10,535 - 47,356
Financing 28,776 3,471 - 32,247
Unused paid leave 7,094 (973) - 6,121
Provisions 55,237 (2,223) - 53,014
Other provisions (litigation, etc.) 5,223 (5,175) - 48
Liabilities related to employee’ retirement income 26,384 3,553 14 29,951
Provisions for environmental protection (30) 3,435 - 3,405
Provision for spent nuclear fuel 138 3,175 - 3,313
Provision for reclamation (327) 6,997 - 6,670
Provisions for emission allowances (30,375) 42,831 - 12,456
Unpaid income to the staff 2,860 340 - 3,200
Financial assets at fair value through profit or loss (1) - (1)
Financial assets at fair value in other comprehensive income 1 - (17) (16)
Impairment of cash 1,081 (571) - 510
Impairment of investments 69 54 - 123
Impairment of inventories 21,807 (5,853) - 15,954
Impairment of trade and other receivables 108,124 2,359 - 110,483
Thin capitalization 29 8 - 37
(659,287) 53,023 (182,299) (788,563)
Recognized as:
Deferred tax assets 293,644 324,888
Deferred tax liabilities (952,931) (1,113,451)

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
86
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Deferred tax assets/(liabilities) Balance on 1 January 2023 Recognized in profit or loss Recognized in other comprehensi ve income Classified in disposal group Business combinations Balance as of 31 December 2023
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Property, plant and equipment and intangible assets (975,063) 13,844 40,745 40,745 (1,724) (922,198)
Other temporary differences related to PPE (e.g. depreciation) 25,667 11,154 - - - 36,821
Financing 29,382 (606) - - - 28,776
Unused paid leave 6,172 905 - - 17 7,094
Provisions 53,277 1,960 - - - 55,237
Other provisions (litigation, etc.) 23 5,200 - - - 5,223
Liabilities related to employee’ retirement income 24,163 416 1,822 (17) - 26,384
Provisions for environmental protection (30) - - - - (30)
Provision for spent nuclear fuel (3,079) 3,217 - - - 138
Provision for reclamation 1,208 (1,535) - - - (327)
Provisions for emission allowances (32,020) 1,645 - - - (30,375)
Unpaid income to the staff 4,368 (1,510) - - 2 2,860
Financial assets at fair value through profit or loss (1) - - - - (1)
Financial assets at fair value in other comprehensive income 7 - (6) - - 1
Impairment of cash 265 816 - - - 1,081
Impairment of investments 102 (33) - - - 69
Impairment of inventories 20,195 1,612 - - - 21,807
Impairment of trade and other receivables 120,076 (11,955) - - 3 108,124
Thin capitalization 7 22 - - - 29
(725,281) 25,152 42,561 (17) (1,702) (659,287)
Recognized as:
Deferred tax assets 284,912 293,644
Deferred tax liabilities (1,010,193) (952,931)

25. Inventories

31 December 2024 31 December 2023
BGN’000 BGN’000
Natural gas 496,008 762,891
Fuel 356,115 404,363
Spare parts 323,082 294,645
Other materials and consumables 113,422 79,228
Goods 693 19,515
Work in progress, including: -loaded unspent fresh nuclear fuel 87,163 72,660
-coal 159,395 140,929
-others 15 3,430
Inventories, gross amount 1,535,893 1,777,661
Impairment to net realizable value (140,892) (200,884)
Inventories, net of impairment 1,395,001 1,576,777

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
87
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The natural gas available at the reporting date mainly includes natural gas stored in the Chiren UGS. The fuels include

mainly uncharged fresh nuclear fuel, diesel and fuel oil.

The Group has no inventories provided as collateral for liabilities.

Natural gas of the subsidiary Bulgargaz EAD

In 2024, the amount of natural gas sold in the amount of BGN 1,316,578 thousand was reported as a cost in profit or

loss (31 December 2023: BGN 2,348,460 thousand). Revenue from the sale of natural gas amounted to BGN 1,420,521

thousand. (31 December 2023: BGN 2,507,716 thousand). The gross result from the sale of natural gas for 2024 is a

profit of BGN 103,943 thousand. For 2023 the net result is a profit of BGN 159,256 thousand.

In the second half of 2024, the Ministry of Energy implemented the compensation mechanism under the “Program for

Compensation of High Prices of Natural Gas Injected into the Chiren UGS in the Period 01.05.2022 - 11.10.2022”,

for the quantities of natural gas produced in the months of January-April 2024 and the subsidiary Bulgargaz EAD

received the compensation from the Security of the Electricity System Fund in the amount of BGN 156,775 thousand.

This amount is recognized as income from the sale of natural gas in profit or loss for the period.

As of 1 January 2023, a reference TTFfm price for January of the following calendar year is used in determining the

net realizable value of natural gas at the end of the reporting period. This management judgment is based on the

subsidiary's operating cycle, the seasonal nature of natural gas production and compression, and the commitments

made under the Contingency Plan to maintain certain quantities of natural gas available at the Chiren UGS.

In 2024, an impairment loss on inventories of BGN 36,042 thousand has been recognized, calculated for the natural

gas inventory at Chiren as at 31 December 2024. The subsidiary's management has tested the quantities of natural gas

that it expects to produce (i.e. realize through sale) during the period from January 2025 to May 2025, in accordance

with the Contingency Plan. The available natural gas stored at the Chiren UGS that has been tested for impairment as

of 31 December 2024 is 336,688.61 MWh. A reference TTFfm price for January 2025 of EUR 44.951/MWh,

published quotations on 31 December 2024 in the Argus Media newsletter (argusmedia.com), is attached.

In making its assessment of the net realizable value of the natural gas available as at 31 December 2024, the

management of the subsidiary Bulgargaz EAD considers the availability at the Chiren UGS of 1,635,000 MWh as a

non-producing reserve, stored in accordance with the requirements of the above Regulations and the Contingency

Plan, with a fixed production schedule only during the period November-April. Therefore, the net realizable value has

been calculated for the remaining volumes of natural gas held for trading, which amount to 598,545.617 MWh as at

31 December 2024. The result is a recovered impairment loss of BGN 343 thousand.

The Group has analyzed the circumstances and external sources of information (the reference exchange TTFfm price

for the month of January 2025 published on the Argus Media --(argusmedia.com) website) that would lead to the

existence of an indication of impairment of the value of natural gas and has concluded that there is no need to recognize

additional losses.

Recovery of impairment losses on inventories is recorded as part of the cost of gas sold during the period (previously

impaired). In 2024, the subsidiary Bulgargaz EAD has reversed impairment of produced volumes amounting to BGN

111,253 thousand.

Natural gas of the subsidiary Bulgartransgaz EAD

As of 23 December 2020, a new Contingency Plan for Ensuring the Security of Natural Gas Supply of the Republic

of Bulgaria is in force, according to which Bulgartransgaz EAD stores quantities of natural gas at Chiren UGS, with

a maximum volume of up to 70 million cubic meters, in compliance with an order of the Minister of Energy, issued

pursuant to Art. 70 of the Energy Act on imposing of additional obligations on society. The quantities specified in the

order represent a reserve necessary to ensure continuously supply according to Annex VIII of the Regulation

2017/1938.

In 2022, the Minister of Energy, in connection with the military conflict in Ukraine, by his orders imposed on the

subsidiary Bulgartransgaz EAD additional obligations for the service to the public, in order to ensure the security and

continuity of natural gas supply on the territory of the Republic of Bulgaria, under which the company purchased and

stored 205,300 MWh of natural gas.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
88
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
In 2024, a total of BGN 164,156 thousand of inventories were expensed to profit or loss (2023: BGN 142,264 thousand

), including inventory impairment charges of BGN 1,486 thousand. (2023: BGN 5,075 thousand).

TPP Maritsa Iztok 2 EAD

In 2024, a total of BGN 227,333 thousand of inventories have been expensed to profit or loss (2023: BGN 173,510

thousand). This amount also includes impairment of inventories amounting to BGN 1,320 thousand, including BGN

1,306 thousand impairment recorded on the basis of a report of a licensed appraiser and BGN 14 thousand impairment

based on change in stock prices during the year. (2023: BGN 136 thousand impairment based on changes in stock

prices during the year).

As of 31 December 2024, the subsidiary has valued the main part of the inventories through an independent licensed

appraiser. The review of inventories identified that the carrying value of a large portion of the inventories differed

materially from their net realizable value. An impairment of BGN 1,306 thousand was charged on inventories and an

impairment of BGN 118 thousand was reversed.

In 2024, the subsidiary recorded an impairment charge of BGN 14 thousand for ferrous and non -ferrous scrap, which

is part of inventories. (2023: BGN 136 thousand of impairment charges and reversed impairment of BGN 3 thousand),

based on a change in stock exchange prices pursuant to new stock exchange contracts concluded in 2024 for the

purchase and sale of goods through the intermediation of members of the Sofia Commodity Exchange.

NPP Kozloduy EAD

The continuous operation of NPP Kozloduy at maximum capacity is extremely important for the energy and national

security of Bulgaria. Regular supplies of fresh nuclear fuel will therefore ensure the smooth operation of Units 5 and

6. Taking into account the current military situation between the Russian Federation and Ukraine and the current

dependence of the plant on TWEL - Russian Federation, which is the main supplier of nuclear fuel for VVER-1000

type reactors, the subsidiary NPP Kozloduy EAD with the support of the state through the Ministry of Energy, took

measures to diversify the supply of fresh nuclear fuel. Reducing the dependence on single suppliers of nuclear

materials and services in the nuclear fuel cycle (NFC) is in line with the EURATOM Supply Agency's policy to ensure

the continuous and safe operation of nuclear facilities and the safety and reliability of electricity generation for the

population and industry of EU Member States. The European Energy Security Strategy, adopted on 28 May 2014,

calls for a comprehensive diversified portfolio of nuclear material and services supply in NFCs for all nuclear power

plant operators in the European Union.

Following the decision of the National Assembly of the Republic of Bulgaria on 9 November 2022 to accelerate the

process to secure an alternative supplier, partnership agreements were signed with Westinghouse Electric Sweden AB

and Framatome in December 2022.

Between Kozloduy NPP and Westinghouse Company a contract for supply of fresh nuclear fuel assemblies

(compatible with the currently used ones) for Unit 5 for a period of 10 years starting from 2024, when the first delivery

was accepted, for the value of 116,296 thousand BGN. The newly delivered fresh nuclear fuel cartridges were fully

loaded during the 31 campaigns of Unit 5. For the supply of nuclear fuel for Unit 6, a contract for a period of 10 years

starting from 2025 was concluded with the French company Framatom. In accordance with the concluded contracts,

the subsidiary NPP Kozloduy EAD has made advance payments related to the production and delivery of SNF in the

amount of BGN 179,468 thousand.

At the same time, in order to ensure the security of energy supply, in March 2022, the Company will provide the

following documents. The Council of Ministers approved a waiver of the European Union sanctions related to the war

in Ukraine, which prohibit the import of certain parts, materials and services from Russian suppliers, in order to allow

NPP Kozloduy to purchase the necessary materials and spare parts to ensure the planned annual repairs and operation

of the nuclear power plant.

The spare parts of the company are specific spare equipment for the operation of the power units and all facilities

related to the production of electrical energy, including ensuring and guaranteeing a continuous mode of operation.

As of 31 December 2024 on the basis of appraisals performed by an independent licensed appraiser an impairment

charge for inventories totaling BGN 54 thousand was recorded. (2023: BGN 232 thousand). For 2024 there is no

impairment reversal from prior periods (2023: BGN 175 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
89
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
26. Financial assets at fair value through other comprehensive income

Investment in the auction office JAO S.A.

In 2019, the Group, through its subsidiary ESO EAD, is a shareholder in the auction office JAO SA, which acts as a

Single Platform for Allocation of Transmission Capabilities (EPR) under Regulation 2016/1719 establishing

guidelines for pre-allocation of transmission capacity. JAO S.A distributes long-term transmission capacity (annual

and monthly) at all borders between EU member states. The value of the investment in the capital of JAO SA amounts

to BGN 507 thousand (31 December 2023: BGN 507 thousand).

Investment in shares of Transgaz S.A., Romania

On 17 December 2007, the Group through the parent company Bulgarian Energy Holding EAD participated in the

initial public offering of securities of TRANSGAZ S.A., Romania of an increase in the company's capital, acquiring

6,041 shares. In 2023, the number of shares was increased to 96,656 in connection with an increase in capital from

internal sources. The fair value of this investment as of 31 December 2024 is BGN 883 thousand (31 December 2023:

BGN 717 thousand) and is based on published quoted prices in an active market as at 30 December 2024. Any

revaluation effects on the investment for 2024 have been recorded in the fair value reserve of financial assets through

other comprehensive income.

In 2024, a dividend of BGN 13 thousand was received (2023: BGN 27 thousand).

Investment in shares of Balkangaz 2000 AD, Botevgrad

The group through the parent company Bulgarian Energy Holding EAD owns 10,000 registered shares of Balkangaz

2000 AD, Botevgrad, with a nominal value of BGN 1 (one) per share. The Company has a registered and paid -in

capital of BGN 903 thousand. The Group has been a shareholder since the establishment of the company in 2000. The

investment of Balkangaz 2000 AD is impaired and derecognised from the financial statements prepared before 2007

due to deteriorating financial condition of the company. The fair value of this investment as of 31 December 2024 is

BGN 2 thousand (31 December 2024: BGN 2 thousand) and is determined in accordance with IFRS 13 using level 3

of the fair value hierarchy. No dividend was received in 2024 and 2023.

Level 1 Level 3 Level 1 Level 3
31 December 2024 31 December 2023
BGN’000 BGN’000 BGN’000 BGN’000
Financial assets at fair value through other comprehensive income
Publicly traded shares 883 - 717 -
Unlisted shares - 509 - 509

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
90
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
27. Cash and short-term deposits

31 December 2024 31 December 2023
BGN’000 BGN’000
Cash in bank accounts 1,619,778 2,970,142
Cash 609 476
Deposits 1,106,488 125,992
Blocked cash with special purpose 803,617 537,374
Cash provided as collateral 175,409 256,448
Cash included in the disposal group 102 102
Gross value of cash and cash equivalents 3,706,003 3,890,534
Effect from expected credit losses (6,119) (12,140)
Cash and short-term deposits in the condensed financial statement 3,699,884 3,878,394
Financial assets provided as collateral (175,520) (256,655)
Effect from expected credit losses 111 207
Cash in the Consolidated Statement of Cash Flows 3,524,475 3,621,946

Cash in bank accounts bears interest at floating rates based on negotiated bank deposit rates.

Blocked cash with special purpose

The amount of special purpose cash that is blocked for the Group at 31 December 2024 is BGN 803,617 thousand

(31 December 2023: BGN 537,374 thousand) and is due on the following grounds:

- BGN 707,367 thousand allocated funds to a special account pursuant to Regulation (EU) 2019/943 on the internal

electricity market (31 December 2023: BGN 488,227 thousand);

- BGN 81,100 thousand in a special account at TB Eurobank Bulgaria AD, opened under conditions approved by

the Ministry of Energy. The funds set aside from the available cash resources are tied up and are unavailable for

making other payments beyond their intended purpose. They are purposefully spent only for covering expenses

for SNF management, including operations for their transportation, technological storage and reprocessing of

SNF that has not been carried out in previous years (31 December 2023: BGN 48,827 thousand).

- BGN 15,000 thousand financial security for the overdraft agreement between DSK Bank AD and the subsidiary

Mini Maritsa-Iztok EAD (31 December 2023: zero BGN)

- BGN 150 thousand in a special purpose current account, and are to be used as collateral as per Art. 19, para. 2

of the Terms and Conditions of Access to the Electricity Transmission and Distribution Networks (31 December

2023: BGN 150 thousand).

- As of 31 December 2023, BGN 170 thousand have been set aside in a special purpose current account at Allianz

Bank Bulgaria AD in connection with a contract with the EWRC. As of 31 December 2024, no funds have been

set aside.

Cash provided as collateral

The amount of cash presented as collateral at 31 December 2024 is BGN 175,520 thousand. (31 December 2023:

BGN 256,655 thousand) and is blocked on the following grounds:

- USD 84,353 thousand and EUR 4,868 thousand represent collateral in the form of deposits on borrowings for

operating and capital expenditures which bear interest at an annual rate (31 December 2023: USD 115,030

thousand and EUR 6,504 thousand);

- EUR 2,910 thousand cash blocked in escrow account in connection with additional financing in the form of

capital increase of Gastrade S.A. or borrowed funds during the construction phase and until completion of the

project (31 December 2023: EUR 7,410 thousand);
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
91
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- USD 800 thousand financial security for an agreement between the subsidiary Bulgartransgaz EAD and Gastrade

S.A. for the operation and maintenance of Gastade S.A.'s pipeline and onshore facilities. (31 December 2023:

BGN zero).

- As of 31 December 2023, there is a cash block securing the payment obligation for the penalty in case AT.39849

BEH-GAS in the amount of USD 14,599 thousand. As of 31 December 2024, there are no cash balances blocked.

28. Share capital and reserves

28.1 Share capital

The registered capital of the parent company Bulgarian Energy Holding EAD consists of 3,463,941,744 ordinary

shares with a par value of BGN 1 each as of 31 December 2024 (31 December 2023: 3,463,941,744 shares). The

Company shares are ordinary, registered, non-privileged, with voting rights. All ordinary shares are fully paid. Each

share entitles to one vote, the right to a dividend and a liquidation share in Group’s assets. The sole shareho lder in the

capital is the Bulgarian state through the Minister of Energy.

The shares issued and authorized for the reporting periods may be presented as follows:

2024 2023
Number of shares Number of shares
Number of shares issued and fully paid:
At the beginning of the year 3,463,941,744 3,462,941,744
Capital increase during the year - 1,000,000
Total number of shares authorized at the end of the year 3,463,941,744 3,463,941,744

By a decision of the Minister of Energy of 30 October 2023, a non-monetary contribution of BGN 1,000 thousand

was made to the capital of Bulgarian Energy Holding EAD, the reason being the state’s ownership of 100% of the

shares of Minproekt EAD. The increase was entered into the Commercial Register and the Register of Non-Profit

Legal Entities on 16 November 2023.

28.2 Other reserves

The other reserves are formed from the distribution of the profit according to the Commerce Act and the Articles of

Association of the companies of the Group or from other sources by decision of the sole shareholder. These include

legal reserves and other general provisions. Legal reserves are set aside until they reach one tenth or more of the

capital. Sources for the formation of legal reserves are at least one tenth of the net profit, premiums from issues of

shares and funds provided in the Articles of Association or by decision of the sole shareholder. Statutory reserves can

only be used to cover losses from the current and previous reporting periods. General reserves are formed on the

proposal of the board of directors and can be used to cover losses from previous years and for other purposes.

28.3 Revaluation reserves to fair value

Revaluations to fair value of revaluation of financial assets at other comprehensive income are reported in revaluation

reserves.

28.4 Revaluation reserve of non-financial assets

The revaluation reserve is used to reflect increases in the fair value of property, plant and equipment and decreases to

the extent that those decreases relate to an increase in the same asset previously recognized in other comprehensive

income.

28.5 Reserve from recalculation of foreign operation

The Group has a subsidiary in the Republic of Northern Macedonia whose functional currency is the Macedonian

Denar. The recalculation reserve has been formed as a result of exchange differences as of 31 December 2024.

28.6 Reserve from revaluation of defined benefit plans

Reserve for defined benefit plans includes actuarial gains and losses resulting from the revaluation of defined benefit

plans.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
92
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
29. Loans and lease liabilities

The loans include the following financial liabilities measured at amortized cost:

31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current portion
Issued bonds 1,171,640 2,343,262
Bank loans 570,652 836,916
Financial lease 2,137 1,861
1,744,429 3,182,039
Current portion
Bank loans 487,188 312,392
Issued bonds 1,206,731 33,691
Financial lease 1,079 918
1,694,998 347,001
3,439,427 3,529,040

The information on the major terms and conditions of utilized loans and borrowings under lease agreements is

presented as follows:

Creditor Borrower/Issuer Interest rate Matu rity date/ year 31 December 2024 31 December 2023
BGN’000 BGN’000
(1) Bond issue 2018 BEH EAD 3.50% 2025 1,193,971 1,193,046
(2) Bond issue 2021 BEH EAD 2.45% 2028 1,184,400 1,183,907
(3) Investment loan in EUR from the European Investment Bank (4) Loans received from Bulgartransgaz EAD, including principal: BEH EAD from 0.26% to 2.89% 2047 215,380 215,380
(4.1) Syndicated investment loan in EUR from the Bulgarian
Development Bank AD. Bulgartransgaz EAD EURIBOR 2026 83,972 127,780
International Investment Bank and International Asset Bank AD (4.2) Syndicated investment loan in +2.00%
EUR from the Bulgarian Development Bank AD and the Bulgartransgaz EAD EURIBOR +2.00% 2027 26,844 38,774
International Investment Bank (4.3) Investment loan in Euro from Unicredit Bulbank AD Bulgartransgaz EAD EURIBOR+1.75% 2026 74,971 114,087
(4.4) Investment loan in Euro from Unicredit Bulbank AD Bulgartransgaz EAD EURIBOR+1.75% 2027 44,006 63,564
(4.5) Investment loan in EUR from UBB Bulgaria AD Bulgartransgaz EAD EURIBOR+1.75% 2026 39,117 58,675
(4.6) Investment loan in EUR from DSK Bank AD Bulgartransgaz EAD EURIBOR+1.65% 2026 39,117 58,675
(4.7) Investment loan in EUR from DSK Bank AD Bulgartransgaz EAD EURIBOR+1.65% 2027 73,175 101,502
(4.8) Investment loan in EUR from Eurobank Bulgaria AD Bulgartransgaz EAD EURIBOR+2.00% 2026 27,507 40,147
(4.9) Investment loan in EUR from Eurobank Bulgaria AD Bulgartransgaz EAD EURIBOR+2.00% 2027 17,602 25,426

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
93
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Creditor Borrower/Issuer Interest rate Matu rity date/ year 31 December 2024 31 December 2023
BGN’000 BGN’000
(4.10) Investment loan in Euro from ING Bank H. V. Bulgartransgaz EAD EURIBOR+1.75% 2025 2,044 27,057
(4.11) Investment loan in Euro from ING Bank H. V. Bulgartransgaz EAD EURIBOR +1.23% 2025 81,580 95,976
(4.12) Investment loan in EUR from United Bulgarian Bank AD Bulgartransgaz EAD EURIBOR+1.40% 2027 26,404 38,139
(4.13) Working capital loan from Citi Bank Europe AD Bulgartransgaz EAD BIR+1.70% 2026 47,601 63,601
(4.14) Working capital loan in EUR from Investbank AD Bulgartransgaz EAD EURIBOR+1.75% 2027 22,165 29,989
(4.15) Working capital loan in EUR from D Commerce Bank AD Including interests: Bulgartransgaz EAD Bulgartransgaz EAD EURIBOR+1.75% 2027 16,896 328 22,862 674
(5) Revolving credit from DSK Bank AD with a limit up to BGN 50,000 thousand. Mini Maritsa Iztok EAD BIR + 1.90% 2025 19,981 -
(6) Investment loan from DSK Bank with a limit up to BGN Mini Maritsa Iztok EAD BIR + 1.89% 2024 -
19,100 thousand (7) Investment loan from DSK Mini Maritsa Iztok 1,910
Bank with a limit up to BGN 5,200 thousand EAD BIR + 1.89% 2024 - 520
(8) Overdraft from Eurobank Bulgaria AD Bulgargaz EAD 1M EURIBOR+1.2% 2025 88,096 -
(9) Overdraft from Unicredit Bulbank AD Bulgargaz EAD BIR + 0.47% 2025 111,054 -
(10) Overdraft from DSK Bank Bulgargaz EAD BIR + 0.5% 2024 - 24,526
(11) Loan from Mina Marishki Baseyn EOOD (in liquidation) Minproekt BIR + 10% 2023 - 44
(12) Liabilities under lease contracts in BGN 3,216 2,779
3,439,427 3,529,040

Terms and conditions of the borrowings

(1) Bond issue 2018

On 28 June 2018, in the context of highly volatile financial markets as a result of a number of negative news from the

international political scene, Bulgarian Energy Holding EAD successfully sold its third issue of Eurobonds for EUR

400 million on the Irish Stock Exchange Market. The parameters of the Eurobond are the following:

- amount of the bond issue of EUR 400 million;

- Maturity 28 June 2025;

- Fixed interest rate of 3.5% per annum;

- the interest is payable once a year on 28 June, with a first payment due on 28 June 2019;

- ISIN code XS1839682116 of the bond issue quoted on the Irish Stock Exchange (Euronext Dublin);

- BEH EAD should observe certain financial indicators, as follows:

• So long as any obligations are outstanding, the Issuer will not, and will not permit any of the larger

subsidiaries to, directly or indirectly, incur any financial indebtedness, except that, if the Issuer and any

of the larger subsidiaries may incur a financial indebtedness, if, after the incurrence of such financial

indebtedness and the receipt and application of the proceeds thereof: (1) no Event of Default has

occurred and is continuing or would continue; (2) the EBITDA Coverage Ratio is not less than 4. 0 to

1.0; and (3) the Consolidated Leverage Ratio is not more than 4.5 to 1.0.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
94
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
• As long as there are obligations under issued bonds, in case NEK EAD is declared by a Bulgarian court

as over-indebted within the meaning of the Bulgarian Commerce Act, the Issuer will not and will not

allow (as permitted by law) its larger subsidiaries, directly or indirectly, to assume financial obligations.

On 31 July 2018, Bulgarian Energy Holding EAD successfully increased its third Eurobond issue, listed on the Irish

Stock Exchange (Euronext Dublin), from EUR 400 million to EUR 550 million.

On 12 October 2018, Bulgarian Energy Holding EAD recorded a second increase of its third Eurobond issue, listed

on the Irish Stock Exchange (Euronext Dublin), from EUR 550 million to EUR 600 million.

The proceeds from the issue are intended for general corporate purposes and refinancing of Eurobonds issued by the

Company in 2013, with its maturity date in November 2018.

On 27 June 2019 - the first interest payment, on 24 June 2020 - the second interest payment, on 25 June 2021 - the

third interest payment, on 28 June 2022 - the fourth interest payment, on 27 June 2023 – the fifth interest payment, on

25 June 2024 – the sixth interest payment. The annual interest amounts to BGN 41,072 thousand (EUR 21,000

thousand).

(2) Bond issue 2021

On 15 July 2021, Bulgarian Energy Holding EAD successfully sold its fourth bond issue in the amount of EUR 600

million at an annual interest rate of 2.45%. Given the extremely strong interest from investors, the bond was re -

subscribed 2.3 times, and the interest rate respectively is the lowest achieved by Bulgarian Energy Holding EAD since

the Company participates in the international financial markets. The parameters of the Eurobond are the following:

- amount of the bond issue of EUR 600 million;

- maturity date on 22 July 2028;

- fixed interest rate 2.45% per annum;

- the interest is payable once a year on 22 July, with the first payment due on 22 July 2022;

- ISIN code XS2367164576 of the bond issue quoted on the Irish Stock Exchange (Euronext Dublin);

- BEH EAD should comply with certain covenants as follows:

• For as long as any Bond remains outstanding, the Issuer shall not, and shall not permit any of its Material

Subsidiaries to, directly or indirectly incur any Financial Indebtedness, provided, however, that the

Issuer and any Material Subsidiary may incur Financial Indebtedness, if, after giving effect to the

incurrence of such Financial Indebtedness and the receipt and application of the proceeds therefrom:

(1) no Event of Default has or would have occurred and is or would be continuing; (2) the EBITDA

Coverage Ratio would be not less than 4.0 to 1.0; and (3) the Consolidated Leverage Ratio would not

be more than 4.5 to 1.0.

• As long as there are obligations under issued bonds, in case NEK EAD is declared by a Bulgarian court

as over-indebted within the meaning of the Bulgarian Commerce Act, the Issuer will not and will not

allow (as permitted by law) its larger subsidiaries, directly or indirectly, to assume financial obligations.

The proceeds from the newly issued bonds are used to refinance the Company second bond issue with a face value of

EUR 550 million, sold in 2016, at an annual interest rate of 4.875%, with a maturity date August 2, 2021, as well as

for general corporate purposes, except of coal-related activities.

A first interest payment was made on 22 July 2022 and a second interest payment was made on 21 July 2023 and a

third interest payment was made on 19 July 2024. The annual interest payable amounts to BGN 28,751 thousand (EUR

14,700 thousand).

(3) Investment loan in EUR from the European Investment Bank

In October 2019, Bulgarian Energy Holding EAD and the European Investment Bank signed a Financing Agreement

for the construction of an IGB gas pipeline worth EUR 109.9 million, secured by a state financial guarantee from the

Republic of Bulgaria, the Guarantee Agreement for which has been ratified by the National Assembly. The loan is

provided to Bulgarian Energy Holding EAD as a shareholder in ICGB AD (project company). On its part, BEH EAD

transfers the loan financing to the project company through a Shareholder Loan Contract in the same amount, under

the same financial conditions set in the agreement with the European Investment Bank and without additional margin

for Bulgarian Energy Holding EAD. The repayment of the loan granted by the European Investment Bank will be
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
95
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
carried out with the use of a grace period for the repayment of the principal of the tranches drawn down, which,

according to the Agreement with the Bank, may have a duration of up to 7 years from the date of utilization of a

tranche.

The first tranche amounting to EUR 30 million was utilized on 17 August 2020 under the following terms: payment

of interest twice a year in the amount of 0.259%, five-year grace period for principal payments, payment of principal

twice a year, the last installment being due on 17 August 2045.

The second tranche amounting to EUR 30 million was utilized on 18 January 2021 under the following terms: payment

of interest twice a year in the amount of 0.237%, five-year grace period for principal payments, payment of principal

twice a year. The deadline for the last installment is 18 January 2046.

On 1 December 2021, the third tranche of EUR 30 million was utilized under the following conditions: payment of

interest twice a year in the amount of 0.612%, five-year grace period for principal payments, payment of principal

twice a year. The deadline for the last due installment is 1 December 2046.

The fourth tranche amounting to EUR 19.9 million was utilized on 29 September 2022 under the following terms:

payment of interest twice a year in the amount of 2.888%, five-year grace period for principal payments, payment of

principal twice a year. The deadline for returning the last installment due is by 29 September 2047.

As of 31 December 2024 the debt to the European Investment Bank amounts to BGN 215,380 thousand, including

BGN 214,946 thousand principal and BGN 434 thousand interest (31 December 2023: BGN 215,380 thousand). The

debt shall be serviced in a timely manner.

(4) Loan agreements for funding the investment projects of the subsidiary Bulgartransgaz EAD

The subsidiary Bulgartransgaz EAD has received loans for financing of operating and investment expenses from

several financial institutions. The principal amounts of the long-term loans have a grace period ranging from 12 to 17

months for the various loans and interest is payable monthly. The funds are intended to cover investment costs of the

company in connection with the implementation of large-scale investment projects. The loans are secured by cash in

the form of deposits in the amount of up to 20% of the drawn and outstanding portion of the loan.

(5) Working capital loan from DSK Bank AD with a limit of up to BGN 50,000 thousand.

Overdraft type working capital facility to cover temporary cash shortages in servicing cash payments related to and/or

incidental to the borrower's ordinary business activities, including expenses in connection with payment of tax

liabilities, payment to suppliers, payment of personnel obligations and other operational needs. The maximum

contractual amount of the loan is BGN 50,000 thousand. The term of the contract is 12 months from its signing, and

the deadline for repayment of all amounts due under the contract is 21 June 2025. The borrower can receive amounts

under the contract multiple times. Repayments of the loan shall be made automatically, with each receipt of funds in

the account of the borrower, with the received funds reducing the amount of the borrowed amounts on the loan. The

agreed interest rate is BIR + 1.90%. The one-off management and processing fee is 1% of the agreed amount of the

credit, payable upon signing of the contract. There is also a penalty under which the creditor shall charge a penalty

interest at the rate agreed in the contract and a penalty surcharge of 3% per annum on the outstanding principal amount

of the loan from the date of acceleration of the loan or from the date of final maturity to the date of final repayment.

The loan is financially secured in accordance with the Financial Collateral Contracts Act by way of a transfer of cash

in the amount of BGN 15,000 thousand by the debtor into the possession of the creditor on its account. In the event

of default of a monetary obligation at the relevant maturity date or in the event of acceleration, the creditor shall be

entitled, at its discretion, to apply the cash provided as collateral to repay the obligation. As of 31 December 2024, the

loan liability amounted to BGN 19,981 thousand.

(6) Investment loan from DSK Bank AD with a limit of up to BGN 19,100 thousand

Investment credit with a limit of up to BGN 19,100 thousand to fund the implementation of Contract No.MME/BWE

relating to the design, production, supply, construction and commissioning of rotary excavators SRs 2000 type at Mini

Maritsa-Iztok EAD. The contractual interest rate is an annual interest rate on the actually used amounts of the loan in

the amount of the BIR + a margin of 1,89% per annum. Lump management and processing fee of 0,29% on the loan

amount. The penalty interest for overdue installments is BIR+ 6%. The security is a special pledge of assets dated

24.11.2016, the value of which covers the amount of the loan. The duration of the loan is 81 months, with a 21 -month
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
96
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
grace period and a 60-month loan repayment period. The utilization period was extended to 31 July 2019 with an

Additional Agreement dated 25 June 2018, and the deadline for the repayment of all liabilities is 30 June 2024. During

the grace period, the Company owes interest every month on the actually utilized portion of the investment loan. As

of 31 December 2024, the principal amount of the loan is fully repaid in the amount of BGN 19,100 thousand, the

total interest paid on the loan is BGN 1,345 thousand. Obligations under the agreement have been paid and the

agreement has been closed.

(7) Investment loan from DSK Bank AD with a limit of up to BGN 5,200 thousand

Investment credit with a limit of up to BGN 5,200 thousand to fund the implementation of Contract No.MME/BWE

relating to the design, production, supply, construction and commissioning of rotary excavators SRs 200 type at Mini

Maritsa-Iztok EAD. The contractual interest rate is an annual interest on the actually used loan amounts in the amount

of BIR + margin of 1.89% per year. Lump management and processing fee of 0,29% on the loan amount. The penalty

interest for overdue installments is BIR+6%. The security is a special pledge of assets dated 24.11.2016, the value of

which covers the amount of the loan. The duration of the loan is 81 months, with a 21 -month grace period and a 60-

month loan repayment period. The utilization period was extended to 31 July 201 9 with an Additional Agreement

dated 25 June 2018, and the deadline for the repayment of all liabilities is 30 June 2024. During the grace period, the

Company owes interest every month on the actually utilized portion of the investment loan. As of 31 Decem ber 2024

the principal amount of the loan is fully repaid in the amount of BGN 5,200 thousand, the total interest paid on the

loan is BGN 349 thousand. As of 31.12.2024, the obligations under the agreement have been paid and the agreement

has been closed.

(8) and (9) Bank overdrafts received by the subsidiary Bulgargaz EAD

Two bank overdraft type loans with a total limit of BGN 234,700 thousand, which are in BGN and EUR, with a

repayment term of 29 December 2024. The loans are secured by a state guarantee up to 90% of the value of the

overdrafts on the basis of two Guarantee Agreements dated 29 December 2023 and expiring on 29 December 2024.

As of 31 December 2024 the utilized funds amount to BGN 199,020 thousand.

(11) Loan from Mina Marishki Baseyn EOOD - in liquidation

On 23 December 2022, a loan agreement was concluded with Mina Marishki Baseyn EOOD to finance the current

activities of Minproekt EAD. The loan was drawn down in full on 23 December 2022. As of 31 December 2024, the

loan has been repaid.

State guaranteed loans

The loan granted to the Group by the European Investment Bank (3) in the amount of EUR 109.9 million is secured

by a state financial guarantee from the Republic of Bulgaria.

The provided overdraft type bank loans (8) and (9) with a total limit of BGN 234,700 thousand are secured by a state

guarantee of up to 90% of the value of the overdrafts on the basis of two guarantee agreements dated 29 December

2023 and valid until 29 December 2024.

For the loans received as of 31 December 2024 and as of 31 December 2023, which are secured by a government

guarantee, the Group is not able to determine the effect of the government guarantee provided on the agreed interest

rate and whether this guarantee would have a significant effect on their fair value as of that date.

Unutilised loans

As of 31 December 2024, the total amount of the Group's undrawn amounts to overdraft agreements is BGN 65,699

thousand (31 December 2023: BGN 300,174 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
97
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
30. Deferred financing

31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current portion 687,667 670,969
Current portion 24,952 23,471
712,619 694,440
31 December 2024 31 December 2023
BGN’000 BGN’000
On 1 January 694,440 707,974
Received during the year 85,347 18,940
Recognized in profit or loss as a result (71,578) (32,399)
Deducted advances (11) -
Reimbursed funding (172) (75)
Transfer from liabilities for distribution to owners 4,593 -
On 31 December 712,619 694,440

As of 31 December 2024, no outstanding conditions and irregularities have been identified in relation to the funding

received. Financing is recognized as income systematically over the useful life of the non-current assets for which

they are received.

Funding is mainly related to the following significant projects:

Projects of TPP Maritsa Iztok 2 EAD

- ISPA funding for the construction of desulphurization plants for Unit 5 and Unit 6. The assets have been built

and put into operation. The balance of the financing as of 31 December 2024 includes the carrying amount of assets

of BGN 5,306 thousand. (31 December 2023: BGN 5,889 thousand).

- Funding from the Kozloduy International Fund for the construction of an installation for dewatering of

gypsum and CPS. The assets have been built and put into operation. The balance of the financing as of 31 December

2024 includes the book value of assets in the amount of BGN 6,903 thousand. (31 December 2023: BGN 8,806

thousand).

- Funding from the Energy Resources Fund for the construction of a ash dump. The assets have been built and

put into operation. The balance of the financing as of 31 December 2024 includes the carrying amount of the assets

of BGN 1,337 thousand. (31 December 2023: BGN 1,531 thousand).

Projects of Mini Maritsa Iztok EAD:

- Financing for fixed assets related to the Kozloduy International Fund, as the administrator of the fund is the

European Bank for Reconstruction and Development, and the management of their absorption by the Bulgarian side

is carried out by the Ministry of Energy. Funding is related to energy efficiency through rehabilitation of heavy

industrial mining equipment and replacement of rotary multi- bucket excavators of the company and other activities.

The financing amounts to a total of EUR 30,150 thousand;

- Funding under the Connecting Europe Facility (CEF) - Telecommunications sector for the project Data

Center for Cyber Security in Mini Maritsa-Iztok EAD. A grant agreement was concluded on 23 July 2020 between

the company and the European Commission in the person of the Innovation and Networks Executive Agency (INEA),

Department C - Connecting Europe Facility. The project is worth EUR 278,619. Funding is provided by 75% of the

European Commission and 25% of the company. The grant for the project amounts to a maximum amount of EUR

208,964. Following the entry into force of the Agreement, the Executive Agency for Innovation and Networks made

an advance payment of EUR 125,378. The start date of the Project shall be 1 October 2020 and the end date of the

Project (after the signed Amendment No.1 to extend the implementation period) shall be 1 February 2024. The purpose
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
98
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
of the Project is to increase the cybersecurity capabilities of Mini Maritsa-Iztok EAD by implementing a monitoring

system and automated analysis of traffic and events in the server and communications infrastructure, which will ensure

timely reporting of incidents related to potential security threats. The implementation of the project consists of the

execution of 3 main activities: (1) Design of the company's cyber security Data Center; (2) Preparation of the Data

Center premises; (3) Delivery, installation and commissioning - includes delivery and installation of the computer

hardware and installation of SIEM software, staff training, testing of the SIEM software and joining the Sector ISAC

at European level. During the course of the project, delays accumulated, which resulted in the implementation of

Activity 1 and Activity 2, and the implementation of Activity 3 went beyond the time frame of the Agreement. This

resulted in the recognition of eligible costs only for Activities 1 and 2 and led to the need to repay part of the amount

due to non-utilization within the deadline. The project has been closed as of 31 December 2024.

Projects of NPP Kozloduy EAD and its subsidiaries

- Funding under programs and funds for the construction of property, plant and equipment for environmental

purposes, the more significant of which amounted to BGN 79,830 thousand received under EBRD funded projects

relating to the construction and equipment of the dry storage facility for spent nuclear fuel (SNF) and monitoring

systems (31 December 2023: BGN 86,843 thousand).

Projects of NEK EAD

- Funding under programs of the Energy Resources Fund, Swiss Government, Connecting Europe Facility and

under a preventive program from by ZAD Energia for the rehabilitation of hydroelectric plants and other assets in

previous periods in the amount of BGN 58,040 thousand. (31 December 2023: BGN 51,459 thousand).

Projects of Bulgartransgaz EAD and subsidiaries

- On 7 October 2020, under the Operational Program "Innovations and Competitiveness" 2014 -2020 (OPIK),

an administrative contract was signed for the direct provision of grant financial aid No.BG16RFOP002-4.003-0001-

C01 for a project named "Completion of preparatory activities necessary for the start of the construction of the

Bulgaria-Serbia Intersystem Gas Connection", with an estimated total cost of BGN 9,240 thousand. The amount of

the grant is up to BGN 5,469 thousand. On 4 August 2022, an interim payment of BGN 1,183 thousand was received

under the grant agreement. On 23 January 2023, a second interim payment of BGN 1,375 thousand was received under

the grant agreement. On 25 March 2024, a final payment of BGN 336 thousand was received under the administrative

grant agreement. In connection with Decision No.РД-02-16-46/14.02.2024 issued by the Ministry of Innovation and

Growth, Bulgartransgaz EAD has reimbursed OPIC a grant of BGN 11 thousand. The total amount of grant funding

received under the project amounts to BGN 2,883 thousand. The administrative contract has been implemented and

all payments have been completed. On 23 April 2025, a communication was received from OPIC regarding the

decision in case No.2967/21.03.2025 of the Supreme Administrative Court (SAC) in administrative case No.310 of

2025, which was in favor of Bulgartransgaz EAD. The decision is final. In this respect, the administrative contract is

to be reimbursed for an estimated amount of BGN 11 thousand.

- On 11 December 2020, a grant agreement was signed with the funding institution INEA with the number

INEA/CEF/ENER/M2020/2247243 for the implementation of the Action with the number 6.8.3-0013-BG-WM-20

"PCI 6.8.3 Intersystem gas connection Bulgaria - Serbia (IBS) - construction activities" with an estimated total cost

of EUR 76,674 thousand. The amount of the grant is 36% of the value of the Action up to EUR 27,603 thousand. As

of the date of preparation of the financial statement, EUR 13,801 thousand advance payment or 50% of the funding

have been received. On 24 March 2025, EUR 13,801 thousand balance payment for the project was received. The

total amount of funding received under the project amounts to EUR 27,603 thousand. The Grant agreement was

implemented and all payments thereon have been completed.

- On 22 June 2022, a grant agreement was signed with the European Executive Agency for Climate,

Infrastructure and Environment (CINEA) for the co-financing of the expansion of the Chiren UGS with the following

identification number and name: Project 101069718 — 6.20.2-BG-WM-21-Extension of the Chiren UGS. The total

value of the costs, according to the decision of the EC to approve the financing, is in the amount of EUR 155,820

thousand. The amount of the grant is up 50% of the Grant agreement amount up to EUR 77,910 thousand. As of the

date of preparation of the financial statement, EUR 38,955 thousand advance payment or 50% of the funding have

been received. In June 2024, a EUR 271 thousand interim payment under the agreement was received. In March 2025,

Amendment No.1 to the grant agreement was signed extending the project implementation period until 7 December

2027.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
99
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Projects of the Electricity System Operator EAD

As of 31 December 2024, the value of the funding received from ESO EAD is in the total amount of BGN 297,802

thousand. (31 December 2023: BGN 267,070 thousand). The Company reported income from financing of BGN

38,275 thousand, of which BGN 9,849 thousand income from financing of fixed assets and BGN 28,426 thousand

income from financing of current activities. The income from fixed asset financing includes income of BGN 2,335

thousand from the National Recovery and Resilience Plan. The income from financing of current activities includes

income of BGN 1,683 thousand from European projects and income of BGN 26,743 thousand from the Program for

compensation of the costs of electricity transmission and distribution network operators for the purchase of electricity

for the period from 01.01.2024 to 31.12.2024, approved by Decision No 546/2024 and amended by Decision No 654

of 18.09.2024 and by Decision No 30 under item 1 of 23.01.2025 of the Council of Ministers.

31. Retirement employee benefit obligations

According to the Bulgarian labour legislation and the collective labour agreements of the companies of the Group, the

Group is obliged to pay to its employees upon retirement a certain number of gross monthly salaries depending on the

length of service in the companies of the Group. The defined benefit plan for staff on retirement is not funded.

31 December 2024 31 December 2023
BGN’000 BGN’000
Current portion 50,256 64,706
Non-current portion 319,060 271,416
Current value of the retirement benefit liability: 369,316 336,122

The changes in the provisions for retirement benefits according to Bulgarian Labour Code during the year are

presented as follows:

31 December 2024 31 December 2023
BGN’000 BGN’000
Retirement employee benefit obligation at the beginning of the year 336,122 313,184
Expenses for current and past work experience 80,793 30,424
Interest expenses 15,493 17,776
Effect of made transfer of personnel to a subsidiary (61,129) -
Payments made for the period (1,963) (44,159)
Actuarial losses /(gains) - 18,976
Classified in a disposal group - (79)
Retirement benefit liabilities at the end of the year 369,316 336,122

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
100
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The main assumptions used in determining the retirement income of employees are set out below:

31 December 2024 31 December 2023
BGN’000 BGN’000
Discount rate 3.95%-4% 3.75%-4.5%
Future salary increase 0%-8% 1.1%-19.9%
Staff turnover: 18-30 years 4% - 36% 4% - 36%
31-40 years 3% - 26% 3% - 26%
41-50 years 2% - 15% 2% - 15%
51-60 years 1% - 6% 1% - 6%
Over 60 years old 0% - 1% 0% - 1%

The Group’s management has made these assumptions with the help of independent actuaries. These assumptions

have been used in determining the amount of employee benefit obligations in retirement for the reporting periods and

are considered to be management’s best judgment.

The total amount of expenses under defined benefit plans of the Group recognized in profit or loss can be presented

as follows:

31 December 2024 31 December 2023
BGN’000 BGN’000
Expenses for current and past work experience (80,793) (30,424)
Interest expenses (15,493) (17,776)
Actuarial (losses)/gains recognized in the profit or loss (328) (8,588)
Total expenses recognized in the profit or loss (96,614) (56,788)

The total amount of expenses under defined benefit plans of the Group recognized in other comprehensive income

can be presented as follows:

31 December 2024 31 December 2023
BGN’000 BGN’000
Revaluation of liabilities under defined benefit plans - actuarial loss,including:
- Losses/Gains as a result of changes in demographic assumptions (720) 1,301
- Losses as a result of changes in the financial assumptions (5,644) (16,312)
- Gains/(losses) based on actual experience 8,658 (3,544)
Total revenue/(expenses) recognized in other comprehensive income 2,294 (18,555)

Significant actuarial assumptions in determining liabilities under defined benefit plans are related to the discount rate

and the expected percentage increase in salaries. The following table presents a sensitivity analysis and summarizes

the effects of changes in these actuarial assumptions on liabilities under defined benefit plans as of 31 December 2024:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
101
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
2024
1% increase 1% decrease
BGN’000 BGN’000
Change in the interest rate (17,207) 19,678
Salary growth 20,949 (19,502)

Sensitivity analysis is based on a change in only two of the assumptions. It may differ from the actual change in

defined benefit obligations because changes in assumptions are often interrelated.

The plan exposes the Group to actuarial risks such as interest rate risk, life expectancy risk and inflation risk:

• Interest rate risk - the present value of liabilities under defined benefit plans is calculated at a discount rate

determined on the basis of the yield on government securities issues. A decline in the market yield of government

securities will lead to an increase in liabilities under defined benefit plans of the Group;

• Risk of change in life expectancy - an increase in the life expectancy of employees would lead to an increase in

liabilities under defined benefit plans;

• Inflation risk - an increase in inflation would lead to an increase in liabilities under defined benefit plans.

32. Provisions

31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current portion
Provision for reclamation 169,945 102,788
Other provisions 161,145 161,145
331,090 263,933
Current portion
Provision for exceeding greenhouse gas emission quotas 493,518 30,856
Provision for environmental protection 2,242 28,469
Provision for reclamation 5,120 2,312
Provision for spent nuclear fuel 112,838 81,100
Other provisions 9,862 5,397
623,580 148,134
954,670 412,067

Provision for environmenta l protection Provisio n for recla- mation Provision for greenhous e gas emissions Provisio n for spent nuclear fuel Provision s for lawsuits and other provision s Total
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Balance as of 1 January 2023 1,812 120,452 7,215 48,927 171,978 350,384
Accrued 27,642 (15,165) 23,641 32,173 3,867 72,158
Used (985) (187) - - (9,303) (10,475)
Balance as of 31 December 2023 28,469 105,100 30,856 81,100 166,542 412,067
Accrued 2,242 70,072 462,662 31,738 4,500 571,214
Used (28,469) (107) - - (35) (28,611)
Carrying value on 31 December 2024 2,242 175,065 493,518 112,838 171,007 954,670

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
102
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Costs for provisions

2024 2023
BGN’000 BGN’000
Expenditure on purchases of greenhouse gas emissions (228,155) (657,784)
Recognized provisions (571,214) (72,158)
(799,369) (729,942)

Provision for transport, processing and storage of spent nuclear fuel

In accordance with the currently effective Strategy for the management of spent nuclear fuel and radioactive waste

until 2030, adopted by a decision of the Council of Ministers on 02 September 2015, The Group through the subsidiary

NPP Kozloduy EAD has the obligation to transport at least 50 tons of heavy metal spent nuclear fuel (SNF) yearly for

processing and storage in Russia, in the presence of favorable financial and economic conditions.

In 2018, a framework Addendum to the Contract for transportation, temporary technological storage and processing

in Russia of 414 spent nuclear fuel cartridges from WWER-1000 in the period 2019-2023 was signed between NPP

Kozloduy, PA MAYAK, Russia, agreed with Euratom Supply Agency, Luxembourg. A new transport scheme has

been developed for the transport of spent nuclear fuel from WWER-1000 in view of the long-term nature of the

preparatory activities for the removal of spent fuel, including organizational and technical activities, preparation of

the necessary documentation, obtaining certificates and permits. The first shipment under this scheme was carried out

in December 2020. The expenses for its implementation were financed from the funds allocated in 2 018 for the

management of SNG, including for the transport activities, technological storage and processing of SNG, which

remained unfulfilled from previous years.

In order to meet the obligations under the “Strategy for the Management of RAW and SNF until 2030” to transport a

minimum of 50 tons of heavy metal SNF per year and to secure the necessary funding, the Group has set aside an

additional provision for SNF management as of 31 December 2023 in the amount of BGN 81,100 thousand. Following

the calculation of the best estimate of the cost of 1 shipment of SNF from VVER-1000 (96 cassettes) as of 31

December 2024, additional funding for the planned shipments in the amount of BGN 31,738 thousand has been

secured to cover the current liability for 2024.

As of the end of the reporting period ending 31 December 2024, the amount of the recognized provision necessary to

cover the current obligation for SNF management is BGN 112,838 thousand, including the value of the unperformed

shipments of SNF from WWER-1000 for technological storage and processing for 2021, 2022, 2023 and 2024. The

capacity of the storage facilities for SNF from WWER-1000, assuming a long-term impossibility of transporting SNF,

is expected to be filled in 2032. The subsidiary NPP Kozloduy EAD has taken the necessary actions to select containers

for dry storage of SNF from WWER-1000 and license the expansion of the dry storage facility for spent nuclear fuel

(SNF) with a capacity of 38 containers for storing 722 SNF assemblies from WWER-1000. The expansion (Stage Ia)

of the dry storage facility for spent nuclear fuel (SNF) will provide additional capacity for SNF storage until 2040.

Provision for environmental protection

As of the reporting date, a provision for environmental protection costs has been recognized, relating to costs expected

to be incurred in connection with disposal of fluorescent and other mercury-containing lamps, disposal and recycling

of batteries, construction waste management. As of 31 December 2024, the carrying amount of the recognized

provision is BGN 2,242 thousand (31 December 2023: BGN 827 thousand).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
103
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Provision for reclamation of disturbed terrains from the coal mining activity

The basis for determining the average estimated costs for reclamation of one ton of production is the current

environmental legislation, the lands that are about to be seized, the seized non-reclaimed lands, the value of

reclamation of 1 decare of land, as well as the expected quantities of coal reserves until 2043. The amount of accrued

provisions in 2024 and 2023 was calculated based on the following data:

2024 2023
Coal extraction 13,745 19,465
Reclamation cost (BGN / ton of production) 0,20 0,12
Reclaimed land during the period (decares) 51 211

As there is significant uncertainty about the timing of future land reclamation activities to be carried out by the

Company, management is unable to determine the present value of the reclamation costs, so the provision is presented

at its undiscounted value.

In the future, the assessment of the reclamation provision could vary to varying degrees depending on changes in

environmental legislation and the aforementioned factors for its calculation.

Provision for reclamation of disturbed terrains - gypsum dump (depot) for disposal of gypsum from desulfurization

plants

Pursuant to Ordinance 26 on reclamation of disturbed terrains, improvement of unproductive lands, removal and

utilization of the humus layer, the Group has an obligation to carry out technological and biological reclamation of

the landfill after its filling with gypsum from desulfurization plants. According to the capacity of the landfill and the

amount of deposited gypsum, the landfill is expected to be filled in 5 years. The value of the technological and

biological reclamation under the project amounts to BGN 5,488 thousand. The present discounted value of the

provision is capitalized to the value of the facility ( Gypsum dump) and will be recognized each year as a depreciation

expense.

As of 31 December 2024, the best estimate of the required provision for landfill reclamation is BGN 5,488 thousand

31 December 2023: BGN 5,488 thousand).

Provision for greenhouse gas emissions

As of 31 December 2024, the Group has recorded provisions for shortfall of greenhouse gas emission allowances in

the amount of 3,512,990 t/CO2 amounting to BGN 459,167 thousand. (31 December 2023: 225,463 t/CO2 at the value

of BGN 30,856 thousand) for the subsidiary TPP Maritsa East 2 EAD. The shortfall amount represents the difference

between the 5,091,214 t/CO2 actually emitted and verified and the 1,578,224 t/CO2 available for 2024 in the account

in the National Register as of 31 December 2024. The value of the provision has been calculated in accordance with

the achieved purchase prices of the transactions for the purchase of allowances after 31 December 2024.

The Group has recognized a provision for shortfall of emission allowances in the amount of BGN 34,351 thousand

for the subsidiary Bulgartransgaz EAD, as there is a difference between the actual emitted and verified CO2 and the

CO2 available for the current year in the account in the National Registry at the end of the year. The value of the

provisions is calculated in accordance with the average spot segment selling price announced by the European Energy

Exchange (EEX) after the end of the financial year until the date of the verification report issued by an independent

accredited verification body.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
104
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Provision for claims made by AIS-3S Maritsa Iztok 1 EOOD

As of 31 December 2024, a provision of BGN 3,997 thousand has been recognized in relation to a claim made by

AES - 3C Maritsa East 1 EOOD to the Group for unpurchased minimum quantities of electricity for 2023 under the

Power Purchase Agreement 2001 (31 December 2023: BGN 27,642 thousand).

Provisions on proceedings by the European Commission against the Group of Bulgarian Energy Holding EAD - Case

COMP/B1/АТ.39849 – BEH gas

The case concerns a possible violation of Article 102 TFEU in relation to alleged actions by BEH EAD and its

subsidiaries Bulgargaz EAD and Bulgartransgaz EAD aimed at:

• preventing their competitors from gaining access to key gas infrastructure (gas transmission network and the

natural gas storage facility) in Bulgaria, such as explicitly or tacitly denying access to third parties or delaying

it;

• preventing competitors from receiving access to a main gas import transmission network by reserving a

capacity, which remains unused.

The proceedings were instituted in 2013 with a view to adopting a decision under Chapter 3 (Articles 7 to 10) of

Regulation 1/2003.

On 25 October 2023, the court of first instance rendered a Decision in favor of Bulgarian Energy Holding EAD,

Bulgartransgaz EAD and Bulgargaz EAD, with which it completely annulled the fine imposed by the European

Commission on the three BEH Group companies in the amount of EUR 77,068,000.

On 11 January 2024, the European Commission filed an appeal against the decision of the court of first instance,

requesting the annulment of the Decision of the General Court in its entirety. Based on the appeal, case C -14/24 R

was initiated before the Court of Justice of the European Union – European Commission against BEH and others.

On 29 March 2024, BEH-Group filed a reply to the European Commission's complaint with the Court of Justice of

the European Union.

On 22 July 2024, the European Commission submitted a counter-answer to the Court of Justice of the European Union.

On 30 September, BEH-Group provided a response.

On 30 September 2024, Bulgarian Energy Holding EAD, Bulgartransgaz EAD and Bulgargaz EAD, and the State,

filed replies to the European Commission's complaint in Case C-14/24 before the Court of Justice of the European

Union.

On 5 November 2024, the Court of Justice of the EU notified the parties that the written procedure was closed.

The Bulgarian side has also submitted a justification for the Court to allow oral hearings as at first instance. Oral

hearings in the case are expected in the second quarter of 2025.

The Group has recognized a provision in case COMP/B1/AT.39849 - BEH gas as at 31 December 2024 in the amount

of BGN 161,145 thousand. (31 December 2023: BGN 161,145 thousand).

Other provisions

The Group has provisions for recognized liabilities in court cases.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
105
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
33. Deferred income

31 December 2024 31 December 2023
BGN’000 BGN’000
Deferred income - long-term Regulation 943/2019 727,161 666,528
Deferred income - long-term, others 3,383 3,780
Deferred income - non-current 730,544 670,308
Deferred income - short-term Regulation 943/2019 16,141 6,810
Deferred income - short-term, others 18,147 23,316
Deferred income - current 34,288 30,126
764,832 700,434

Deferred income under Regulation (ЕС) 2019/943

Possessing the license for transmission of electricity and assets from the electricity system, the Group through the

subsidiary ESO EAD is obliged to apply the requirements of Regulation (EC) 2019/943 of the European Parliament

and of the Council. As required by Art. 19 of the Regulation, regarding the allocation and use of all revenue resulting

from the allocation of inter-zone capacity, ESO EAD, as an independent transmission operator, aims to achieve the

following long-term objectives:

• ensuring the actual availability of the allocated capacity;

• maintaining or increasing inter-zone capacity by optimizing the use of existing interconnectors through

coordinated corrective actions or covering costs arising from network investments related to reducing congestion in

interconnectors.

Deferred revenue from sales of liquified natural gas

Included in deferred income as at 31 December 2024 are BGN 17,149 thousand relating to the subsidiary Bulgargaz

EAD (31 December 2023: BGN 17,149 thousand) related to the acquisition and subsequent sale of liquefied natural

gas (LNG) to a natural gas supplier, for the purpose of regasification and transportation to an entry point of the

country's gas transmission system. The amount of deferred revenue is calculated as the difference between the

purchase and delivery cost of natural gas and will be recognized as current revenue and an adjustment to the cost of

natural gas (LNG) in the period of delivery in a subsequent reporting period.

34. Related party disclosures

The related parties of the Group include the sole shareholder in the person of the Ministry of Energy, associates and

joint ventures, key management personnel, as well as all public sector enterprises that are under the general control of

the ministries of the Council of Ministers in Bulgaria. Information on the name, country of incorporation, shareholding

and voting rights of each subsidiary included in the consolidation is provided in note 1. Information on the name,

country of incorporation, shareholding and voting rights of each associate and joint venture, is provided in note 21.

The total amount of related party transactions and estimated for the current and previous reporting periods are

presented as follows:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
106
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Sales to related parties, including dividends Purchases from Associated parties, including dividends Trade receivables from Associated parties Trade payables to related parties
BGN’000 BGN’000 BGN’000 BGN’000
Sole owner
Ministry of Energy 2024 26,652 302,045 7,191 804,602
Ministry of Energy 2023 8 1,462,847 - 826,084
Jointly controlled companies
Gastrade S.A. 2024 7,063 - 23,942 -
Expected credit losses - (1,709) -
Gastrade S.A. 2023 16,879 - 16,879 -
- (1,191)
South Stream AD 2024 1 - - -
South Stream AD 2023 1 - - -
Associated companies
ContourGlobal Maritsa Iztok 3 AD 2024 25,749 199,897 1,819 1,910
Expected credit losses - - (60) -
ContourGlobal Maritsa Iztok 3 AD 2023 173,713 1,253,168 27,693 191,711
Expected credit losses - (90) -
Contour Global Operations Bulgaria AD 2024 11 - - -
Contour Global Operations Bulgaria AD 2023 1,649 - 7 -
Allianz Bulgaria Pension Company AD 2024 8,058 932 - 76
Allianz Bulgaria Pension Company AD 2023 5,927 978 - 80
ZAD Energy 2024 4,220 16,385 - 10,508
ZAD Energy 2023 4,450 16,268 - 10,532
ICGB AD 2024 13,889 46,592 227,982 4,862
Expected credit losses -
ICGB AD 2023 282 36,838 227,974 4,513
Expected credit losses - - (1) -
Other related parties under joint control
Public sector entities under joint control of the Council of Ministers in the
Republic of Bulgaria 2024 1,200,752 464,032 354,447 5,256
Expected credit losses - - (3) -
Public sector entities under joint control of the Council of Ministers in the
Republic of Bulgaria 2023 1,652,870 411,645 142,556 4,422
Expected credit losses - - (2) -
Trade receivables/liabilities from/to related parties 2024 613,609 827,214
Trade receivables/liabilities from/to related parties 2023 413,825 1,037,342

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
107
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Terms of transactions with related parties

Sales from and purchases by related parties are made under conditions regulated by the sole owner. Outstanding

balances at the end of the year are interest-free and are settled in cash. No guarantees or collateral have been provided

or received for receivables from or debt to related parties. An impairment review is performed each financial year

based on an analysis of the related party's financial position and the market in which it operates.

Liability to the Ministry of Energy under a loan for purchase of natural gas f

In 2022, a loan was received from the Ministry of Energy in the amount of BGN 800,000 thousand, in connection

with Decision No.245 of the Council of Ministers dated 11.08.2022, which approved additional payments from the

budget of the Ministry of Energy in the amount of BGN 800 million for the purchase of natural gas and provision of

working capital. The loan is secured by a special pledge of current and future receivables from Toplofikatsia Sofia

EAD. The loan has a period of 36 months, starting from the date of the first tranche transfer, and the deadline for the

interest settlement is 18 months from the date of the first tranche. The total loan liability as at 31 December 2024

amounts to BGN 800,889 thousand. (31 December 2023: BGN 822,942 thousand).

Subordinated debenture loan receivable

In 2023, the Group provided a subordinated debenture loan in two tranches to Gastrade S.A. at an interest rate of 5%

per annum. The issuer repays the principal by 31 December 2032 at the latest. As at 31 December 2024, the Group

recorded a receivable under the provided bond loan in the amount of BGN 22,078 thousand, including principal of

BGN 22,140 thousand, accrued interest of BGN 1,647 thousand and accrued expected credit losses of BGN 1,709

thousand. As of 31 December 2023, the amount receivable under the bond loan is BGN 15,688 thousand, including

principal of BGN 16,272 thousand, accrued interest of BGN 607 thousand and accrued expected credit losses of BGN

1,191 thousand.

R emuneration of key management personnel

2024 2023
BGN’000 BGN’000
Remunerations (5,664) (4,739)
Social security contributions (363) (322)
Social costs (892) (832)
(6,919) (5,893)

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
108
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
35. Trade and other payables

31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current
Trade paybles 377,358 396,781
Guarantees retained 1,318 685
Financial liabilities 378,676 397,466
Current
Trade paybles 743,095 488,852
Deposits received 53,322 51,787
Guarantees retained 115,724 164,881
Insurance liabilities 4,249 4,211
Other paybles 55,836 54,466
Financial liabilities 972,226 764,197
Payables on advance payments 122,377 47,803
Payables to the SEFS 20,313 15,474
Liabilities under compensatory mechanism - 52,223
Payables to the Personnel 151,148 147,643
Social security payables 30,936 32,535
Payables to the budget 127,538 124,087
Payables for contributions to the DNF Fund and RAW Fund 107,428 104,038
Other paybles 27,224 13,696
Non-financial liabilities 586,964 537,499
1,559,190 1,301,696
1,937,866 1,699,162

The terms of the above commercial and other obligations are as follows:

- Trade obligations are not interest-bearing and are usually settled within ten to thirty days;

- The tax liabilities are not interest-bearing and are settled within the legally established terms;

- Other liabilities are not interest-bearing and are normally settled within fourteen days;

- According to contracts with subcontractors in connection with investment projects, the Group retains certain

amounts as a guarantee for quality execution of construction and installation works. Retained amounts are

determined as a percentage of the value of invoiced construction works. The amounts withheld are interest-free.

The amounts withheld should be paid in accordance with the contractual relationship with the subcontractors.

As of 31 December 2024, trade liabilities in the amount of BGN 469,771 thousand (31 December 2023: BGN 457,328

thousand) are due to the Association Consortium Arkad, related to the implemented activities under the project

"Expansion of the gas transmission infrastructure" of Bulgartransgaz EAD parallel to the northern (main) gas pipeline

to the Bulgarian-Serbian border, stage "Linear part" with a length of 474 km due. Under the terms of the contract, the

liabilities will be repaid on the basis of a repayment schedule until the end of 2031.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
109
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
36. Categories of financial assets and liabilities

The carrying amounts of Group’s financial assets and liabilities can be presented in the following categories:

Financial assets 31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current financial assets
Debt instruments at amortised cost, including: 235,790 230,809
Trade and other receivables 198 176
Receivables from related parties 235,592 230,633
Financial assets at fair value through other comprehensive income, including: 507 507
Capital instruments 507 507
236,297 231,316
Current financial assets
Debt instruments at amortized cost 6,038,251 5,553,579
Trade and other receivables 1,960,350 1,491,993
Receivables from related parties 378,017 183,192
Cash and cash equivalents 3,699,884 3,878,394
Financial assets at fair value through other comprehensive
income Capital instruments 885 885 719 719
6,039,136 5,554,298
6,275,433 5,785,614

Financial liabilities Note 31 December 2024 31 December 2023
BGN’000 BGN’000
Non-current financial liabilities at amortized cost
Loans and lease liabilities 29 1,744,429 3,182,039
Trade and other payables 35 378,676 397,466
Liabilities to related parties 34 - 800,000
2,123,105 4,379,505
Current financial liabilities at amortized cost
Loans and lease liabilities 29 1,694,998 347,001
Trade and other payables 35 972,226 764,197
Liabilities to related parties 34 827,214 1,037,342
3,494,438 2,148,540
5,617,543 6,528,045

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
110
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
37. Financial Risk Management Objectives and Policy

The Group has financial assets consisting of trade receivables, cash and short-term deposits that arise directly from

operations.

The Group’s financial liabilities include bond issues, loans and trade payables. The main purpose of the loans is to

provide financing for Group’s activities.

As of 31 December 2024 and 31 December 2023, the Group does not hold or trade in any derivative financial

instruments.

The main risks arising from Group’s financial instruments are liquidity, currency, credit and regulatory risk. Ongoing

risks are identified, measured and monitored through various control mechanisms introduced to determine adequate

prices for the services offered by the Group, as well as to adequately assess the market circumstances of investments

and forms of maintaining free liquidity, without allowing undue concentration of a risk and others. The risk

management in the Group is carried out on an ongoing basis by the management and the respective structural units,

depending on the type and specifics of the different types of risk to which the Group is exposed in its activities. The

policy applied by Group’s management to manage these risks is summarized be low.

37.1. Liquidity risk

Liquidity risk arises if the Group fails to meet its obligations when they become due. The Group applies an approach

that provides the necessary liquidity resources to meet the incurred liabilities under normal or stressful conditions

without incurring unacceptable losses.

One of the goals of the parent company is to provide, if necessary, financial resources of the subsidiaries to maintain

the operational activity, as well as for the implementation of strategic projects.

The parent company finances the operational activities of the companies in the Group in two ways:

• Internal financing, within the economic group, by redistribution of the free cash resource. Bulgarian Energy

Holding EAD acts as an intermediary between the companies, coordinating the conditions between them and

monitoring the execution of transactions at market levels.

• Interest rates on cash loans and deposits are based on market levels. The interest rates on cash loans and foreign

currency deposits are linked to a rate that is the market rate for such transactions during the transaction period

(floating or fixed).

• External financing – in case of shortage of funds in the economic group, Bulgarian Energy Holding EAD may

take actions for external financing. This is a preferred way to raise funds for investment projects.

As of 31 December, the maturity structure of Group’s financial liabilities, based on agreed undiscounted payments,

including trade liabilities, retained guarantees, liabilities to the Decommissioning of Nuclear Facilities Fund and the

Radioactive Waste Fund and other liabilities are presented below:

As of 31 December 2024 Carrying amount Agreed cash flows 6 months or less 6 - 12 months 1 - 5 years Over 5 years On demand (no maturity)
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Issued bonds (2,378,371) (2,503,072) (1,214,570) (28,751) (1,259,751) - -
Loans (1,061,056) (1,115,832) (168,126) (343,070) (414,978) (189,658) -
Trade and other payables (1,350,902) (1,394,340) (855,579) (114,036) (310,849) (97,696) (16,180)
Liabilities to related parties (827,214) (827,214) (559,928) (266,667) - - (619)
(5,617,543) (5,840,458) (2,798,203) (752,524) (1,985,578) (287,354) (16,799)

As of 31 December 2023 Carrying amount Agreed cash flows 6 months or less 6 - 12 months 1 - 5 years Over 5 years On demand (no maturity)
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Issued bonds (2,376,953) (2,572,895) (41,072) (28,751) (2,503,072) - -
Loans and lease obligations (1,152,087) (1,267,187) (167,401) (189,445) (703,811) (206,530) -
Trade and other payables (1,161,663) (1,225,227) (518,475) (222,983) (294,723) (153,612) (35,434)
Liabilities to related parties (1,037,342) (1,037,416) (214,415) (22,942) (800,000) - (59)
(5,728,045) (6,102,725) (941,363) (464,121) (4,301,606) (360,142) (35,493)

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
111
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
37.2. Interest rate risk

The Group is exposed to the risk of changes in market interest rates mainly with respect to financial assets and

liabilities with variable (floating) interest rates.

In the structure of Group’s assets, interest-bearing assets are represented by cash, bank deposits and loans, most of

which have a fixed interest rate. The Group also has loans granted with a combined structure of the borrowing rates,

which contains two components – fixed and variable. The borrowings of the Group are in the form of long -term and

short-term loans and predominantly have a fixed interest rate. This minimizes the likelihood of a change in the

unfavorable direction of cash flows.

The table below shows the sensitivity of the annual net financial result after taxes and equity to a likely change in

interest rates on loans with a floating interest rate based on BIR of +/- 0.01% (for 2023: +/- 0.01%). These changes

are determined to be likely based on observations of current market conditions.

The calculations are based on the change in the average market interest rate and on the financial instruments held by

the Group at the end of the reporting period, which are sensitive to changes in the interest rate. All other parameters

are assumed to be constant. There is no effect on the other items of Group’s equity.

As of 31 December 2024 Increase / decrease of the interest rate Effect on net financial result Effect on equity
% BGN’000 BGN’000
Receivables from Toplofikatsia Sofia EAD, bound by the BIR +0.1% 13 13
Receivables from Toplofikatsia Sofia EAD, bound by the BIR -0.1% (13) (13)
- -
- -
Loans in EUR (EURIBOR) +0.1% - -
Loans in EUR (EURIBOR) -0.1% - -
- -
Loans in BGN (BIR) +0.1% (2) (2)
Loans in BGN (BIR) -0.1% 2 2

As of 31 December 2023 Increase/decrease of the interest rate Effect on net financial result Effect on equity
% BGN’000 BGN’000
Receivables from Toplofikatsia Sofia EAD,bound by the BIR +0.1% 6 6
Receivables from Toplofikatsia Sofia EAD,bound by the BIR -0.1% (6) (6)
Loans in EUR (EURIBOR) +0.1% - -
Loans in EUR (EURIBOR) -0.1% - -
- -
Loans in BGN (BIR) +0.1% (4) (4)
Loans in BGN (BIR) -0.1% 4 4

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
112
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
37.3. Currency risk

The Group buys, sells, lends and receives loans in foreign currencies - Euro, US Dollars, British Pounds, Swiss Francs

and Macedonian Denars. The main part of these operations is carried out in EUR and USD. As the BGN/EUR

exchange rate is fixed at 1.95583, the currency risk arising from the Group’s euro exposures is minimal. The Group

makes payments for construction works and deliveries of assets under construction and goods in US dollars. In this

regard, there is a risk of changes in exchange rates. Therefore, the Group’s exposure is exposed to the risk of changes

in the US dollar exchange rate. In the event of significant fluctuations in future exchange rates, the Group may hedge

its exposure through derivative instruments such as currency swaps.

Increase in the exchange rate of the Bulgarian lev Decrease in the exchange rate of the Bulgarian lev
Net financial result Equity Net financial result Equity
BGN’000 BGN’000 BGN’000 BGN’000
As of 31 December 2024
USD (+/- 2.6%) (2,209) (2,209) 2,209 2,209
As of 31 December 2023
USD (+/- 2.2%) (6,754) (6,754) 6,754 6,754

37.4.Credit risk

In carrying out its activities, the Group is exposed to credit risk, which is associated with the risk that some of the

counterparties will not be able to fulfil and within the usual time their obligations. The credit quality of customers is

assessed by taking into account financial condition, past experience and other factors.

The Group's receivables are presented in the consolidated statement of financial position in net amount in net amount,

after deducting the accrued impairment for the expected credit loss.

In relation to the credit risk of uncollectability of receivables from counterparties, the Group takes the following

precautionary measures:

• for trade and other receivables that are overdue and were not secured upon their origination, deferred payment

arrangements are concluded and a collateral of not less than the initially recognized amount of the claim is

negotiated;

• under the other contracts, which are not secured in advance, the following usual actions are taken in cases of

overdue payment by the debtor company - offsetting liabilities to the Group against overdue receivables, and

if the amount of liabilities is not large enough to cover the receivable , then other out-of-court settlement

options are sought.

The Group currently monitors and analyses the servicing of receivables, the reasons for arrears and changes in the

financial capabilities of debtor companies and monitors the condition and quality of collateral received.

The Group has a significant concentration of credit risk with respect to receivables from Toplofikatsia Sofia EAD,

which accounts for 31% of the total net non-current and current receivables. As of 31 December 2024 the carrying

amount of the receivables from Toplofikatsiya Sofia EAD is BGN 934,392 thousand. (2023: BGN 807,978 thousand).

(note 23.1).

Credit risk arising from Group’s other financial assets, such as cash and other financial assets, is Group’s credit

exposure arising from the ability of its counterparties to default.

The maximum credit exposure of the Group in respect of recognized financial assets amounts to their respective

carrying amount in the consolidated statement of financial position as of 31 December :
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
113
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
31 December 2024 31 December 2023
BGN’000 BGN’000
Debt instruments at amortized cost, including:
Receivables from customers 1,412,904 1,279,686
Receivables from related parties 613,609 413,825
Claims and award receivables 40,706 44,703
Deposits with maturity over 3 months 374,860 -
Interest receivables on bank deposits 7,202 -
Other receivables 41,207 37,236
Receivables from SESF 83,669 130,544
Cash and cash equivalents 3,699,884 3,878,394
Capital instruments 1,392 1,226
6,275,433 5,785,614

Receivables from customers

The following table provides information on the age analysis and credit risk exposure of receivables from third parties

of the Group, using the matrix of provisions for expected credit losses as of 31 December:

31 December 2024 Expected credit loss rate Gross value of the trade receivables Expected credit loss Net value of trade receivables
% BGN’000 BGN’000 BGN’000
Not matured 61% 1,069,206 (658,769) 410,437
From 0-30 days 0% 44,927 (3) 44,924
From 31-60 days 74% 85 (63) 22
From 61 - 90 days 0% 271,232 (974) 270,258
From 91 - 180 days 55% 132,925 (72,526) 60,399
From 181 - 360 days 17% 351,585 (60,208) 291,377
Over 360 days 46% 619,700 (284,213) 335,487
43% 2,489,660 (1,076,756) 1,412,904

31 December 2023 Expected credit loss rate Gross value of the trade receivables Expected credit loss Net value of trade receivables
% BGN’000 BGN’000 BGN’000
Not matured 53% 1,317,039 (695,298) 621,741
From 0-30 days - 32,799 (17) 32,782
From 31-60 days 35% 40 (14) 26
From 61 - 90 days 1% 101,236 (759) 100,477
From 91 - 180 days 45% 138,986 (62,497) 76,489
From 181 - 360 days 10% 489,169 (48,714) 440,455
Over 360 days 97% 228,033 (220,317) 7,716
45% 2,307,302 (1,027,616) 1,279,686

Receivables from related parties

The following table provides information on the age analysis and credit risk exposure of receivables from related

parties of the Group, using the matrix of provisions for expected credit losses as of 31 December :
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
114
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
31 December 2024 Expected credit loss rate Gross value of the trade receivables Expected credit loss Net value of trade receivables
% BGN’000 BGN’000 BGN’000
Not matured 0.3% 615,381 (1,772) 613,609
615,381 (1,772) 613,609

31 December 2023 Expected credit loss rate Gross value of the trade receivables Expected credit loss Net value of trade receivables
% BGN’000 BGN’000 BGN’000
Not matured 0.3% 415,109 (1,284) 413,825
415,109 (1,284) 413,825

37.5. Market risk

Market risk is related to the fact that changes in market prices, such as foreign currency, interest rates or equity

instruments, will affect Group’s income from financial instruments. The purpose of market risk management is to

exercise control over market exposure at acceptable parameters while optimizing returns.

The Group undertakes periodic analyses of the macroeconomic environment in the country and in -depth analysis of

specific macro-indicators, including information on interest rates, which are submitted to the Board of Directors. The

Board is responsible for assessing the future risks faced by the Group. In the event of deteriorating market conditions,

hedging instruments may be used .

37.6. Regulatory risk

Regulatory risk is determined by the specifics of the business activity. According to Art. 21, para. 1, item 8a, item 8b,

item 8c, Art. 30, para. 1 and Art. 33a of the Energy Act, the following prices are subject to regulation by EWRC:

- at which the producers, within the availability determined by the Commission under Art. 1, item 21 shall

sell electricity to the public supplier;

- at which the producers sell thermal energy to the heat transmission company and to directly connected

customers;

- at which the heat transmission company sells thermal energy to customers;

- at which the public supplier sells to the end suppliers the electricity purchased on the grounds of Art. 21,

para. 1, item 21;

- (amended – SG, No.79/2019, effective 01.01.2020) under which the public supplier sells natural gas to the

final suppliers of natural gas and to a person to whom a license for production and transmission of thermal

energy;

- at which end suppliers sell natural gas to customers connected to the respective gas distribution networks;

- (amended - SG, No.57/20, in force from 01.10.2020) under which the final suppliers sell electricity to

household end customers for sites connected to the electricity distribution network, at low voltage level;

- for access and/or transmission through the transmission grid;

- to connection to the grids;

- for access and transmission of natural gas through transmission and/or distribution networks, except in the

cases where the Commission at its discretion approves a methodology for setting a price for access and

transmission through the transmission grid;

- for access and/or transmission through the electricity distribution grids;

- for access and storage of natural gas in a storage facility;

- for distribution of traction electricity on the distribution grids of the railway transport;

- for the provision of services to customers, as determined by the Commission, related to the licensing

activity;
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
115
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- including the price or the price component through which all end customers connected to the electricity

system, including the electricity transmission network operator and the electricity distribution network

operators, shall participate in compensation of the costs under Art. 34 and Art. 35.

- determines for each price period a limit value of the costs of the electricity transmission network operator

for purchasing availability for additional services by the order of art. 105, para. 2;

- determines annually by June 30 premiums for electricity from renewable sources and from high-efficiency

combined production of electricity and heat produced by power plants with a total installed electrical

capacity of 500 kW and over 500 kW

- for the purposes of pricing, determine annually by June 30 an estimated market price of electricity to cover

the technological costs of the transmission system operator and the distribution system operators

Price regulation has a significant impact on revenues, expenses, and hence on the overall economic and financial

condition of the Group.

37.7. Cash flow risk

Cash flow risk depends on fluctuations in the amount of future cash flows associated with a financial instrument. The

Group plans its cash flows and floating rate financial instruments are of a short-term nature of less than 1 year.

37.8. Credit rating

Credit rating of Bulgarian Energy Holding EAD

• Moody’s Rating Agency

On 27 November 2024, Moody's changed the credit outlook of Bulgarian Energy Holding EAD from positive to

stable, affirming the Group's long-term rating at Ba1 and the rating of the non-subordinated unsecured bond issues

placed by the Holding at Ba2. The outlook change to stable reflects the uncertainty arising from the planned

construction of the two new nuclear units at the NPP Kozloduy site, which would significantly increase Bulgarian

Energy Holding's risk profile given the inherent risks in the implementation of such a project.

• Fitch Ratings

On 20 March 2024, Fitch Ratings upgraded the outlook of Bulgarian Energy Holding EAD from stable to positive

and affirmed the issuer’s long-term foreign and local currency rating at ‘BB+’. The change in outlook is driven by the

company's improved business profile and increased profitability as a result of progress in the electricity market

liberalisation process.

• Environmental, social and governance (ESG) rating

For a public company actively involved in raising funds through capital markets, such as Bulgarian Energy Holding

EAD, attracting investor interest is associated with strict compliance with of social, governance and environmental

aspects of activities within the holding. The ESG rating is awarded after thorough analysis of the rules and policies of

a particular company, related to the ecological, social, and governance aspects; after assessing the overall impact and

environmental footprint left by the company through its business activities, as wel l as after a thorough review of the

available public information on the corporate website, articles, and news about the company.

The rating was awarded by Sustainalytics – a company within the Morningstar structure that is a world-renowned

provider of ESG research, ratings, and data. The corporate ESG assessment given to Bulgarian Energy Holding EAD

is a one-time assessment that is valid at the time of its assignment and it is prepared on the basis of the information

provided by Bulgarian Energy Holding EAD. The ESG risk assessment report includes a general ESG risk rating, an

assessment of the Company’s exposure and an assessment of its governance. Exposure refers to the extent to which

the Company is exposed to various material risks related to environmental, social, and governance aspects. The

governance assessment shows how well the Company manages these aspects.

As of 31 December 2024, BEH Group's ESG rating as determined by Sustainalytics is 35.5 points (“high risk”). BEH's

ESG Risk Score, which refers to the extent to which the company is exposed to various material risks related to

environmental, social, and governance aspects, is 53.8 points (“medium risk”). The governance score reflecting how

well the company manages these aspects is 36.8 points (“average performance”).
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
116
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Credit rating of Natsionalna Elektricheska Kompania EAD

On 5 September 2024, Standard & Poors upgraded NEK's outlook to positive from stable and affirmed the long -term

credit rating at ‘BB’. The upgraded outlook means that the company manages its funds and borrowings in a reliable

and balanced manner. The improved outlook represents a further step forward after the agency upgraded NEK's rating

from ‘BB-’ to ‘BB’ last year due to improved credit metrics.

38. Fair value measurement

The Group’s management groups assets and liabilities at fair value into three levels based on the significance of the

inputs used in determining the fair value of financial assets and liabilities. The fair value hierarchy includes the

following levels:

- Level 1: market prices (unadjusted) on active markets for identical assets or liabilities;

- Level 2: input other than market prices included in Level 1 that can be monitored in respect of an asset or liability

either directly (i.e. as prices) or indirectly (i.e. derived from prices); and

- Level 3: input for an asset or liability that is not based on observable market data.

An asset or liability is classified to the lowest level of significant input used to determine its fair value.

31 December 2024 Carrying amount Level 1 Level 3 Total:
BGN’000 BGN’000 BGN’000 BGN’000
Financial assets that are measured at fair value
Financial assets at fair value through other
comprehensive income, including:
Capital instruments 1,392 883 509 1,392
Financial assets that are not measured at fair value
Debt instruments at amortized cost
Non-current trade and other receivables 198 - 198 198
Current trade and other receivables 1,960,350 - 1,960,350 1,960,350
Receivables from related parties 613,609 - 613,609 613,609
Cash and cash equivalents 3,699,844 - 3,699,844 3,699,884
Financial assets 6,275,433 883 6,274,550 6,275,433
-
Financial liabilities that are not measured at fair value
Loans and financial leasing (3,439,427) - (3,439,427) (3,439,427)
Trade and other payables (1,350,902) - (1,350,902) (1,350,902)
Liabilities to related parties (827,214) - (827,214) (827,214)
Financial liabilities (5,617,543) - (5,617,543) (5,617,543)

Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
117
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
31 December 2023 Carrying amount Level 1 Level 3 Total
BGN’000 BGN’000 BGN’000 BGN’000
Financial assets that are measured at fair value
Financial assets at fair value through other comprehensive income, including:
Capital instruments 1,226 717 509 1,226
Financial assets that are not measured at fair value
Debt instruments at amortized cost
Non-current trade and other receivables 176 - 176 176
Current trade and other receivables 1,491,993 - 1,491,993 1,491,993
Receivables from related parties 413,825 - 413,825 413,825
Cash and cash equivalents 3,878,394 - 3,878,394 3,878,394
Financial assets 5,785,614 717 5,784,897 5,785,614
Financial liabilities that are not measured at fair value
Debt instruments at amortized cost
Loans and lease liabilities (3,529,040) - (3,529,040) (3,529,040)
Trade and other payables (1,161,663) - (1,161,663) (1,161,663)
Liabilities to related parties (1,037,342) - (1,037,342) (1,037,342)
Financial liabilities (5,728,045) - (5,728,045) (5,728,045)

38.1 Fair value measurement of financial instruments

Financial assets and liabilities measured at fair value in the consolidated statement of financial position are grouped

into the following categories according to the fair value hierarchy. For more information on exchange -traded shares,

see note 26.

38.2 Fair value measurement of non-financial assets

The following table presents the levels in the hierarchy of non-financial assets as of 31 December, measured

periodically at fair value:

Level 3 Level 3
2024 2023
BGN’000 BGN’000
Property, plant and equipment 16,506,819 15,103,328

The fair value of the majority of Group’s property, plant and equipment is determined on the basis of reports from

independent licensed appraisers (see note 19). The table presents the carrying amount of the assets for which the model

for subsequent measurement at fair value has been selected.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
118
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
39. Capital management policies and procedures

The policy of the Board of Directors is to maintain a strong capital base so as to maintain the trust of customers,

creditors and the market as a whole and to be able to provide conditions for business development in the future. The

aim of the of management is to maintain a balance between the higher returns that may be possible with the levels of

indebtedness and the benefits and security of a strong capital position. The Group’s objective is to achieve a return on

equity of over 5%. As of 31 December 2024, the return on equity was 1.23% (31 December 2023: (6.04%) There were

no changes in the Group’s capital management during the year.

40. Contingent assets, contingent liabilities, and commitments

40.1.Commitments under an agreement to provide natural gas regasification and transmission capacity

Pursuant ot an agreement signed on 30 December 2022 with BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş,

the Group, through its subsidiary Bulgargaz EAD, secures access to the regasification terminals of liquefied natural

gas in Turkey and its subsequent transfer to the territory of the Republic Bulgaria, with ensured flexibility of supplies

The period of the Agreement between Bulgargaz EAD and BOTAŞ is 01.04.2023 - 31.12.2035, and with Decision

No.26 as of 12.01.2023 the Council of Ministers of the Republic of Bulgaria approves the signed Agreement. The

Agreement provides for regasification and transmission capacity of natural gas to the interconnection point at the

border of the Republic of Turkey and the Republic of Bulgaria, Malkochlar/Strandzha 1, of up to 19,000,000 MWh

per year. It provides flexibility in receiving, storing and transferring quantities for the following year. This Agreement

is related to the diversification of sources and routes of supply, with the aim of achieving security of supply, dependent

on geopolitical processes to the minimum.

The difference in quantities between the LNG delivery capability and the subsequent transmission is to provide

flexibility in receiving the quantities of LNG delivered. With a delivery of 14 cargoes and the right to transport

14,000,000 MWh, this would mean no flexibility element for the Group through its subsidiary Bulgargaz EAD, as the

same quantity would need to be received each day in a given year in order to receive all the quantities delivered. By

negotiating the higher transmission capacity relative to the delivery capability, significant annual flexibility (estimated

at 28% of the total volume) is achieved in the acceptance of delivered quantities. It is management's judgment that

during the summer, when demand is lower, the quantities may not be taken in full, with the greater transfer capacity

allowing these not taken quantities to be taken up during the winter period, when demand is significantly higher. At

the same time, this also provides significant flexibility in requests on a daily basis (during the repair works on 26-27

September 2024, as a result of a capacity outage for only two days, the Group through its subsidiary Bulgargaz EAD

generated losses of over BGN 10,000 thousand). In addition, the flexibility enjoyed by the Group in ordering and

receiving quantities saves significant financial losses from selling quantities of natural gas below cost on the exchange

and/or as a positive imbalance to the transmission network operator, not only in the event of interruptions resulting

from repair work, but also in the event of non-drawdown by the Group's customers. Internal calculations for the period

January 2024 to March 2024, when supplies to customers are provided within the Agreement, are that a minimum of

BGN 30,000 thousand of losses are saved from selling below cost on the exchange market and/or as a positive

imbalance. In January 2025, through the Agreement with BOTAŞ, the required amount of gas was secured during the

winter month, after two consecutive accidents: first at the Shah Deniz platform, and then at the Alexandroupolis

terminal.

As of July 2024, the subsidiary Bulgargaz EAD has not paid its obligations under the monthly capacity invoices due

under the agreement with BOTAŞ and since the same date the two companies have been in active negotiations to

renegotiate the terms and conditions.

The management has made an analysis based on the available internal and external information and has come to the

conclusion that the agreement between Bulgargaz and BOTAŞ BORU HATLARI İLE PETROL TAŞIMA A.Ş should

not be treated as an onerous contract and a provision shall be provided due to the following reasons:

- This Agreement is related to diversification of sources and routes of supply, with the aim of achieving

security of supply, with minimal dependency on geopolitical processes;

- It guarantees continuity of supplies for Bulgarian consumers and to a much greater extent has a socially

significant rather than a commercial meaning;
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
119
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
- The agreement is for provision of services, and not for the supply of gas, and the price of the service under

it should be considered to include services such as flexibility in receiving, storing and transferring quantities

for the following year.

The results of the comparative analysis with similar agreements show that the latter do not include such services. In

similar agreements, such services are additionally negotiated with other users and merchants, which leads to additional

costs for fees, as well as the assumption and coverage of price risks for the Company from the transfer of quantities

from one period to another, which is also reflected in the fee when concluding such transactions.

Also, the volatility of natural gas prices in Europe and the world, which is due to the geopolitical uncertainties at the

moment, should also be taken into account. Proof of this is that when this Agreement was concluded, the fee for the

service was a low percentage of the price of natural gas and equal to similar services in the region without the

additional benefits that the Agreement provides.

In addition, the transit agreement between Russia and Ukraine expires at the end of 2024, leading to a shortage and

consequently increased demand for natural gas in the Central and Eastern European countries, Ukraine and Moldova.

Taking this fact into account, in the last quarter of 2024, the Group, through its subsidiary Bulgargaz EAD, finalized

the procedures for obtaining the right to participate in the natural gas markets in Romania, as well as a license to trade

natural gas in Hungary. In turn, this is a potential opportunity to realise the capacities reserved under the BOTAŞ

Agreement.

Due to the above circumstances, the management's judgment is that the agreement will not be treated as onerous

within the meaning of IAS 37 and there is no need to recognize a provision for liabilities.

40.2. Capital commitments

NPP Kozloduy EAD and its subsidiaries

As of 31 December 2024, the Group has capital commitments of BGN 291,066 thousand until the end of 2026,

including BGN 159,885 thousand for 2025 (31 December 2023: BGN 92,305 thousand) which are related to

commitments for acquisition of property, plant and equipment.

The Group has agreed commitments under a framework agreement with AO TVEL for the acquisition of nuclear fuel

until the end of 2025. At the time of preparation of these consolidated statements, the Group is in the process of

organizing the delivery of FNF in 2025, which also includes an advance payment in January and February 2025 in the

amount of BGN 196,986 thousand.

Pursuant to a decision of the National Assembly of the Republic of Bulgaria dated 09.11.2022 to speed up the process

of securing an alternative supplier of fresh nuclear fuel and in implementation of the NPP Kozloduy diversification

program agreed with the Supply Agency (ESA) at EVRATOM of the supply of FNF, in 2023, agreements for the

supply of FNF were signed with Framatom and Westinghouse, according to which in 2024 Westinghouse will deliver

FNF for BGN 116,296 thousand. In connection with these agreements, advances totalling BGN 189,872 thousand

have been made to two new suppliers as of 31 December 2024, which are expected to be drawn down by 2025 (31

December 2023: BGN 95,192 thousand).

Electricity System Operator EAD and its subsidiaries

In 2024, the Group concluded contracts under the Public Procurement Act, according to which contractual obligations

for 2024 in the amount of BGN 712,260 thousand arise.

In 2023, the Group concluded contracts under the Public Procurement Act, according to which contractual obligations

for 2023 in the amount of BGN 964,880 thousand arise.

Mini Maritsa-Iztok EAD

In connection with the implementation of its investment program as of 31.12.2024, the Company has undertaken

commitments under contracts for construction, supply and installation of machinery and equipment ensuring its

implementation.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
120
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
The company has contractual obligations for purchase of assets co-financed by the Innovation and Network Executive

Agency (INEA), Department C - Connecting Europe Facility.

As of 31 December 2024, Mini Maritsa Iztok EAD reports financing of fixed assets under contracts with contractor

companies as follows:

- Contract with Ref. No.MME / S Siemens EOOD for Rehabilitation of the main transformer stations and

construction of new mobile ones together with the adjacent switchgear and connecting equipment for

increasing the power supply from 6 kV to 20 kV for district 2 and district 3 for contract price EUR

12,557,535.97. 70% of the funding is provided by the European Bank for Reconstruction and Development

through the Kozloduy Fund and 30% of the funds come from Mini Maritsa Iztok EAD. The contract ended

on 31 December 2015.

- Contract with Ref. No.MME/A Risk Engineering AD for "Design, supply and installation of equipment and

facilities for online control of the load of belt conveyors and excavators in Mini Maritsa - Iztok EAD" for a

contract price of EUR 4,663,484.95. 70% of the funding is provided by the European Bank for Reconstruction

and Development through the Kozloduy Fund and 30% of the funds come from Mini Maritsa Iztok EAD.

The contract expired on 31 December 2016.

- Contract with Ref. No.MME/D (Lot A): “Design, supply and installation of facilities and equipment for

compensation of the reactive power of the heavy industrial mining equipment of Mini Maritsa-Iztok EAD,

Bulgaria”, with contractor Siemens EOOD, Bulgaria for contractual price o f EUR 951,954.13. 70% of the

funding is provided by the European Bank for Reconstruction and Development through the Kozloduy Fund

and 30% of the funds come from Mini Maritsa Iztok EAD. The contract is completed as of 31 December

2018.

- Contract with Ref. No.MME/D (Lot B): Rehabilitation (design, supply and installation) of industrial lighting

by replacement with LED lights in Mini Maritsa-East EAD, Bulgaria, with contractor ETRALUX, Spain for

a contractual price of EUR 2,446,767.04. 70% of the funding is provided by the European Bank for

Reconstruction and Development through the Kozloduy Fund and 30% of the funds come from Mini Maritsa

Iztok EAD. The contract was completed in August 2018.

- Contract with Ref. No.MME/BWE “Design, manufacture, supply, construction and commissioning of a

rotary excavator type SRs 2000 and a rotary excavator type SRs 200 in Mini Maritsa-Iztok EAD, with

contractor consortium FAMUR-BULGARIAN ENERGY, for contract price EUR 25,848,663.00 (with

Amendment 6 to the Contract of 15.07.2020, the price increases by EUR 208,720.27 and amounts to EUR

26,057,383.27). 50% of the funding is provided by the European Bank for Reconstruction and Development

through the Kozloduy Fund and 50% of the funds come from Mini Maritsa Iztok EAD. The contract was

signed on 20.05.2016 and started on 20.09.2016 (effective date for implementation). A certificate for

acceptance into operation of the excavator KWK 2000 was issued on 16.03.2020, and a certificate for

acceptance for operation of excavator KWK 400L was issued on 6.04.2020, with which the Contract was

implemented. The assets were reported in the balance of Mini Maritsa Iztok EAD. Amendment 6 to the

Contract of 15.07.2020 provides for the supply of recommended spare parts in the amount of EUR

208,720.27, which extends the implementation period by twelve weeks. The contract is closed as of

31.12.2022.

NEK EAD

NPP Belene project

The Company has agreed to report all amounts (paid and accrued) directly related to the terminated Belene NPP

project in accordance with the criteria for recognition of IAS 16 Property, Plant, and Equipment in compliance with a

consistent policy, such as property, plant and equipment assets. under construction, until a final decision on the future

of the project. Currently, there is uncertainty regarding the possible options for implementation of the project,

respectively, the equipment, and considerable amount of time is needed to agree, negotiate and approve possible

options, which is not entirely within the control of the Group’s management a nd it is not in a position to make

estimations on the possible reclassification of the amounts reported under IFRS, and regarding their assessment.

Investment projects of NEK EAD

The investment activity plan of NEK EAD is focused mainly on rehabilitation, reconstruction and new construction

of hydropower facilities and includes the following significant areas and capital projects.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
121
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
1. Yadenitsa Project

The project is included in the National Investment Plan (NIP) for the period 2013 - 2020 by a decision of the Council

of Ministers of the Republic of Bulgaria dated 28 September 2011, in connection with the Application filed by the

Republic of Bulgaria for a derogation under Article 10c of Directive 2003/87/EC of the European Commission (EC).

By decision No.707 dated 30 August 2012 of the Council of Ministers of the Republic of Bulgaria, Yadenitsa Dam,

which is the main facility of Yadenitsa Project, was de clared a “national site” pursuant to the State Property Act, as

well as “a site of national significance” pursuant to the Spatial Development Act.

Yadenitsa Project has secured funding for the preparatory works (procedures until a Construction Permit is obtained)

from the Connecting Europe Facility fund of the European Commission.

On 24 April 2015, the Grant Agreement signed by and between NEK EAD and the Innovation and Networks Executive

Agency at the European Commission entered into force. According to this agreement, the funds allocated to

Natsionalna Elektricheska Kompania EAD amounted to EUR 3,213 thousand. They will cover 50% of the costs for

the renewal of the EIA, design and obtaining a permit for construction of Yadenitsa Dam. The remaining 50% is the

company own funds.

All necessary preliminary activities required to obtain a construction permit are assigned with the agreement. The

company has a valid EIA decision, a valid detailed development plan, approved investment projects and a valid

construction permit No.RS-3/20.01.2023 issued by the Minister of Regional Development and Public Works.

Work is being done to resolve issues related to specific and detailed conservation objectives for 4 protected areas from

the Natura 2000 ecological network, in accordance with the requirements of the European Commission and

determination of measures to achieve their conservation goals. The same is bound with the restoration of the status of

the project, i.e. a project of general interest for the EU, which is directly bound with the possibility of securing credits

by setting a collateral (mortgage) for attracted financing.

2. Rehabilitation of the hydro power complex "Belmeken - Sestrimo - Chaira" and rehabilitation of the 110 kv

switchyard of HPP Vacha-1 and part of the systems of HPPs under common control "

The project is funded by the International Fund for Decommissioning of Units 1-4 of NPP Kozloduy (KIDSF -

Kozloduy International Decommissioning Support Fund). A Grant Agreement - GRANT 049B has been signed with

the European Bank for Reconstruction and Development (EBRD).

The total budget of the project is EUR 37 million (excluding consultancy services), 70% of which are financed by

KIDSF, and 30% by NEK EAD. The consultancy services amounting to EUR 300 thousand are entirely financed by

KIDSF.

Three rehabilitation contracts have been signed under the project, two have been completed and the third for the

rehabilitation of the Chaira UGH is currently under implementation.

Contract No.GA049A-2А/ 25.04.2019 Rehabilitation of Chaira Pumped Storage Hydro Power Plant, with

contractor: Consortium ABB AG & VOITH HYDRO GmbH & Co. KG. A building permit has been issued for the

site, effective as of 25.02.2020. Three of the four stages of the project are being implemented. The installation works

on the first two stages have been completed. On hydro unit (HU) 4 (stage 1), activities have been suspended due to an

event that occurred during water sampling on 22 March 2022, when cracks appeared on part of the static parts of the

turbine. In 2023, a report was prepared by an internationally recognized organization on the root cause of the HU4

incident of 22 March 2024. Stage 2 (Unit 3) is fully completed, with conducted ‘dry’ tests. The water samples after

additional modification of the HU3 turbine. Stage III is in the process of being rehabilitated, and additional surveys

of the condition of the turbine spiral case have been assigned. A comprehensive contract amendment was executed on

22 December 2023. The scope of the new contract includes a modification of the stators of Unit2 an d a 72-hour test

run of the machine by 31 December 2024, which occurred on 23 December 2024. An amendment to the contract and

the inclusion of Unit3 for a modification of the stator columns, similar to Unit2, is underway.

Contract No.GA049A-3/18.05.2018 Rehabilitation of Belmeken Pumped Storage Hydro Power Plant, HPP

Sestrimo and HPP Momina Klisura, with contractor: Consortium KONČAR KET – ČKD BLANSKO – RUDIS.

Contract value: EUR 19,997,642.45. Construction permits have been issued for all three stations, and are in force from

17 January 2019.

The stages of the project are fully completed, as in the reporting year the last stages were completed as follows:
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
122
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
− First stage for Momina Klisura HPP – Unit 2 put into regular operation after issuance of a Permit for Use on

23.02.2021.

− Second stage for Momina Klisura HPP – Unit 1 put into regular operation after issuance of a Permit for Use on

27.04.2023.

− First stage for pumped-storage hydropower plant (PSHPP) Belmeken – Unit 3 and Unit 4 put into regular

operation after issuance of the Permit for Use on 25 August 2022;

− Second stage for PSHPP Belmeken – Unit 1 and Unit 2 put into regular operation after issuance of the permit

for use on 27 April 2023;

− First stage for HPP Sestrimo – Unit 2 put into regular operation after issuance of the permit for use on 25

August 2022;

− Third stage for PSHPP Belmeken – Unit 5 put into regular operation after issuance of a permit for use on 29

May 2024;

− Second stage for HPP Sestrimo – Unit 1 put into regular operation after issuance of a permit for use on 29 May

2024.

3. Project for increasing the volume of the lower equalizer of the Chaira pumped-storage hydropower plant

The project aims to increase the volume of the lower equalizer of the Chaira PSHPP through the construction of

Jadenitsa dam and a reversible pressure tunnel for connection between the dam. Chaira and the new Yadenitsa Dam.

The project has been granted a construction permit since early 2023. At present, the EIA assessment procedure is

ongoing and subsequently the objectives for the affected Natura 2000 sites have been prepared. An analysis has been

submitted to the MoEW to confirm that the prepared EIA meets the prepared objectives for the sites. The project is

then due to reapply for ‘General Interest’ project status. No funding has been secured at this time and this is being

worked on with a first step of confirming the objectives to the affected Natura sites.

New PSHPP Project

NEK has a technical assistance agreement with the EIB through which a feasibility study is being carried out for two

new PSHPPs. A first stage of feasibility studies with concepts for the new PSHPPs has been prepared. A second phase

is about to start, which will develop the feasibility studies in detail with field surveys and environmental assessment.

40.3. Contingent liabilities

Significant lawsuits and claims

TPP Maritsa Iztok 2 EAD

The Association “For the Land-Access to Justice” has filed an appeal under the Environmental Protection Act against

Decision No.50-NO-IO-A5 of 21.12.2018 for updating the Complex Permit No.50/2005 of TPP Maritsa East 2 EAD

for the operation of the Combustion Plant for Electricity Production and Hydrogen Production Plant and Landfill for

Inert, Construction, Hazardous and Non-Hazardous Waste. Since 2019, there have been continuous court cases which

have not been concluded with a final court decision.

By Decision No.50-H0-I0-A5/2018 on the update of Complex Permit No.50/2005 of TPP Maritsa East 2 EAD (the

Decision), derogation from the BAT emission standards established by the Conclusion was granted.

The issued Decision has been appealed by the association “For the Earth - Access to Justice”, registered in the register

for legal entities under the file No.No 195/2016 of the Sofia City Court, with registered office in Sofia. An

administrative case was initiated under No.751/2019 according to the inventory of Sofia City Administrative Court.

Based on an objection to jurisdiction by the company and Executive Environment Agency (ExEA), Adm. case

No.751/2019 according to the inventory of Sofia City Administrative Court was terminated and sent under the

jurisdiction of Stara Zagora Administrative Court, where Adm. case No.225/2019 according to the inventory of the

same court was initiated.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
123
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
At the request of TPP Maritsa East 2 EAD, with Decision No.252/17 June 2019 under Adm. case No.225/2019 of

Stara Zagora Administrative Court, preliminary implementation was allowed of Decision No.50-H0-И0-А5/2018 of

21 December 2018 for updating complex permit No.50/2005 of TPP Maritsa East 2 EAD in Kovachevo village.

By Decision No.358/28.08.2020, rendered in Administrative Case No.225/2019 of the Administrative Court - Stara

Zagora, the appeal of Association “For the Earth - Access to Justice” was rejected as unfounded and Decision No.50-

H0-I0-A5/ 21.12.2018 for update of complex permit No.50/2005 of TPP Maritsa East 2 EAD was upheld.

Decision No.358/28.08.2020 of Stara Zagora Administrative Court has been appealed by the association “For the

Earth - Access to Justice” before the Supreme Administrative Court, and Аdm. case No.239/2021 was initiated.

The Supreme Administrative Court returned the case for a new hearing by the Administrative Court - Stara Zagora

with Decision No.8230/31.07.2023. The case lasted more than 2 calendar years.

After the return of the case to another chamber, a second first instance administrative case No.20237240700478/2023

was opened before the Administrative Court - Stara Zagora. The court ruled with Decision No.918 of 15.03.2024,

which annuls Decision No.50-Н0-ИО-А5/21.12.2018 of the Executive Agency's Directorate. The decision was

appealed in court before the Supreme Administrative Court Decision No.918 of 15.03.2024 of the Administrative

Court - Stara Zagora, IV Chamber, in administrative case No.20237240700478/2023.

On 2 April 2024, through Stara Zagora Administrative Court, a cassation appeal was filed by TPP Maritsa East 2 EAD

with the Supreme Administrative Court under the rules of the Administrative Procedure Code against Decision No.918

of 15 March 2024, issued under administrative case No.20237240700478/2023 of Stara Zagora Administrative Court.

Administrative case No.6479/2024 has been opened. A private complaint has been filed by "THE GREEN TANK -

NON-PROFIT CIVIL ASSOCIATION" and Georgios Anastasios Paschalidis against the above-mentioned court

decision.

The company has submitted a written response ref. No.15982/10.05.2024 through the Administrative Court - Stara

Zagora to the Supreme Administrative Court against the private complaint.

On 22 October 2024, the Supreme Administrative Court issued a protocol ruling in administrative case No.6479/2024,

terminating the proceedings before it and returning the case to the Administrative Court - Stara Zagora for correction

of obvious factual errors made by the court that issued the judgment appealed before the Supreme Administrative

Court. The case is sent by the Supreme Administrative Court to the panel of the Administrative Court - Stara Zagora,

which issued decision No.918 of 15.03.2024 on administrative case No.478/2023 on the court's list for conducting

proceedings under Art. 175 of the Administrative Procedure Code, in accordance with the reasons for the ruling issued.

By Decision No.3405 of 07.11.2024 in administrative case No.20237240700478/2023 of the Administrative Court -

Stara Zagora, a correction of a clear factual error in the reasons for Decision No.918/15.03.2024, issued in

administrative case No.478/2023, was made.

Decision No.3405/07.11.2024 of the Administrative Court - Stara Zagora is subject to appeal before the Supreme

Administrative Court within 14 days of its service on the parties. The decision was delivered to TPP Maritsa East 2

EAD with a notification with entry No.No.39389/11.11.2024

The case was returned by the Administrative Court, Stara Zagora to the Supreme Administrative Court, where it was

opened with a new number, administrative case No.46/2025, and by notice dated 19.03.2025, the company, through

its procedural representative, was summoned to appear as a cassation judge in the case with the Association "For the

Earth - Access to Justice".

From this moment on, various procedural deadlines begin to run, such as:

• The Supreme Administrative Court shall issue a decision within one month of the session in which the

consideration of the case was concluded.

• The Supreme Administrative Court has various powers after hearing the case. It shall uphold the appealed

decision or annul it in the contested part if it is incorrect.

• When the Supreme Administrative Court upholds the decision, it motivates it, and may also refer to the

reasons of the court of first instance.

• When the decision is inadmissible, the Supreme Administrative Court invalidates it in the contested part by

terminating the case, returning it for a new hearing or referring it to the competent court or authority.

• When the decision is null and void, the Supreme Administrative Court declares its nullity in its entirety and,

if the case is not subject to termination, returns it to the court of first instance for a new decision.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
124
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
When it overturns the decision, the Supreme Administrative Court decides the case on the merits. Since the case is

characterized by significant factual and legal complexity, the volume of information, including the collected evidence,

which forms part of the administrative file, is significant in volume and the study will require additional time and

commitment than usual for this, it can be assumed that several court hearings will be necessary until the case is

completed.

Due to all of the above, it can be reasonably assumed that the case will last for at least a period of 1 calendar year.

In the event that the appealed decision of the Administrative Court - Stara Zagora is confirmed by the Supreme

Administrative Court, the Environmental Agency should conduct a procedure for reviewing the Comprehensive

Permit of "TPP Maritsa East 2" EAD.

If the appealed decision of the Administrative Court - Stara Zagora is confirmed by the Supreme Administrative Court,

until the comprehensive permit is reviewed by the Environmental Environmental Agency, the power plant should

operate at the specified standards for the degree of desulfurization until the granted derogation is issued. With regard

to the sulfur dioxide indicator, the implementation of the activities set out in the Investment Program of the plant for

alignment with Implementing Decision (EU) 2021/2326 of 30 November 2021 on the formulation of conclusions on

best available techniques (BAT) for large combustion plants and the achieved annual average values reported by the

automatic systems for own continuous measurements (SMI) in 2023 give reason to assume that TPP Maritsa Iztok 2

EAD could also operate in the application of BAT for the indicated indicator.

In the event that the appealed decision of the AC - Stara Zagora is overturned by the SAC, and the appeal of "For

Land Access to Justice" is rejected as unfounded and unproven, the company will operate under the terms of the

derogation granted to it.

TPP Maritsa Iztok 2 EAD has sufficient grounds to believe that Decision No.50-Н0-ИО-А5/21.12.2018 of ExEA’s

ED, that has been suspended with Decision No.918 of 15 March 2024 of Stara Zagora Administrative Court, Chamber

IV, in administrative case No.20237240700478/2023, does not exhibit the indicated faults of substantive law and

should remain in force.

Pursuant to ruling No.252/17.06.2019, issued under Adm. case No.225/2019 of Stara Zagora Administrative Court,

which allowed preliminary implementation of Decision No.50-H0-I0-A5/2018 of 21.12.2018 for updating complex

permit No.50/2005 of TPP Maritsa East 2 EAD in Kovachevo village, the Company may continue to operate until the

dispute is finally resolved with an effective court decision.

Natsionalna Electricheska Kompania EAD

Energy Financial Group AD - in bankruptcy

Energy Finance Group AD (EFG) has filed a lawsuit with a principal amount of BGN 2,346 thousand and interest for

delay with claims for payment of a transferred receivable from Worley Parsons New Clear Services to EFG for

consulting services.

The claims were rejected by a final judicial act of the Supreme Court of Cassation. A request was filed by the EGF to

annul the decision that had entered into force pursuant to Article 307 of the Civil Procedure Code and by decision of

the Supreme Court of Cassation the request was dismissed. The decision is not subject to appeal and the legal

proceedings are closed.

Mechel Carbon AG (currently renamed Tayvaz A Group AG)

Mechel Carbon AG has filed a lawsuit before the Sofia City Court with a principal amount of BGN 21,4 thousand and

interest for delay. The claims are for payment of principals for electricity supplied by Toplofikatsia Ruse EAD, paid

by NEK EAD to Toplofikacia Ruse EAD as a pledgor instead of the one determined by Mechel Carbon AG as a

pledged depositary creditor after receiving a notice of commencement of execution from Mechel Carbon AG by the

order of the PPA together with interest and expenses. The Sofia City Court upheld the claims, and NEK EAD filed an

appeal against the conviction before the Sofia Court of Appeal.

By a decision of the Sofia Court of Appeal, the first-instance decision of the Sofia City Court was overturned and the

claims were dismissed. The case is pending.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
125
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Haos Invest-1 EAD

Haos Invest-1 EAD EAD has filed five cases before the Sofia City Court against NEK EAD with claims for payment

of amounts for purchased electricity in 2018 for principal amounts in the amount of BGN 3,447 thousand with VAT

principal and interest for late payment.

In one of the cases with a principal amount of BGN 2,117 thousand, the claims were rejected at first instance, but the

proceedings have not been completed.

In the second case, with a principal amount of BGN 836 thousand, the claims were upheld by a decision of the Sofia

City Court. NEK EAD filed an appeal with the Sofia Court of Appeal and by a decision of the Sofia Court of Appeal,

the decision of the Sofia City Court was overturned and the claims were dismissed. The case is closed.

Ritam-4-TB OOD and Vidachim AD

Ritam-4-TB OOD and Vidachim AD have filed a case before the Sofia City Court against NEK EAD for compensation

for non-performance of a contractual obligation by NEK EAD and a tort claim for compensation for damages suffered

on a non-contractual basis under Art. 49, in connection with Art. 45 of the Obligations and Contracts Act (OCA) under

contingency conditions. The claims were filed as partial for the amount of BGN 1,000 thousand of the total amounts

claimed as due by NEK EAD in the amount of BGN 48,000 thousand for unredeemed amount of electricity. The

proceedings in the case have been divided and two cases have been opened before the Sofia City Court - for breach

of contract and for tortious liability. In the first case for breach of contract, the claim was rejected and the ruling has

entered into force. In the second case - for non-contractual liability for tort with a total claim amount of BGN 33,331

thousand, a decision was issued by the Sofia City Court to dismiss it. The first instance decision was a ppealed by the

plaintiffs before the Court of Appeals-Sofia, the case was considered and announced for resolution.

As of 31 December 2024, other claims have been filed against the Company on various legal grounds: for delivered

electricity, for unredeemed electricity, lost profits, unjust enrichment and delayed payments, and others. The

proceedings on these claims have not ended with final court decisions. Due to this circumstance, the management of

the Company has decided not to charge additional provisions on lawsuits.

NPP Kozloduy EAD and its subsidiaries

Legal claims in the amount of BGN 808 thousand have been filed against the Group. (31 December 2023: BGN 4,963

thousand). None of the above claims are set out in detail here so as not to seriously affect Group’s position in resolving

disputes.

Bulgargaz EAD

On the basis of a preliminary agreement for reserving capacity, in 2019 an agreement for the transportation of natural

gas was concluded with ICGB AD.

In connection with this agreement, a corporate guarantee was issued in favor of ICGB AD by Bulgarian Energy

Holding EAD in the amount of EUR 16,102 thousand with a term until 22 December 2028.

40.4. Contingent assets

Bulgargaz EAD

In connection with a commercial dispute from previous periods, Bulgargaz EAD has filed a claim for the return of

natural gas to fill the Transit 1 gas pipeline against the Romanian company Transgaz S.A. An arbitration case

No.78/2019 has been initiated before the International Commercial Arbitration Court of the Romanian Chamber of

Commerce and Industry. By a decision of 9 December 2021, Transgaz was ordered to refund the amount of gas or its

monetary equivalent of USD 923 thousand, together with interest and costs. Transgaz's request to suspend execution

was rejected, and the amount was paid to Bulgargaz EAD on 9 March 2022.

The Bucharest Court of Appeal rejected the appeal to annul the arbitration award, but Transgaz appealed to the

Supreme Court, which overturned the decision of the Court of Appeal and remanded the case for retrial.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
126
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
It was impaired in 2021 due to the limited access to natural gas — the subject of the dispute in the Transit 1 gas

pipeline. The compensation received under the judgments ruled so far has been recognized as other liabilities until the

final settlement of the commercial dispute between the parties.

As of 31 December 2024, in favor of Bulgargaz EAD, there are established bank guarantees from commercial

customers in the amount of BGN 43 million. (31 December 2023: BGN 43 million). The bank guarantees are in

accordance with the terms of the commercial contracts for the supply and sale of natural gas with the customers.

Bulgartransgaz EAD

The Group reports as a contingent asset or contingent liability an operational balancing account (OBA). This is a joint

account in which the daily balance position of two Transmission System Operators at the point of interconnection is

recorded. The operator responsible for calculating the daily balance sheet item and the total balance sheet item,

respectively, shall update the OBA on a daily basis and send it to the other operator. The operational balancing account

is reported off-balance sheet.

Mini Maritsa-Iztok EAD

At a plenary sitting of the National Assembly on 25 April 2024, a decision was taken obliging the Council of Ministers,

through the Minister of Finance and the Minister of Energy, to take all necessary actions, in compliance with the

applicable Bulgarian and Community legislation, to secure from the state budget funds for Mini Maritsa-Iztok EAD

in the amount of BGN 250,000 per year for a period of four years (2024 -2028) in order to provide for technical

reclamation of the disturbed areas of the East Maritza coal basin. The funds will be provided exclusively on the

condition that the reclamation activities will carried out only by Mini Maritsa-Iztok EAD, and it is not allowed to

assign or subcontract the activities to private companies and/or companies with state or municipal participation.

40.5. Other

Natsionalna Electricheska Kompania EAD

Long-term power purchase agreements

On 13 June 2001, NEK EAD signed a long-term - 15-year contract with Consolidated Continental Commerce Limited,

currently AES - 3C Maritsa Iztok 1 EOOD (AES) for the purchase of electricity. The contract has become effective

in stages as from the commissioning date of the new facility on 2 June 2011 and upon the achievement of the full net

capacity of 600 MW by TPP AES Galabovo as of 28 December 2011. On 14 August 2015 an agreement was concluded

for the reduction of the availability price by 14%, which is effective as from 26 April 2016, after the payment of the

obligations to the power plant. Accordingly, NEK EAD has committed itself not to fall into arrears to the power plant

in the future. If this condition is not met by the company, the agreed reduction will not be applied until the overdue

amounts are repaid by NEK EAD to the power plant.

Pursuant to a special pledge agreement dated November 30, 2005 and an agreement amending the special pledge

agreement dated April 26, 2016, NEK EAD has pledged its receivables for electricity sold from EVN Bulgaria

Elektrosnabdyavane EAD and Energo-Pro Sales AD as a guarantee against future electricity purchase obligations.

The amount of pledged receivables is equal to the expected maximum total payment for purchased electricity for any

month of the calendar year.

In accordance with the concluded long-term power purchase agreement, NEK EAD is required to purchase a minimum

of 3,156,500 MWh electricity per calendar year (or on a pro rata basis in the event of an incomplete year) and the

availability agreed according to a trading plan.

On 13 June 2001 NEK EAD concluded a long-term fifteen-year contract for electricity and availability purchases with

Energiyna Kompania Maritsa Iztok 3 AD, currently ContourGlobal Maritsa Iztok 3 АД AD. The contract entered into

force in February 2009 upon completion of the agreed rehabilitation activities for the modernization of the existing

TPP Maritsa Iztok 3, after which the installed capacity is 808 MW.

Pursuant to a special pledge agreement dated 1 February 2002 and the latest agreement to amend the special pledge

agreement dated 26 April 2016, NEK EAD has pledged its receivables for electricity sold from Electrohold Sales

EAD, Energo-Pro Sales AD, as a guarantee against future obligations to purchase electricity. The sum of the pledged
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
127
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
receivables is 1.25 times as much as the expected maximum total payment for electricity purchased for any month of

the calendar year.

In February 2024, the long-term power purchase agreement with ContourGlobal Maritsa Iztok 3 AD expired.

In pursuance of the contract for purchase of electricity and availability, Natsionalna Elektricheska Kompania EAD

annually issues promissory notes in favour of Contour Global Maritsa Iztok 3 AD. In accordance with the concluded

long-term power purchase agreement, NEK EAD is required to purchase minimum 3,489,000 MWh electricity per

calendar year (or on a pro rata basis in the event of an incomplete year) and the base availability.

As of 26 April 2016, agreements came into force to reduce the availability price by 15% of ContourGlobal Maritsa

Iztok 3 and by 14% of AES - 3C Maritsa Iztok I EOOD, after payment of the obligations of NEK EAD to both power

plants. Accordingly, NEK EAD has committed itself not to fall into arrears to power plants in the future.

The table below shows the obligations of NEK EAD regarding the minimum due payments for purchased electricity

and availability for the remaining term of the concluded long-term contracts for purchase of energy from the power

plants.

Total Minimum Amount Due thousand BGN
Minimum payments due for purchased availability* 458,390
Minimum payments due for purchased electricity ** 1,179,535
Total 1,637,925

* The indicated amount is the minimum due according to the concluded long-term contracts for energy purchase

and is formed on the basis of set fixed pricing elements and elements with fixed escalation.

The minimum payments for purchased availability under each of the long-term contracts for the purchase of electricity

from power plants are as follows:

Up to 1 years From 1 to 5 years Total
BGN’000 BGN’000 BGN’000
Minimum payments for purchased availability 458,390 - 458,390

In 2024, NEK EAD purchased net electricity in the amount of 499 GWh from ContourGlobal Maritsa Iztok 3 AD.

The PPAs between the power plant and NEK expired on 20.02.2024.

1,929 GWh of net electricity was purchased from AES Maritsa East 1, which is significantly below the mandatory

minimum amount of electricity to be purchased in the PPAs of 3,156 GWh. In connection with a claim presented to

the Company for the unpurchased minimum amounts of energy, a provision in the amount of BGN 3,997 thousand

was recognized.

As required under the Renewable Energy Source Act, NEK EAD in its capacity of public supplier, was required until

24 July 2015 to purchase the entire quantity of electricity produced from renewable or alternative energy sources, with

the exception of electricity produced from hydro power plants with an installed capacity of over 10 MW. With the

amendment of Art. 31(5) of the same act, the Public Supplier and the end suppliers, respectively, shall purchase the

electricity output from renewable sources at a preferential price for the volume of electricity up to the amount of the

net specific generation of electricity which is taken into account when calculating the preferential prices in the relevant

decisions of EWRC. The amounts of electricity in excess of the net specific generation are purchased at a price of

surplus on the balancing market or as stipulated in Art. 31, para. 12 may be sold on the free market. The obligatory

purchase of electricity is carried out under purchase contracts. According to the Renewable Energy Act, amended on

3 May 2011,the duration of the contracts shall be 20 years for electricity produced from geothermal and solar energy

plants and for electricity produced from biomass, 12 years for electricity produced from wind energy and 15 years for

electricity produced from hydro power plants with an installed capacity of up to 10 MW, as well as for electricity

produced from other types of renewable energy sources. The time limits for mandatory purchase shall commence on

the date of commissioning of the power facility and for power facilities commissioned after 31 December 2015 – the
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
128
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
time limits shall be reduced by the time between that date and the date of commissioning of the respective power

facility.

From 1 July 2021, in accordance with the last two price decisions of the EWRC for the regulatory periods 2023 - 2024

and 2024 - 2025, NEK EAD purchases electricity from RES only with an installed capacity of less than 500 kW.

As of 31 December 2024, NEK EAD has no long-term contracts for the purchase of RES.

Estimates with respect to Irrigation Systems EAD

NEK EAD and Irrigation Systems EAD carry out operations related to the maintenance and operation of water

reservoirs, dam walls, hydro engineering, and hydro-meliorative facilities in compliance with their obligations to

supply water as determined by the Ministry of Environment and Water. NEK EAD, through the company "Dams and

Cascades", provided the "water supply" service to "Irrigation Systems" EAD, a similar service was provided by

"Irrigation Systems" EAD to NEK EAD.

No agreement has been reached between the Company and "Irrigation Systems" EAD, as no protocols have been

signed for the quantities of water supplied for the period from May 2003 to the date of issue of these financial

statements, which is why additional obligations to "Irrigation Systems" EAD may arise, which cannot be reliably

determined at this time.

In this regard, an agreement has been concluded between NEK EAD and "Irrigation Systems" EAD, by which both

parties have declared that each of them provides the "water supply" service to the other party. The agreement provides

for the signing of contracts to regulate the rights and obligations of each party related to the provision of the water

supply service. Meetings were held and correspondence was maintained.

Currently, no signed contract between both companies are available.

Mini Maritsa-Iztok EAD

Concession contract commitments

Pursuant to a concession agreement for the development and extraction of coal, Mini Maritsa Iztok EAD undertakes

to set aside funds in favor of the Ministry of Energy, which can be used only for the purpose for which they are

intended (types of work for the final departure of the concession area) and after explicit permission of the Ministry of

Energy. The company should annually deposit into trust accounts in the amount of BGN 4,385 thousand, approved

by the Ministry of Energy, with an annex concluded in October 2019.

With letters from March and June 2022 to the Minister of Energy, Mini Maritsa Iztok EAD proposes a change in the

contracts for opening trust bank accounts, namely to increase the annual contribution to BGN 9,246 thousand. The

proposed contribution includes:

- the current contribution in the amount of BGN 4,385 thousand;

- the unpaid amounts until 2021, deferred until 2036, in the amount of BGN 4,861 thousand.

According to a letter from the Ministry of Energy with Ref. No.E –26 –M-163/25.05.2022, the liability of Mini Maritsa

Iztok EAD under the Leaving Fund is rescheduled until 2036 according to the proposed debt repayment scheme.

Under the concluded contract TO 212/13.10.2023 with the subject Opening and servicing of a trust bank account

Departure Fund with Investbank AD, a trust bank account Departure Fund was opened.

According to Art. 31 of the concluded concession contract, the Concessionaire shall submit to the Grantor a bank

guarantee for the current year in the amount of 30% of the calculated concession fee. For 2024, the amount of the

guarantee should be BGN 2,036 thousand.

In the first quarter of 2024, a procedure was launched to issue a bank guarantee securing the mining under the

concession contract for 2024 with Ref. No.10/2024. It has been terminated on the basis of Art. 110, para. 1, item 1 of

the Civil Code. The deadline for submitting bids has been extended, and again no bids have been submitted. As of the

date of preparation of the report, the procedure has been terminated. A new procedure is about to be launched,

according to the approved Schedule for awarding contracts to Mini Maritsa-Iztok EAD for 2025.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
129
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
To date, the company has not allocated funds to a trust guarantee account and has not issued a bank guarantee in favor

of the grantor, securing the activities under the contract.

40.6. Insurances

NPP Kozloduy EAD and its subsidiaries

The Safe Use of Nuclear Energy Act sets a limit on the liability of the operator for damages caused by nuclear

accidents. The Act limits the operator‘s liability up to BGN 96,000 thousand for each accident. According to Vienna

Convention on Civil Liability for Nuclear Damage, the operator is required to maintain insurance or other financial

guarantee for nuclear damage during the operation period of the nuclear facility. The Group has concluded an

insurance policy covering the limits regulated by law on 1 August 2020 with the Bulgarian National Nuclear Insurance

Pool with a one-year coverage period from 1 August 2023 to 31 July 2024. The insured amount is BGN 913 thousand,

of which BGN 895 thousand is insurance premium and BGN 18 thousand is tax on the premium.

On 22 July 2024, a new contract was concluded with the Bulgarian National Nuclear Insurance Pool with a one -year

coverage period from 1 August 2024 to 31 July 2025. The insured amount is BGN 943 thousand, of which BGN 925

thousand is insurance premium and BGN 18 thousand is tax on the premium. The Group has concluded an industrial

fire property insurance policy with OZK-Insurance AD with a coverage period from 1 January 2024 to 31 December

2024, and the sum insured is BGN 13,880 thousand. (2023: BGN 13,293 thousand).

40.7. Guarantees

NPP Kozloduy EAD and its subsidiaries

Bank guarantees and cash collateral in the amount of BGN 28,314 thousand have been opened in favor of the Group

as of December 31, 2024 (December 31, 2023: BGN 32,190 thousand).

Bulgartransgaz ЕАD and its subsidiary

Bank guarantees and insurance policies from third parties in the amount of BGN 510,944 thousand have been issued

in favor of the Group. (2023: BGN 165,838 thousand).

On 1 July 2019, a corporate guarantee was issued in favor of the Group under a Capacity Reservation Agreement in

the amount of BGN 1,085,313 thousand by a foreign legal entity.

Bulgargaz EAD

Pursuant to a contract concluded in 2020 with a banking institution, the company was granted a credit product in the

form of an issued bank guarantee in favor of a supplier of natural gas. The term is renewed periodically, every six

months, and at the last reference – until 11.08.2025 and the amount of US 140,362 thousand.

Based on a contract concluded in 2022 with a banking institution, the company was provided with a credit product in

the form of an issued bank guarantee in favor of a supplier – with a term until 30.11.2025. In February 2025, the bank

guarantee was released, while the limit of the credit product was preserved.

40.8. Promissory note

Natsionalna Electricheska Kompania EAD

As of 31 December 2024, NEK EAD has no promissory notes issued. For 2023, NEK EAD has issued promissory

notes in the amount of BGN 219,156 thousand to ContourGlobal Maritsa Iztok 3 AD.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
130
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
41. Balance of debt arising from financing activities with the amounts disclosed in the consolidated statement

of cash flows

Liabilities arising from financial activities Carrying amount as of 1 January 2024 Cash flows from financial activities Non-monetary changes - uncertificated Increases / Carrying amount as of 31 December 2024
Proceeds Payments (decreases)
BGN’000 BGN’000 BGN’000 BGN’000 BGN’000
Bonds issue 2,376,953 - (69,823) 71,241 2,378,371
Bank loans 1,149,308 758,073 (906,085) 56,544 1,057,840
Leasing 2,779 - (1,136) 1,573 3,216
Total loans and leasing (note 29) 3,529,040 758,073 (977,044) 129,358 3,439,427
Total loans received from the
Ministry of Energy (note 34) 822,942 - (38,384) 16,331 800,889
822,942 - (38,384) 16,331 800,889
Total liabilities from financing activities 4,351,982 758,073 (1,015,428) 145,689 4,240,316

Liabilities arising from financial activities Carrying amount by 1 January 2023 Cash flows from financial activities Proceeds Payments Non-monetary changes – cashless Carrying amount by 31 December 2023
thousand BGN thousand BGN thousand BGN thousand BGN thousand BGN
Bonds issue 2,375,579 - - 1,374 2,376,953
Bank loans 1,286,814 153,764 (291,472) 202 1,149,308
Leasing 1,604 - (1,255) 2,430 2,779
Total loans and leasing (note 29) 3,663,997 153,764 (292,727) 4,006 3,529,040
Total loans received from the Ministry of Energy (note 34) 806,085 - - 16,857 822,942
Total liabilities from financing activities 4,470,082 153.764 (292,727) 20,867 4,351,986

42. Events after the reporting period

No adjusting events or significant non-adjusting events have occurred since the date of the reporting period to the date

of approval of the consolidated financial statements for publication, except for the following non-adjusting events:

Amendments to the Accountancy Act

In February 2025, the National Assembly adopted amendments to the Accountancy Act aimed at postponing the

requirements for non-financial reporting by enterprises by one year. The amendments were promulgated in the State

Gazette, issue 17 of 28.02.2025. Initially, according to European Directive 2022/2464, enterprises with over 500

employees had to submit non-financial sustainability reports for 2024. With the new amendments, this deadline has

been extended by one year, with the first submission of such reports being for 2025. The amendments aim to facilitate

the transition and adaptation of enterprises by reducing the risk of inaccuracies and improving the quality of reports.

Target contributions to the Security of the Electricity System Fund

With § 2, para. 1 of the Final Provisions of the Law on the Collection of Revenues and the Execution of Expenditures

in 2025, until the adoption of the Law on the State Budget of the Republic of Bulgaria for 2025, the mechanism for

collecting targeted contributions to the Security of the Electricity System Fund has been extended. The targeted

contribution represents the positive difference between the market revenues and the determined revenue ceiling for

the respective type of producer, with a delivery period from 1 January 2025 to 31 December 2025.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
131
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Changes in the Energy Act

With the adopted on second reading on May 16, 2025 amendments of the Energy Act from the National Assembly of

the Republic of Bulgaria, which are expected to be promulgated in the State Gazette, the current model of functioning

of the electricity market in our country is changing. The change provides for full liberalization of the wholesale

electricity market from 01.07.2025, while keeping household consumers on a regulated market. It is envisaged that

the final suppliers will supply the final household customers, and a new mechanism (segment) of IBEX EAD will be

created to ensure the necessary quantities of electricity. This segment will be open to all sellers (i.e. electricity

producers and traders) and will include a newly created non-standard product (traded on an organized exchange

market) that will be tailored to the specific consumption profile of end suppliers. The model envisages NEK EAD

acting as a coordinator of a balancing group, which will have the opportunity to offer electricity to the specially created

new market mechanism.

Determination of a revenue ceiling for electricity producers for the period 1 July – 31 December 2025

By Decision of the Council of Ministers No.380 of 28 May 2025, the values (in BG per MWh) used to calculate the

revenue ceiling for the respective type of electricity producer under § 2, para. 1 of the Final Provisions of the Act on

the Collection of Revenues and the Execution of Expenditures in 2025 until the adoption of the Act on the State

Budget of the Republic of Bulgaria for 2025, the Act on the State Social Security Budget for 2025 and the Act on the

Budget of the National Health Insurance Fund for 2025 are determined for the period 1 July 2025 - 31 December

2025, as follows:

a) for a producer of electricity from a nuclear power plant – 120 BGN per MWh;

b) for electricity from hydro power plants owned by the NEK EAD – 140 BGN per MWh;

c) for a producer of electricity from a coal-fired condensing power plant, including lignite coal – 400 BGN, increased

by the average monthly price per ton of CO2 emission allowances multiplied by 1.32, for one MWh;

d) for a producer of electricity from coal with added biomass fuel (solid or gaseous biomass fuels) and/or waste, and/or

petroleum products, and/or a combination thereof – 400 BGN, increased by the average monthly price per ton of CO2

emission allowances multiplied by 0.9, for one MWh;

e) for a producer of electricity from renewable sources without a contract for compensation with premiums – 300

BGN per MWh.

Bulgarian Energy Holding EAD

Change in the Management Bodies of Bulgarian Energy Holding EAD

By a protocol decision of 7 February 2025 of the Minister of Energy Galina Tsvetanova Todorova was released as a

member of the Board of Directors of Bulgarian Energy Holding EAD and Diyan Atanasov Ivanov was elected in her

place until a new tender procedure is held. The change was entered in the Commercial Register and the Register of

Non-Profit Legal Entities on 13 February 2025.

By a protocol decision of May 16, 2025, the Minister of Energy released Veselina Lachezarova Kanatova-Buchkova

as Chairperson of the Board of Directors of Bulgarian Energy Holding EAD and Vasil Georgiev Stoynov was elected

in her place until a new competition procedure is conducted. The change was entered in the Commercial Register and

the Register of Non-Profit Legal Entities on 22 May 2025.

Credit rating of Bulgarian Energy Holding EAD

On 17 March 2025, Fitch Ratings revised the outlook on Bulgarian Energy Holding EAD's long-term rating (BB+) to

stable from positive and affirmed the rating on its non-subordinated and unsecured debt at BB+. The outlook revision

reflects the expected increase in leverage and high capital expenditure associated with the construction of the new

nuclear units.

Decisions on the establishment and payment to the state of profit deductions from state-owned enterprises and

commercial companies with state participation in capital

The Council of Ministers (CoM), by Order No.1 of 2 May 2025, has determined that state-owned enterprises and

commercial companies with state participation in the capital, with the exception of hospitals, mental health centers

and companies in the Water Supply and Sewerage sector, shall distribute a dividend for the financial year 2024, in

compliance with the requirements of Art. 247a of the Commercial Act, after deducting the deductions for the Reserve
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
132
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
fund, when this fund is not replenished, in accordance with Art. 101 of the State Budget Act of the Republic of

Bulgaria for 2025 - 100 percent.

Pursuant to the Order, Bulgarian Energy Holding EAD shall distribute and pay a 6 -month (interim) dividend based

on the adopted 6-month financial statements as of 30 June 2025 in the amount of 100 percent of the reported profit,

subject to the relevant application of Article 247a of the Commercial Law.

Natsionalna Elektricheska Kompania EAD

Change in the management of Natsionalna Elektricheska Kompania EAD

On 7 March 2025, Georgi Georgiev Dobrev was listed as a member of the Board of Directors and Executive Director

and replaced Martin Ivanov Georgiev.

On 20 March 2025, Nadya Georgieva Stefanova was listed as a member of the Board of Directors and replaced

Aleksandar Yulianov Rusanov.

TPP Maritsa Iztok 2 EAD

Determining a revenue ceiling for an electricity producer

By Decision of the Council of Ministers No.121/05.03.2025 on determining the values used to calculate the revenue

ceiling for a producer of electricity from a coal-fired condensing power plant, including lignite, the amount of BGN

300, increased by the average monthly price per ton of СО 2 emission allowances multiplied by 1.32, for one MWh,

was determined.

NPP Kozloduy EAD

Additional quantities of electricity from NPP Kozloduy EAD for purchase from the public supplier

Decision No.Ц-3/01.01.2025 of the EWRC amended the estimated monthly availability for the production of

electricity of the producers from whom the public supplier should purchase electricity, and the quantities of electricity

that the public supplier should provide to cover the consumption of the customers of the end suppliers, as determined

by Decision No.Ц-17/30.06.2024 for the period 01.07.2024 - 30.06.2025. As of 01.01.2025, additional quantities of

electricity from Kozloduy NPP EAD in the amount of 400,000 MWh have been determined, whereby the quota for

the regulated market determined for the period 01.07.2024 - 30.06.2025 changes from 5,431,200 MWh to 5,831,200

MWh, while maintaining the current regulated price of 65.47 BGN/MWh.

Set a revenue ceiling for a producer type

By Decision of the Council of Ministers No.121/05.03.2025, a revenue ceiling for the type of producer NPP was set

at 150 BGN/MWh for the period from 01.01.2025 to 31.12.2025. The same, according to item 2 of the decree, may

be changed if necessary upon a proposal by the Minister of Energy.

Diversifying of fresh nuclear fuel

In accordance with the terms of Addendum 52 to the contract with AO TVEL, two deliveries of fresh nuclear fuel

were made. On 25 March 2025, the first delivery of 42 TVSA-12 cartridges and 12 pcs. of PP SUS (absorbing rods

for control and protection systems), and on 23 April 23 2025, the second delivery of 42 TVSA-12 cartridges was

made. On 10 April 2025, 42 RWFA nuclear fuel assemblies manufactured by Westinghouse Electric Sweden AB were

delivered.

Bulgargaz EAD

Extension of the term of a bank guarantee

Pursuant to a contract concluded in 2020 with a banking institution, the company was granted a credit product in the

form of an issued bank guarantee in favor of a supplier of natural gas. The term is renewed periodically, every six

months, and in the last reference - a term until August 11, 2025 and an amount of USD 140,362 thousand.

Release of bank guarantee

On 28 January 2025, the LNG terminal near Alexandroupolis stopped operating due to a technical failure. The operator

of the terminal Gastrade S.A. was unable to set a date from which the terminal is expected to resume operations.

Therefore, Bulgargaz EAD requested the release of the bank guarantee in the amount of EUR 48,679 thousand, which

maintains credit protection in favor of Gastrade S.A.
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
133
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Conclusion of overdraft agreements by banking institutions

To secure natural gas supplies in January and February 2025, Bulgargaz EAD withdrew overdrafts from banking

institutions, guaranteed by BEH EAD, with a total limit of BGN 220 million.

Mini Maritsa-Iztok EAD

Change in the Board of Directors of Mini Maritsa-iztok EAD

According to minutes No.13-2025 of February 20, 2025, a decision was made at a meeting of the Board of Directors

of Mini Maritsa-Iztok EAD to change the composition of the Board of Directors. Stelian Koev was released as a

member and Tihomir Tenev was elected in his place. The change was entered in the Commercial Register and the

Register of Non-Profit Legal Entities on 7 March 2025.

Bulgartransgaz EAD

Additional increase in the subordinated bond loan provided by each shareholder in the capital of Gastrade S.A.

In accordance with decisions of the Management and Supervisory Boards, on 13.02.2025, Bulgartransgaz EAD

transferred from the Company's account at the National Bank of Greece, on which a pledge was established, EUR

2,910 thousand for an additional increase in the subordinated bond loan provided by each shareholder.

Change in the Management and Supervisory Board of Bulgartransgaz EAD

By its decision of 17 January 2025, the Supervisory Board of Bulgartransgaz EAD elected Vladimir Malinov as a

member of the Management Board of the gas transmission operator. The decision of the Supervisory Board was

approved by the Energy and Water Regulatory Commission on 23.01.2025. As of 29.01.2025, Vladimir Malinov has

been entered as the Executive Director of Bulgartransgaz EAD in the Commercial Register and the Register of Non-

Profit Legal Entities, replacing Kiril Ravnachki.

As of 25 March 2025, Ekaterina Mihaylova, who replaces Alexander Kanazirski, is entered in the Commercial

Register and the Register of Non-Profit Legal Entities as a member of the Supervisory Board of Bulgartransgaz EAD.

Change in the Audit Committee of Bulgartransgaz EAD

By its decision of April 3, 2025, the Board of Directors of Bulgarian Energy Holding EAD dismissed Silvia Todorova

as a member of the Audit Committee of Bulgartransgaz EAD and elected Lilyana Dragieva as a member of the Audit

Committee as of April 3, 2025, with the mandate of the remaining members.

Change in the Board of Directors of Gas Hub Balkan EAD

According to the decision of the Board of Directors of Gas Hub Balkan EAD of January 29, 2025, Vladimir Malinov

was elected as a member of the Board of Directors, and Darina Koleva was released as a member of the Board of

Directors of Gas Hub Balkan EAD. These circumstances were entered in the Commercial Register and the Register

of Non-Profit Legal Entities on 4 February 2025.

Early repayment of loan agreements with banking institutions

On 8 April 2025, a loan agreement concluded in 2021 with UniCredit Bulbank AD in the amount of EUR 20,000

thousand was repaid early.

On 11 April 2025, a loan agreement concluded in 2021 with Investbank AD in the amount of EUR 10,333 thousand

was repaid early.

Conclusion of annexes to loan and collateral contracts

In accordance with decisions taken by the Management and Supervisory Boards of Bulgartransgaz EAD, annexes to

concluded loan and collateral agreements have been signed with:

"United Bulgarian Bank" AD - Annex No.3 dated 24.04.2025 to the 2020 loan agreement, which reduces the loan

interest rate from EURIBOR+1.75% to EURIBOR+1.40%

"DSK Bank" AD - Annex No.4 dated 17.04.2025 to the 2020 loan agreement, which reduces the loan interest rate

from 1M EURIBOR+1.65% to 1M EURIBOR+1.39%

"DSK Bank" AD - Annex No.4 dated 17.04.2025 to the 2021 loan agreement, which reduces the loan interest rate

from 1M EURIBOR+1.65% to 1M EURIBOR+1.39%
Bulgarian Energy Holding EAD
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
For the year ending 31 December 2024
134
This document is a translation of the original Bulgarian text, in case of divergence the Bulgarian text shall prevail.
Citibank Europe AD - Annex No.1 dated 17.04.2025 to the 2021 loan agreement, which reduces the loan interest rate

from the APR+1.70% to the APR+1.40%

"Targovska Banka D" AD - Annex No.3 dated 24.04.2025 under a loan agreement from 2021, by which the interest

rate on the loan is reduced from 1M EURIBOR+1.75% to 1M EURIBOR+1.20% and a change in the interest rate

under the collateral agreement from 0.01% to SOFR - 0.40%.

Electricity System Operator EAD

Change in electricity prices by decision of the EWRC

EWRC opened a procedure for amending the electricity pricesapproved by Decision No.Ц-17 of 30.06.2024 and from

01.01.2025 by Decision No.Ts-3/01.01.2025 approved new prices for electricity. With the new pricing decision, the

Regulator changes the estimated market price for base load determined by ESO EAD for the period 01.01.2025 -

30.06.2025 from 178.64 BGN/MWh to 219.01 BGN/MWh, or an increase of 22.6%. The increased amount of the

approved costs for the purchase of technological losses leads to a change in the pricing elements forming the

transmission price, which changes from 12.70 BGN/MWh to 13.66 BGN/MWh according to Decision No.Ts-

3/01.01.2025. The remaining parameters and prices for ESO EAD, approved by Decision No.Ц-17/30.06.2024, remain

unchanged.

Memorandum of Support and Cooperation

On 20 March 2025, a Memorandum of Support and Cooperation was signed between ESO EAD, Bulgarian

Development Bank EAD, National Association of Municipalities in Bulgaria and the Association of Bulgarian

Employers' Organizations, with which the parties declare their readiness for joint cooperation to promote a Mechanism

for financing activities for optimizing electricity consumption costs in municipal companies, public enterprises,

private legal entities, etc. The Mechanism will be implemented by ESO Charge EAD through several methods,

including the construction of production capacities from renewable sources on rooftops, storage facilities, energy

arbitrage, with financing from Bulgarian Development Bank EAD and their payment through contracts for guaranteed

results for clients.

National Energy Operator EAD

Change in the management of National Energy Operator EAD

By decisions of Minutes No.16-2025/28.02.2025 of the Board of Directors of Bulgarian Energy Holding EAD, Georgi

Georgiev Dobrev was released as a member of the Board of Directors of National Energy Operator EAD and the

management contract was terminated, without release from liability. Said Haisam Hamameh was elected in his place

for a period from the date of entry of the decision in the Commercial Register and the Register of Non-Profit Legal

Entities until a new competition procedure is conducted. The change was entered in the Commercial Register and the

Register of Non-Profit Legal Entities on 7 March 2025.

43. Approval of the consolidated financial statements

These consolidated financial statements as of 31 December 2024 (including comparative information) were approved

by the Board of Directors of BEH EAD on 29 May 2025.
1
INDEPENDENT AUDITORS’ REPORT
To the sole shareholder of
Bulgarian Energy Holding EAD
Sofia, 16 Veslets Str.
Report on the Audit of the Consolidated Financial Statements
Qualified opinion
We have audited the consolidated financial statements of Bulgarian Energy Holding EAD and its subsidiaries (the
Group), which comprise the consolidated statement of financial position as at 31 December 2024 and the consolidated
statement of profit or loss, the consolidated statement of comprehensive income, the consolidated statement of
changes in equity and the consolidated statement of cash flows, for the year then ended, and notes to the consolidated
financial statements, comprising material accounting policy information and other explanatory information.
In our opinion, except for the possible effect of the matters described in the “Basis for Qualified Opinion” section of our
report, the accompanying consolidated financial statements give a true and fair view of the consolidated financial
position of the Group as at 31 December 2024 and of its consolidated financial performance and its consolidated cash
flows for the year then ended in accordance with IFRS Accounting Standards, as adopted by the EU and Bulgarian
legislation.
Basis for Qualified Opinion
1. As disclosed in Note 19 “Property, plant and equipment” to the consolidated financial statements, the Group owns
property, plant and equipment related to Belene NPP project for the construction of a nuclear power plant by the
subsidiary Natsionalna Elektricheska Kompania EAD (NEK EAD). As of 31 December 2024, their carrying amount
includes assets under construction of BGN 2,497,991 thousand and other fixed assets of BGN 71,826 thousand. In
accordance with its accounting policy, the Group capitalizes all costs directly related to the project in the value of assets
under construction until the final decision on the project’s future development. By a decision of the National Assembly
of the Republic of Bulgaria dated 6 July 2023, the Minister of Energy of Republic of Bulgaria was assigned to negotiate
with the Minister of Energy of Ukraine for the sale of the long-cycle production equipment (LCPD) intended for Belene
NPP Project for a price not lower than EUR 601,617 thousand (BGN 1,176,661 thousand). The equipment is a key
asset to the construction of Belene NPP Project. The remaining assets under construction related to this project consist
mainly of capitalised costs with carrying amount of BGN 1,313,053 thousand, as well as other items of property, plant
and equipment of BGN 71,826 thousand. Decision № 708 of the Council of Ministers of 12 October 2023 repeals
Decision № 447 of the Council of Ministers of 2018 (in connection with Decisions of the Council of Ministers № 250 of
2012 and № 259 of 2005) on designating an energy facility "Nuclear Power Plant at the Belene Site" as a facility of
national importance and Decision № 260 of the Council of Ministers. The deadline for the negotiations assigned to the
Minister of Energy under the previous decision was extended by 180 days until 10 March 2025, and after the
negotiations are completed, the Minister must submit a report to the National Assembly for a decision on the sale of
the long-cycle production equipment owned by Natsionalna Elektricheska Kompania EAD, intended for the Belene NPP
Project. As of the date of this report, the Group does not have information on the development of the negotiations and
whether they have been completed. As of 31 December 2024, the Group is not able to estimate reliably the value of
the recognized assets related to Belene NPP construction project, and accordingly, no impairment losses on non-
current assets in accordance with IAS 36 “Impairment of Assets” have been recognized in the consolidated financial
statements, as well as no provisions for potential future obligations of the Group under IAS 37 “Provisions, Contingent
Assets and Contingent Liabilities” were recorded. Consequently, we were unable to obtain sufficient appropriate audit
evidence regarding the recoverable amount of the Group’s assets and the completeness of the recognized liabilities
related to this project. Accordingly, we were unable to determine the amount of the necessary adjustments and their
impact on the Group’s consolidated financial statements as of 31 December 2024.
2. As disclosed in Note 19 “Property, Plant and Equipment” and Note 40 “Contingent Assets, Contingent Liabilities and
Commitments” to the consolidated financial statements, the subsidiary NEK EAD owns a pumped storage hydroelectric
power plant (PSHP) “Chaira” with a carrying amount of BGN 554,984 thousand as of 31 December 2024. Following an
incident in March 2022 during a test load after the rehabilitation of one of the four turbines (XA4), this power plant
stopped operating. As of the reporting date, the Group is in a procedure under Bulgarian Public Procurement Act for
the replacement of the entire equipment of hydro units (XA4) and (XA1) of PSHP “Chaira”. Currently, the rehabilitation
of hydro unit (XA2) has been completed and the hydroelectric power plant was put into operation on 23 December
2024, working with partial capacity. As of 31 December 2024, the Group performed impairment testing of PSHP “Chaira”
using a financial model to determine its value in use by applying the discounted cash flows method. The financial model
is based on future economic benefits from the four hydro units of PSHP “Chaira”, without taking into account the scope,
timing and cost of possible rehabilitation activities necessary for resuming the operation of the facility in its full capacity.
Due to these circumstances, we were unable to obtain sufficient appropriate audit evidence about the recoverable
amount of PSHP “Chaira” as a cash-generating unit, and accordingly, whether and to what extent adjustments would
2
be necessary to its recoverable amount as of 31 December 2024 and, respectively, to the results of operations for 2024
in the Group’s consolidated statement of profit or loss.
3. As stated in Note 19 “Property, Plant and Equipment” to the consolidated financial statements, as of 31 December
2024, the Group has revalued its property, plant and equipment based on an assessment of their fair values by an
independent licensed appraiser. As a result of this revaluation, the subsidiary Mini Maritsa - Iztok EAD has recorded a
net increase of BGN 140,004 thousand in the value of property, plant and equipment and also extension of the useful
life of some of its items of property, plant and equipment. There is uncertainty regarding the time horizon for the
continuation of its lignite mining and land restoration activities. Consequently, we were unable to obtain sufficient
appropriate audit evidence about the recoverable amount of these assets, as well as whether and to what extent any
adjustments to their value are necessary as of 31 December 2024, and also any adjustments to the results from its
operations for 2024 in Group’s consolidated statement of profit or loss.
4. As disclosed in Note 23 “Trade and other receivables” , as of 31 December 2024, Group’s advances to suppliers
consist mainly of advances of BGN 456,017 thousand, which were provided by the subsidiary Bulgargaz EAD to a
natural gas supplier. The Group has not estimated the recoverable amount of these prepaid advances in accordance
with the requirements of the applicable accounting standards. The results of our audit procedures indicate that if a
consistent approach had been used to determine the recoverable amount of the advances for natural gas based on its
selling price, the Group would have recognized additional expenses of BGN 173,350 thousand for 2024. Accordingly,
the net profit for 2024 would have decreased by BGN 156,015 thousand, after deducting the related temporary tax
differences of BGN 17,335 thousand.
5. As disclosed in Note 25 "Inventories" to the consolidated financial statements, the carrying amount of Group's natural
gas as of 31 December 2024 is BGN 496,008 thousand. The natural gas owned by the subsidiary Bulgargaz EAD is
BGN 305,968 thousand. In preparing the assessment related to the determination of the net realizable value of the
natural gas owned by Bulgargaz EAD, an expected selling price of natural gas for January 2025 was used (European
index TTF Front month, used as a reference price quotation, published in an Argus Media bulletin on 31 December
2024), but this price was applied only to some of the available quantity, which is planned to be realized by the end of
2025 according to the Emergency Action Plan. As a result, the total carrying amount of this natural gas as of 31
December 2024 consists of natural gas valued at the lower of cost and net realisable value of BGN 41,834 thousand
and natural gas valued at cost of BGN 264,134 thousand. We were unable to obtain sufficient appropriate audit
evidence that the method applied for determining the net realizable value and the corresponding calculation of the
impairment loss for natural gas comply with the requirements of IAS 2 “Inventories”. If the Group had applied a
consistent approach for determining the net realizable value of the entire available quantity of natural gas as of 31
December 2024, this value would have been lower by BGN 80,002 thousand than its carrying amount, and the
impairment charges for 2024 would have increased by the same amount. Accordingly, the net profit for 2024 would
decrease by BGN 72,002 thousand, after deducting the relevant temporary tax differences of BGN 8,000 thousand.
6. As of 31 December 2024, the inventories presented in Note 25 "Inventories" of the consolidated financial statements
include spare parts and consumables, basic and other materials of the subsidiary Mini Maritsa - Iztok EAD with a
carrying amount of BGN 93,403 thousand, of which more than 30% have not been used for a period of three years, as
well as spare parts and specific spare equipment belonging to the subsidiary NPP Kozloduy EAD, with a carrying
amount of BGN 152,102 thousand, of which inventories not used with carrying amount of BGN 124,957 thousand. Due
to the specific nature of the inventories described above, we were unable to obtain sufficient appropriate audit evidence
regarding the carrying amount of these materials, supplies and spare parts and whether it does not exceed their net
realizable value in accordance with the requirements of IAS 2 “Inventories”. Accordingly, we were unable to determine
whether adjustments are necessary to their carrying amount in the Group’s consolidated statement of financial position
as of 31 December 2024 and, respectively, in the results of its operations for the year ended on that date in the
consolidated statement of profit or loss.
7. As disclosed in Note 40 “Contingent assets, Contingent Liabilities and Commitments”, at the end of 2022 the
subsidiary Bulgargaz EAD entered into a long-term agreement with BOTAŞ BORU HATLARI İLE PETROL TAŞIMA
A.Ş for access to the LNG regasification terminals in Turkey and its subsequent transmission to the territory of the
Republic of Bulgaria for a period of 13 years. Note 8 “Carrying value of natural gas, electricity and other current assets
sold” discloses that as part of the performance of the contract in 2024 the Group recorded costs for unused capacity at
the Strandzha1/Malkochlar entry point of BGN 266,943 thousand (for 2023: BGN 72,926 thousand), which essentially
represents an unused but paid service. Note 40.1 “Commitments under an agreement for the provision of capacity for
regasification and transmission of natural gas” discloses information on the estimates and assumptions of the Group’s
management regarding the accounting treatment of the operation, performance and expected development and
implementation of the agreement. In addition, as of July 2024, the subsidiary Bulgargaz EAD has ceased payment of
its obligations arising from the monthly capacity invoices issued by the supplier in accordance with the terms of the
agreement. Based on Group’s management’s analysis of all available internal and external information, a conclusion
was reached that this agreement does not constitute an onerous contract within the meaning of IAS 37 “Provisions,
Contingent Liabilities and Contingent Assets”.
According to IAS 37 “Provisions, Contingent Assets and Contingent Liabilities”, this contract has the characteristics of
“onerous contract”, because the costs that cannot be avoided in fulfilling the obligations under the contract exceed the
3
economic benefits that are expected to be received under the contract. Accordingly, the current obligations under such
a contract are required to be recognized and measured as a provision for an onerous contract. As a result of the audit
procedures performed by us, we were unable to obtain sufficient and appropriate audit evidence that the estimates and
assumptions of Group’s management for not treating the contract as onerous are reasonable and adequately reflect
the complexity and special nature of the contract, including the effect of possible events that could arise beyond the
control of management and affect the performance of the agreement. Due to the numerous assumptions and
uncertainties regarding future events, we were unable to obtain sufficient certainty as to the extent to which this contract
will be utilized by the end of its term. Accordingly, we were unable to determine the amount of the adjustments
necessary to the carrying amount of the provisions as of 31 December 2024 and the prior reportin g period and to the
expenses for provisions for onerous contracts for 2024 and the prior reporting year.
8. As disclosed in Note 4.27 “Provisions” to the consolidated financial statements as of 31 December 2024, Group’s
specific activities, as well as the applicable regulatory framework, require the Group to prepare an estimate of expected
future costs for decommissioning of the nuclear facilities, belonging to the subsidiary NPP Kozloduy EAD. The Group’s
management is not able to reliably estimate the subsidiary’s obligations and therefore no provision for decommissioning
of nuclear facilities has been recognized. Accordingly, we were not able to determine the amount of any additional
provisions required in the event that an assessment and estimate were prepared in accordance with the requirements
of the applicable legislation and IAS 37 “Provisions, Contingent Liabilities and Contingent Assets” and these were taken
into account in the preparation of the accompanying Group’s consolidated financial statements as of 31 December
2024.
We conducted our audit in accordance with International Standards on Auditing (ISAs). Our responsibilities under those
standards are further described in the “ Auditors’ Responsibilities for the Audit of the Consolidated Financial Statements”
section of our report. We are independent of the Group in accordance with the International Code of Ethics for
Professional Accountants (including International Independent Standards) issued by the International Ethics Standards
Board for Accountants (IESBA Code) , together with the ethical requirements of Bulgarian Independent Financial Audit
and Assurance of Sustainability Reporting Act, and we have fulfilled our other responsibilities in accordance with these
requirements. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for
our qualified opinion.
Emphasis of Matter
We draw attention to Note 19 “Property, Plant and Equipment” to the consolidated financial statements, which discloses
that as of 31 December 2024, the Group, through its subsidiary NEK EAD, operates properties and facilities with a
carrying amount of BGN 838,417 thousand, which are declared public state property under Bulgarian Water Act.
According to the requirements of this Act, the functions of management and maintenance of the dam walls and their
facilities should be performed by a dam wall operator, and this function has not been assigned to NEK EAD by the
competent authorities. As of the date of these consolidated financial statements, there has been no change in the
regulatory framework for the ownership and operation of the specified assets. Our opinion is not modified in respect of
this matter.
We draw attention to Note 19 “Property, Plant and Equipment” to the Group’s consolidated financial statements, which
discloses information about an asset under construction (Gorna Arda cascade project) with a carrying amount of
BGN 24,513 thousand as of 31 December 2024. Gorna Arda cascade project is suspended and without secured
financing for completion. The project is included in the Strategic Vision for the Development of the Energy Sector 2023-
2053 of the Ministry of Energy, published in January 2023. The Group has determined the recoverable amo unt of this
asset under construction based on the potential opportunities set out in the Strategic Vision for the Development of the
Energy Sector 2023-2053 and the actions taken by the subsidiary NEK EAD, which are based on significant judgments,
assumptions and uncertain future events. Our opinion is not modified in respect of this matter.
We draw attention to Note 4.27 “Provisions” to the consolidated financial statements, which discloses information on
the updated strategy for the management of spent nuclear fuel and radioactive waste, prepared in accordance with EU
Directive 2011/70/Euratom and in implementation of Art. 74 of the Law on the Safe Use of Nuclear Energy (SUNE) and
the by-laws. The strategy represents the national program of the Republic of Bulgaria for the responsible and safe
management of spent nuclear fuel and radioactive waste, which provides for procedures for the preparation and
coordination of documents related to the determination of the quantity, characteristics and terms of the returned high -
level waste. Due to the complex geopolitical situation resulting from the military conflict on the territory of Ukraine, the
subsidiary NPP Kozloduy EAD is unable to take effective actions to implement the procedures related to the return of
vitrified high-level waste to the country. Our opinion is not modified in respect of this matter.
We draw attention to Note 40 “Contingent assets, contingent liabilities and commitments”, which describes the Group’s
commitments under a concession agreement for coal development and extraction concluded by the subsidiary Mini
Maritsa-Iztok EAD. The obligation to financially secure the costs for land restoration of the concession area is realized
by setting aside funds in special guarantee accounts, which can be used solely for the purpose for which they are
intended. As of 31 December 2024, Mini Maritsa-Iztok EAD has no funds set aside in a trust guarantee account and
has not issued a bank guarantee in favour of the concession grantor, securing the activities under the contract. Our
opinion is not modified in respect of this matter.
4
Key Audit Matters
Key audit matters are those matters that, in our professional judgment, were of most significance in our audit of the
consolidated financial statements for the current period. These matters were addressed in the context of our audit of
the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate
opinion on these matters. In addition to the matters described in the “Basis for Qualified Opinion” section , we have
determined the there are no additional key audit matters to be communicated in our report.
Information Other than the Consolidated Financial Statements and Auditors ’ Report Thereon
Management is responsible for the other information. The other information comprises the annual consolidated
management report, including the consolidated nonfinancial information, the consolidated corporate governance
statement, and the consolidated report on payments to governments, prepared in accordance with Bulgarian
Accountancy Act and other applicable legislation requirements, but does not include the consolidated financial
statements and our auditors’ report thereon.
Our opinion on the consolidated financial statements does not cover the other information and we do not express any
form of assurance conclusion thereon. In connection with our audit of the consolidated financial statements, our
responsibility is to read the other information and, in doing so, consider whether the other information is materially
inconsistent with the consolidated financial statements or whether our knowledge obtained in the audit may indicate
that there is a material misstatement or otherwise the other information appears to be materially misstated. If, based
on the work we have performed, we conclude that there is a material misstatement of this other information, we are
required to report that fact.
As described in the section “Basis for Qualified Opinion” above, we were unable to obtain sufficient appropriate audit
evidence about the matters described in this section. Consequently, we were unable to determine whether the other
information is materially misstated with regard to these matters.
Responsibilities of Management and Those Charged with Governance for the Consolidated Financial
Statements
Management is responsible for the preparation and fair presentation of the consolidated financial statements in
accordance with IFRS Accounting Standards, as adopted by the EU and Bulgarian legislation, and for such internal
control as management determines is necessary to enable the preparation of consolidated financial statements that
are free from material misstatement, whether due to fraud or error.
In preparing the consolidated financial statements, management is responsible for assessing the Group’s ability to
continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern
basis of accounting unless management either intends to liquidate the Group or to cease operations, or has no realistic
alternative but to do so.
Those charged with governance are responsible for overseeing the Group’s financial reporting process.
Auditors’ Responsibilities for the Audit of the Consolidated Financial Statements
Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are
free from material misstatement, whether due to fraud or error, and to issue an auditors ’ report that includes our opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with
ISAs and Bulgarian Independent Financial Audit and Assurance of Sustainability Reporting Act will always detect a
material misstatement when it exists. Misstatements can arise from fraud or error and are considered material if,
individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken
on the basis of these consolidated financial statements.
As part of our audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism
throughout the audit. We also:
− identify and assess the risks of material misstatement of the consolidated financial statements, whether due to
fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is
sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement
resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional
omissions, misrepresentations, or the override of internal control;
− obtain an understanding of internal control relevant to the audit in order to design audit procedures that are
appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the
Group’s internal control;
− evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and
related disclosures made by management;
− conclude on the appropriateness of management’s use of the going concern basis of accounting and, based on
the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast
5
significant doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty
exists, we are required to draw attention in our auditors ’ report to the related disclosures in the consolidated
financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on
the audit evidence obtained up to the date of our auditors’ report. However, future events or conditions may cause
the Group to cease to continue as a going concern;
− evaluate the overall presentation, structure and content of the consolidated financial statements, including the
disclosures, and whether the consolidated financial statements represent the underlying transactions and events
in a manner that achieves fair presentation;
− plan and perform the group audit to obtain sufficient appropriate audit evidence regarding the financial information
of the entities or business units within the group as a basis for forming an opinion on the group financial
statements. We are responsible for the direction, supervision and review of the audit work performed for purposes
of the group audit. We remain solely responsible for our audit opinion.
We communicate with those charged with governance regarding, among other matters, the planned scope and timing
of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during
our audit.
We also provide those charged with governance with a statement that we have complied with relevant ethical
requirements regarding independence, and to communicate with them all relationships and other matters that may
reasonably be thought to bear on our independence, and where applicable, related safeguards.
From the matters communicated with those charged with governance, we determine those matters that were of most
significance in the audit of the consolidated financial statements of the current period and are therefore the key audit
matters. We describe these matters in our auditors’ report unless law or regulation precludes public disclosure about
the matter or when, in extremely rare circumstances, we determine that a matter should not be communicated in our
report because the adverse consequences of doing so would reasonably be expected to outweigh the public interest
benefits of such communication.
We are jointly liable for the performance of our joint audit and the issued joint auditors’ opinion in accordance with the
requirements of Bulgarian Independent Financial Audit and Assurance of Sustainability Reporting Act. Upon
acceptance and performance of the joint audit engagement on which we report, we have complied with the “Guidelines
on performance of joint audit“ issued on 13.06.2017 by Bulgarian Institute of Certified Public Accountants and Bulgarian
Commission for Public Oversight of Statutory Auditors.
Report on Other Legal and Regulatory Requirements
In addition to our responsibilities for reporting under ISAs, described above in section “Information Other than the
Consolidated Financial Statements and Auditors ’ Report Thereon”, regarding the annual consolidated management
report, including the consolidated nonfinancial information, the consolidated corporate governance statement, and the
consolidated report on payments to governments, we have performed the additional procedures contained in the
Guidelines of the professional organisation of certified public accountants and registered auditors in Bulgaria - Institute
of Certified Public Accountants (ICPA). The procedures on the existence, form and contents of the other information
have been carried out in order to state whether the other information includes the elements and disclosures in
accordance with Chapter Seven of Bulgarian Accountancy Act and Bulgarian Public Offering of Securities Act (Article
100m, paragraph (10) in relation to Article 100m, paragraph (8), subparagraphs (3) and (4) of Bulgarian Public Offering
of Securities Act) .
Statement Pursuant to Article 37, Paragraph (6) of Bulgarian Accountancy Act
Based on the procedures performed, we describe the outcome of our work:
(a) the information in the consolidated management report is consistent with the consolidated financial
statements for the same reporting period, on which we have issued qualified opinion in the section “Report
on the Audit of the Consolidated Financial Statem ents” above;
(b) the consolidated management report is prepared in accordance with the applicable legal requirements;
(c) as a result of the acquired knowledge and understanding of the activities of the Group and the environment
in which it operates, we have found no cases of material misrepresentation in the consolidated management
report, except for the possible effect of the matters described in section “Information Other than the
Consolidated Financial Statements and Auditors’ Report Thereon” of “Report on the Audit of the Consolidated
Financial Statements”;
(d) the consolidated corporate governance statement for the financial year contains the required information in
accordance with the applicable legal requirements, including Article 100m, paragraph (8) of Bulgarian Public
Offering of Securities Act;
(e) the consolidated report on payments to governments is prepared and made available in accordance with the
requirements of Bulgarian Accountancy Act;
6
Statement Pursuant to Article 100m, Paragraph (10) of Bulgarian Public Offering of Securities Act
Based on the procedures performed and our knowledge of the Group and the environment in which it operates, in our
opinion, there is no material misstatement in the description of the main characteristics of the internal control system
and of the risk management system of the Group in connection with the financial reporting process and also in the
information pursuant to Article 10, paragraph 1, items “c”, “d”, “f”, “h” and “i” of Directive 2004/25/EC of the European
Parliament and of the Council of 21 April 2004 on takeover bids, which are included in the consolidated corporate
governance statement, being a component of the annual consolidated management report.
Reporting on compliance of the electronic format of the consolidated financial statements included in the
annual consolidated financial report on the activity under Art. 100n, paragraph 5 of Bulgarian Public Offering
of Securities Act with the requirements of ESEF Regulation
We have undertaken a reasonable assurance engagement on the compliance of the electronic format of the
consolidated financial statements of Bulgarian Energy Holding EAD for the year ended on 31 December 2024 included
in the digital file „635400E1RWKJXPSBCV07-20241231-BG-CON.zip“, with the requirements of Commission
Delegated Regulation (EU) 2019/815 of 17 December 2018 supplementing Directive 2004/109/EC of the European
Parliament and of the Council with regard to regulatory technical standards on the speci fication of a single electronic
reporting format (“ESEF Regulation”). Our opinion is only regarding the electronic format of the consolidated financial
statements and does not include the other information contained in the annual consolidated financial rep ort on the
activity under art. 100n, para. 5 of Bulgarian Public Offering of Securities Act.
Description of Subject Matter Information and Applicable Criteria
Management has prepared the electronic format of Group’s consolidated financial statements for the year ended 31
December 2024 in accordance with ESEF Regulation in order to comply with Bulgarian Public Offering of Securities
Act. The rules for preparation of the consolidated financial statements in this electronic format are described in the
ESEF Regulation and in our opinion, they are applicable criteria for providing reasonable assurance.
Responsibilities of Management and Those Charged with Governance
Group’s management is responsible for the application of the requirements of ESEF Regulation in preparing the
electronic XHTML format of the consolidated financial statements. These responsibilities include the selection and
application of suitable iXBRL tags in accordance with the taxonomy of ESEF Regulation, as well as the application of
such internal controls, which are necessary for the preparation of the electronic format of Group’s annual consolidated
financial statements, that are free from material misstatements in accordance with ESEF Regulation.
Those charged with governance are responsible for overseeing the process for preparation of Group’s annual
consolidated financial statements and application of ESEF Regulation.
Auditors’ Responsibilities
Our responsibility is to obtain reasonable assurance about whether the electronic format of the consolidated financial
statements complies with ESEF Regulation. We applied the “Guidance on issuing an opinion on the application of
ESEF Regulation by issuers whose securities are admitted to trading on a regulated market in the European Union”
and conducted our reasonable assurance engagement in accordance with International Standard on Assurance
Engagements 3000 (Revised) “Assurance Engagements Other than Aud its or Reviews of Historical Financial
Information (ISAE 3000 (Revised))”. The standard requires that we comply with ethical requirements, design and
perform audit procedures to obtain reasonable assurance whether the electronic format of Group’s consolida ted
financial statements have been prepared in accordance with the applicable criteria described above. The nature, timing
and extent of our procedures depend on our professional judgement, including the risk of material misstatements
whether due to fraud or error, in applying the requirements of ESEF Regulation.
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with
ISAE 3000 (Revised) will always detect a material misstatement when it exists.
Quality Management Requirements
We apply the requirements of International Standard on Quality Management (ISQM) 1, which requires the firm to
design, implement and operate a system of quality control, including documented policies or procedures regarding
compliance with ethical requirements, professional standards and applicable legal and regulatory requirements for
registered auditors in Bulgaria.
We have complied with the independence and other ethical requirements of the International Code of Ethics for
Professional Accountants (including International Independent Standards) issued by the International Ethics Standards
Board for Accountants (IESBA Code) and adopted by BICPA, together with the ethical requirements of Bulgarian
Independent Financial Audit and Assurance of Sustainability Reporting Act.
7
Summary of the Work Performed
The purpose of the designed and performed procedures was to obtain reasonable assurance whether the electronic
format of the consolidated financial statements has been prepared in all material aspects in compliance with the
requirements of ESEF Regulation. In performing procedures for assessing compliance with the requirements of ESEF
Regulation on electronic (XHTML) format of Group’s consolidated financial statements, we used professional
judgement and applied professional skepticism. We also:
− obtained an understanding of the internal control and processes, related to the application of ESEF Regulation in
preparing Groups’ consolidated financial statements in XHTM format with iXBRL tags;
− checked that the enclosed XHTML format is valid;
− reconciling the data in the electronic format of the consolidated financial statements with the audited consolidated
financial statements;
− evaluated the completeness of Group’s tagging of the consolidated financial statements using the XBRL markup
language;
− evaluated the appropriateness of the use of iXBRL elements selected from the ESEF taxonomy and the creation
of extension elements where no suitable element in the ESEF taxonomy has been identified; and
− evaluated the use of anchoring in relation to the extension elements in accordance with ESEF Regulation.
We believe that the evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
Opinion on compliance of the electronic format of the consolidated financial statements with ESEF Regulation
Based on the performed procedures, our opinion is that the electronic format of the consolidated financial statements
of the Group for the year ended 31 December 2024, contained in the attached electronic file
„635400E1RWKJXPSBCV07-20241231-BG-CON.zip”, on which we are issuing a qualified audit opinion, has been
prepared in all material respects in accordance with the requirements of the ESEF Regulation.
Reporting Pursuant to Article 59 of Bulgarian Independent Financial Audit and Assurance of Sustainability
Reporting Act in relation to Article 10 of Regulation (ЕС) № 537/2014
In accordance with the requirements of Bulgarian Independent Financial Audit and Assurance of Sustainability
Reporting Act and in relation with Article 10 of Regulation (ЕС) № 537/2014, we report additionally the information as
follows:
− Grant Thornton OOD and Zaharinova Nexia EOOD, as participants in the DZZD "AUDIT BEH" consortium
were appointed as statutory joint auditors of the consolidated financial statements of „Bulgarian Energy
Holding“ EAD for the year ended on 31 December 2024 on 02.02.2024 for a period of three years (2024 -
2026).
− The audit of the consolidated financial statements of the Group for the year ended on 31 December 2024 has
been performed for fourth consecutive year by Grant Thornton OOD and Zaharinova Nexia EOOD.
− We confirm that our joint audit opinion is consistent with the additional report to the audit committee, which
was provided in accordance with Article 60 of Bulgarian Independent Financial Audit and Assurance of
Sustainability Reporting Act.
− We declare that prohibited non-audit services referred to in Article 64 of Bulgarian Independent Financial
Audit and Assurance of Sustainability Reporting Act were not provided.
− We confirm that we remained independent of the Group in performing the audit.
− For the period for which we were engaged as statutory auditors, we have not provided any other services to
the Group and its controlled undertakings, except for the engagements, which were disclosed in Group’s
consolidated financial statements.
30 May 2025
Grant Thornton OOD Zaharinova Nexia EOOD
Audit firm with reg. № 032 Audit firm with reg. № 138
Signed with electronic signature Signed with electronic signature
Silvia Dinova Stoycho Milev
Registered auditor, responsible for the audit Registered auditor, responsible for the audit
Signed with electronic signature Signed with electronic signature
Mariy Apostolov, Managing partner Dimitrina Zaharinova, Managing partner
Bulgaria, Sofia, 1421 Bulgaria, Sofia, 1309
26 Cherni Vrah Blvd. 157-159 Konstantin Velichkov Blvd., floor 1, office 3